Title: EO1 Hyperion


1
Hyperion
Steve Carman, Hyperion Project Manager TRW
Space and Technology Division January 22, 1999
2
Hyperion Schedule and Issues
  • Schedule Status
  • Risk Assessment
  • Critical Problem Summary

3
Hyperion Project Schedule
Hyperion Schedule Status
4
Schedule Development
Hyperion Schedule Status
  • Project schedule broken into 10 subschedules,
    integrated in top-level project schedule using MS
    Project (gt3000 tasks).
  • Goal plan for instrument delivery 6/22/99 with
    30-45 days slack.
  • Additional Scope incorporated within 12-month
    schedule
  • Change to stand-alone instrument
  • Add current ripple reduction circuit to CEA
  • Add 1553/1773 conversion to HEA
  • Add parts screening requirements, re-buy 55 lots
    of parts
  • Add 4 cycles to T/V test
  • TRW senior schedule manager, Ron Roberts,
    supported schedule development update process
  • Detailed refinement with APMs improved delivery
    from 8/20 to 6/22/98
  • NASA GSFC conducted a Hyperion Schedule Review on
    10/7/98 at TRW
  • GSFC reviewers complimented TRW on quality and
    detail of schedule, approved schedule as baseline

5
Hyperion Schedule Weekly Update Process
Hyperion Schedule Status
  • Weekly schedule review and reporting process
  • Monday Weekly status report generated for NASA
    GSFC, emailed to EO-1 Project Office
  • Tuesday Parts procurement screening status
    updated
  • Participate in EO-1 project status telecon
  • Wednesday AM Fabrication, assembly test status
    updated by APMs
  • Wednesday PM Project manager schedule manager
    reviews and updates schedule with team
  • Thursday Schedule changes incorporated into
    master schedules, critical path analyzed
  • Friday Weekly executive report of project
    schedule status emailed to Exec VP GM of SEG,
    VP GM of STD by noon.
  • All MS schedule files emailed to GSFC EO-1
    Schedule manager

6
Hyperion Weekly Metrics
Schedule Status 1/18/98 Contractual Delivery
Date 6 July 1999 Current Projected Delivery
Date 9 June 1999 Days Slack to Contractual
Date 28 Slack to Delivery
7
Weekly Metrics, Contd
  • Summary Assessment (GGreen, YYellow, RRed,
    arrows indicate change from previous week á
    Improved, â Worsened)
  • Date 12/11 12/18 1/8 1/15 1/22 NOTES
  • Technical Y Y Y Y Y á See Critical Problems
  • Cost G G G G G
  • Schedule G G G G G
  • Overall G G G G G
  • Significant Progress
  • OMS completed VNIR SWIR grating alignment and
    SWIR ambient alignment.
  • SWIR FPA hexapod support structure failed Option
    1 Proof Load test.
  • SWIR FPA hexapod structure Option 2 began
    assembly.
  • Cryocooler completed testing with new cold head
    port welded shut.
  • CEA Control Slice completed testing with Test
    cryocooler ahead of schedule, validating flight
    software. New Test PROMs installed, correcting
    long-standing periodic data error retest with
    flight cooler planned.

8
(No Transcript)
9
(No Transcript)
10
Hyperion
Sensor Assembly (HSA) Flow
80
Schedule As of 1/5/99
Page 3 of 4
Housing Panels
Proof Load test
Adjust Filter Position?
SWIR FPA
required
HSA Housing
SWIR Mounting
Assembly
Hardware
SWIR FPM
SWIR ASP
12/7/98
VNIR ASP EParts
Heaters
50
SWIR Thermal
10/20/98
12/15/98
VNIR ASP 4CCA
Analog 1 PWB
Thermistors
A2A1
Strap
10/22/98
Analog 2 PWB
95
A2A2
VNIR ASP Hsg
VNIR ASP A2
8/18/98
8/7/98
Digital PWB
A2A3
VNIR FPA
VNIR Thermal
8/18/98
VNIR FPM
Clk Driver PWB
A2A4
Strap
Hyperion
VNIR Mounting
12/18/98
Hardware
Sensor
1/7/99
Test MLI
11/11/98
Assembly
VNIR FPE CCA
VNIR FPE PWB
A1
(HSA)
1/5/99 (Heat Pipe)
Cryo Radiator
11/11/98
VNIR FPE EParts
Panels
Carbon-Carbon
65
Radiator alternative
Cover Assy
preferred
Baffle/Aperture
94
Moog/SMD
Cover Actuator
Assembly
97
Baffle Assy
Inflight Cal
Baffle/Feedthru
13
7
Lamps
Assembly
Assembly
10/8/98
Optical Cube
IFCA Reflector
Cables
Pg. 2
10/6/98
Telescope
Mirrors
Opto-
Mechanical
Telescope
1/8/99
11/30/98
10/9/98
Telescope
LEA
Subsystem
Housing
Pg. 2
(OMS)
GIS
10/21/98
Housing
Pulse
Grating
12/8/98
12/3/98
Tube
Imaging
Beam Splitter
Cooler
Pg. 2
Spectrometer
10/2/98
12/1/98
GIS Mirrors
10/26/98
SWIR Grating
Feet
10/26/98
VNIR Grating
9/15/98
Slit
SSG Subcontract
11
Hyperion
Assembly Flow
Schedule As of 1/5/99 Page 4 of 4
Hyperion
Electronics
4/1/99
Assembly
(HEA)
Flight MLI
Hyperion
Hyperion
Environmental
Install Flight MLI,
Hyperion
Sensor
5/27/99
6/7/99
6/8/99 w/o Contingency
4/10/99
Acceptance
Pack Ship
Delivery
Assembly
Tests
(HSA)
3/15/99
Interconnecting
Cables (Swales)
Cryocooler
Electronics
2/26/99
Assembly
(CEA)
2/5/99
Hyperion
Instrument
Test Set
(HITS)
12
Top Five Critical Path Items
Hyperion Schedule Status
Total Slack
Critical Path
Status (Changes as of 1/20)
to 7/6/99
As of 1/15/99
(days)
4-day improvement in SWIR FPM alignment
SWIR Focal
27-31
enabled by test tool to stand in for hexapod
Plane Module
structure (Option 2).
HSA
Shop priorities changed upon DR disposition
28- 31
Honeycomb
and call to F.
Deninger schedule improved 3
Structure Assy
days.
SWIR
Engineering calculation of design details
29
Done
Alignment
accuracy of alignment process took longer
Mask
than expected.
(See CR3.) Flight Cooler complete, welded.
Cryocooler
33-36
Electronics control slice completed test S/W
Assembly
validation with Test Cryocooler.
Hyperion
Delays in final assembly due to delay in
33
Electronics
release of top assembly drawing.
Assembly
13
Risk Management Process
Hyperion Risk Management Status
14
Risk Evaluation Status
Hyperion Risk Management Status
15
Risk Issue Watch List
Hyperion Risk Management Status
16
Risk Issues Retired
Hyperion Risk Management Status
17
Critical Problem Status
Critical Problem Initiated Status CR1 New
Vibration Loads 11/13/98 Open CR2 Dichroic
Filter Performance 11/30/98 Closed CR3
Cryocooler Performance Anomaly 12/8/98 Closed
18
New Loads and Vibration Test CriteriaCritical
Problem No. 1
  • Dichroic beam splitter from supplier Opticoat
    failed to meet TRW specification in time
    required.
  • Large number of layers (gt50) were crazing under
    stresses of application.
  • Quality of filter performance so poor it would
    significantly impact Hyeprion performance.
  • TRW had contracted another vendor, ZCR, to
    produce the same coating as a risk reduction task
  • ZCR had come very close at time Opticoat called
    to request spec relief.
  • They successfully completed the coating a few
    days later, delivering 3 parts.
  • The part from ZCR meets all TRW specs except the
    wavelength at the 50 crossover point is 0.92
    microns instead of 0.95 microns. Science impact
    of this difference is negligible.
  • The ZCR filters were delivered to SSG in time to
    maintain schedule!
  • A victory for risk management
  • Thanks to excellent work by Don Wolpert in
    selecting and monitoring ZCR

19
SWIR Hexapod Reinforcement
  • Two-piece ring reinforces
  • lower SWIR hexapod cup.

20
Dichroic Beam Splitter Performance and Delivery
Critical Problem No. 2
  • Dichroic beam splitter from supplier Opticoat
    failed to meet TRW specification in time
    required.
  • Large number of layers (gt50) were crazing under
    stresses of application.
  • Quality of filter performance so poor it would
    significantly impact Hyeprion performance.
  • TRW had contracted another vendor, ZCR, to
    produce the same coating as a risk reduction task
  • ZCR had come very close at time Opticoat called
    to request spec relief.
  • They successfully completed the coating a few
    days later, delivering 3 parts.
  • The part from ZCR meets all TRW specs except the
    wavelength at the 50 crossover point is 0.92
    microns instead of 0.95 microns. Science impact
    of this difference is negligible.
  • The ZCR filters were delivered to SSG in time to
    maintain schedule!
  • A victory for risk management
  • Thanks to excellent work by Don Wolpert in
    selecting and monitoring ZCR

21
Cryocooler Performance AnomalyCritical Problem
No. 3
  • After the by-pass line tuning (11/18), the
    Hyperion pulse tube cooler passed the in-process
    performance test with .835W cooling at 110K
    (Hyperion spec) using 14.3 W power, and achieved
    1.2W cooling at 110K (Hyperion Upper Margin)
    using 19.9W.
  • The cooler completed the final purge and fill,
    followed by the pre-weld final performance test.
    During the pre-weld test (11/19), the cooler
    behavior was abnormal Less power was required to
    move the compressor with the same stroke.
  • For example, 13.5W power was input into the
    compressor with 90 stroke yielding a no-load
    temperature of 100K, in comparison to the normal
    case of 17.1W power for 90 stroke yielding a
    no-load temperature of 66.4K during the
    in-process performance test.
  • This sudden change in cooler performance was
    thought due to particle contamination in the
    by-pass line affecting the phase change. There
    was no detection of He leakage from the cooler.
  • Continued...

22
Cryocooler Performance Anomaly (contd)Critical
Problem No. 3
  • Corrective Actions
  • Purged filled cryocooler repeatedly through
    Thanksgiving holiday period to clear particle no
    improvement.
  • X-rays of assembly found no contamination, though
    some areas were opaque.
  • Check of compressor verified resonant frequency
    had not changed.
  • Disassembly found particles near entrance to
    feed-back line analysis verified the particles
    were residual stop-off material used in brazing
    operation.
  • Spare cold head production accelerated to replace
    failed unit.
  • Spare cold head encountered plating problems Cu
    plating and epoxy seals leaked badly. Replating
    after removal.
  • MP investigated plating problem while a third
    cold head was assembled, successfully plated,
    purged filled, and integrated with the
    compressor.
  • Testing successfully completed, final fill and
    weld done.
  • Problem Closed 1/19/99

23
Hyperion Design Overview
(Backup Charts)
24
EO-1 Coordinated Image Collection Opportunities
ALI and Hyperion Science on EO-1
L
Excludes thermal channel
Hyperspectral Analysis derives from the use of
contiguous spectral channels, allowing the use of
derivatives and sophisticated analyses
techniques. The large number of bands allows
complex systems to be addressed without concern
for under sampling typical of multispectral
systems.
25
Proven Designs Enable Rapid Hyperion Production
Hyperion Design Overview
26
Hyperion Subsystem Units
Hyperion Design Overview
Hyperion Electronics Assembly (HEA)
Hyperion Sensor Assembly (HSA)
Cryocooler Electronics Assembly (CEA)
27
Hyperion HSA Components
Hyperion Design Overview
28
OMS Exploded View
VNIR FPM
GIS
Alignment Cube
SWIR FPM
Fore-optic Primary Metering Structure
Strut/Flexure 4X
Housing Baseplate
29
Hyperion Sensor Assembly
Hyperion Design Overview
VNIR FPA farside (not shown)
Dual Channel Grating Image Spectrometer
SWIR FPA
Fore Optics EOC baseline
Common Slit Assy