Title: Geophysics SIG
1Geophysics SIG
- Work Meetings
- Houston, 12 March 2009
- Web Conference, 26 March 2009
2Energistics Meeting Policies
- Intellectual Property
- Participation indicates agreement to abide
- Do not disclose confidential
- Disclosures are deemed public
- Contributions are made with grant of rights to
use, modify, etc.
- Competitive Information
- Do not disclose pricing, costs, sales, plans,
schedules, etc. - Or your participation may be terminated
- If you are uncomfortable regarding such legal
matters, leave the meeting and report your
concerns.
3Meeting Agenda
- Welcome and Introductions
- Meeting Objectives
- Highlights of the 2008 Study
- ONGC Presentation
- Topics for Discussion
- Best practice elaborations
- Input to or promotional activities for SEG TSC
- Specifications definition
- RESQML coordination activities
- OGP (Positioning and Survey) Initiative
- Refinement of practical suggestions discussion
of next steps - Adjourn
4Welcome and Introductions
- Welcome and Logistics
- Introductions
- Please state
- Your name and company
- Your current role and responsibilities
- Your reasons and expectations for participating
today
5Meeting Objectives
- To begin to identify
- work practice improvement opportunities that can
be promoted by the SIG - collaboration opportunities that can be taken
forward by the SIG - To agree on several high value collaborative
activities for the SIG
6Membership and SIGs
EnergisticsBoard of Directors Management
Staff Advisory CouncilMembership
SIGs are standardsuser communities
PRODML SIGParticipants
WITSML SIG
RESQML SIG
Other SIGs
Energistics StandardsWITSML, PRODML, etc.
7Energistics Subject Areas
Asset/DataManagementSIG
AssetManagement
ltRESQML/gt
Reservoir
Reservoir
Production
Production
SIG
Geology SIG
Engineering
Engineering
Geology
Geology
eRegulatory SIG
Expl
Petrophysics
Petroleum
Expl
Petrophysics
Petroleum
Geology
Engineering
Geology
Engineering
Industry Services SIG
Drilling
Production
Facilities
Drilling
Production
Facilities
ltenergyML/gt
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Completion
Drilling
Production
Drilling
Completion
Production
Geophysics
Operations
Workover
Operations
Geophysics
Operations
Workover
Operations
Geophysics SIG
ltWITSML/gt
ltPRODML/gt
SIG
SIG
7
8Geophysics SIG
- Headlines
- Formal assessment study of work practice
improvement opportunities published - A member review meeting (October)
- Plans
- SEG relationship strengthening
- RESQML relationship
- Interpretation models
- Presence in India
- Identify viable activities for the SIG
- Member meetings (March 12, )
- Recruiting participation
- Collaboration site
GeophSIG
Geophysics
9(No Transcript)
10Best Practice Recommendations
- Principles
- Life cycle data procedures
- Data ownership responsibilities
- Sufficient resources to manage data
- Use industry standards
- Work Practice Improvement Opportunities
- Geodetics and CRS
- Service and data acquisition agreements
- Data compression
- Survey and line names
- SEG-Y rev1, SEG-D rev 3, SEG-Y/SEG-D alignment
- Integrate position and trace data
- Improve logs and reports
- Improve trade data evaluations
11Highlights of the 2008 Study
- Identifies typical delays in Acquisition,
Processing, Interpretation (API) and Data
Management life cycle - Identifies opportunities for improved use of
existing and rapid uptake of imminent SEG
standards - Recognizes need for greater standardization to
enable geophysics role in Integrated Operations - Recognizes need for collaboration with SEG and
OGP - Outlines guidelines for improved work practices
12Energistics Study on Delays
13ONGC Presentation Dr J.V.S.S.N. Murthy
14Topics for Discussion
- Geophysical Best practices elaborated
- Input to or promotional activities for SEG TSC
- Specifications definition
- RESQML coordination activities
15Geophysical Best practices elaborated
- Guiding Principles
- Enabling Work Practice Improvements
- Routine Work Practice Improvements
16Guiding Principles
- Define Life Cycle Data Procedures
- Define Ownership Responsibilities
- Assign Sufficient Data Resources
- Use Available Data Standards
17Enabling Work Practice Improvements
- Geodetic and Projected Coordinate Reference
Systems - Service and Acquisition Agreement Templates
- Data Compression Techniques
- Survey and Line Names
- SEG-D revision 3, SEG-Y revision 1
- SEG-Y / SEG-D Alignment
- SEG SPS / SEG-D Alignment Data Management
- Data Management
- General Metadata for data management and auditing
Note Underlined subjects were high priority on
March 12th.
18Routine Work Practice Improvements
- Position and Trace Data Integration
- EPSG Geodetic and Projected Coordinate Reference
System List Use - Observers Log Use
- Position Data and Survey Report Use
- Processors Log Use
- Acquisition Agreement Template Use
- Trade Data Evaluation
- SPS Land 3-D Survey QC
19Collaboration with SEG
- Possible inputs or promotional activities
- Units of Measure in SEG-D Rev 3
- Usage guidelines for SEG-D Rev 3 ?
- Promotion of SEG-Y Rev 1, SEG-D Rev 3 ?
- Requirements for SEG-Y / SEG-D alignment ?
- Other??
20Specifications definition
- Content standard for Observers Log
- Content standard for Survey Report (ref OGP)
- Content standard for Processing Log
- Exchange standard for Velocity Data
- Proposal in hand
- Will re-use Energistics XML assets (content and
architecture)
21Velocity Function Outline Schema
- velocityFunctionSetdocumentInformation
seismicSurvey surveyKind
(e.g. 2D or 3D)
seismicWaveKind indexKind
indexUnit coordinateReferenceSystem
velocityFunction velocityFunctionID
(Choice of (2-D seismic, 3-D seismic, well))
positionTuple
seismicDatum (to be clarified)
listOf(velocityKind
, velocityUnit)
VelocityTupleSet indexValue,
listOf(velocityValue), reflectorID, horizonName
indexValue, listOf(velocityValue),
reflectorID, horizonName
indexValue, listOf(velocityValue), reflectorID,
horizonName indexValue,
listOf(velocityValue), reflectorID, horizonName
indexValue, listOf(velocityValue),
reflectorID, horizonName
indexValue, listOf(velocityValue), reflectorID,
horizonName indexValue,
listOf(velocityValue), reflectorID, horizonName
indexValue, listOf(velocityValue),
reflectorID, horizonName
indexValue, listOf(velocityValue), reflectorID,
horizonName ... ...
velocityFunction
... ...
22Velocity Function - Issues
- Is there value in using the same XML schema for
velocities from wells as from seismic? - Who will add to the list of velocity types
(average, rms, interval, etc.? - Is there ever a need to mingle velocities for
different wave types in one data set? - What is the meaning of seismicDatum, or Datum
Time? Is the seismicDatum always a time, never a
depth? (What about in well data?) - Do we need to handle anisotropy? Now or later?
What are the detailed requirements for this? - The method (algorithm, interpolation technique,
manual) by which the velocity function was
created should be captured. (Doug Gregory,
Chevron, raised at SIG meeting Houston 12 March
2009) - Others?
23Velocity Function Enumerated Lists
- indexKind
- one-way-time, two-way-time, depth, measured
depth - surveyKind
- well check-shot, VSP, uphole, 2-D seismic, 3-D
seismic ... - velocityKind
- average, rms, interval, stacking, migration ...
- seismicWaveKind
- P, S, SH, SV ...
24 RESQML coordination activities
- RESQML is the successor to the RESCUE C
libraries for exchange between Geological
(static) and Reservoir Simulation (dynamic)
models - RESQML will be compliant with other Energistics
MLs - Geophysical Interpretations produce structural
and property models which provide horizon, fault
and other data into Geological and Reservoir
models - There is a requirement that the data and
meta-data of the geological objects should be
consistently represented at both levels - Process history and audit data are also needed
25OGP (Survey Positioning) Initiative
- Oil and Gas Producers Association
- Have custodianship of former UKOOA and SEG
seismic position data formats and of EPSG
Geodetic Dataset - New Initiative proposes to modernise
- P1 (post-processing) position data exchange
formats - P2 (pre-processing) position data exchange
formats - P6 seismic binning standard
- P7 (post-processing, archive) deviated well path
data - Requirements Questionnaire gathering user
requirements results to be presented in April - Plan to complete revisions by end 2009
- SEG D revision 3 will reference current PN
formats
26Practicalities
- Refine suggestions
- Recommendations from March 12 Meeting
- General metadata for data management and auditing
- Agreement templates by work practice profile
- Standard dataset names and identifiers
- Processor Log work practice improvements
- Velocity function specifications
- Coordination with RESQML SIG
- Next steps
- Web conference on March 26 at 0900 Houston,
1400 UK, 1500 Europe, 1930 India - Refinement of proposed collaborative activities
into timelines and calls for participation.
27Adjourn
Questions?Thank You!
More Information fromAlan Doniger
ltAlan.Doniger_at_energistics.orggtPaul Maton
ltPaul.Maton_at_ energistics.orggt