Title: PowerPointPrsentation


1
FAIR Facility for Antiproton and Ion Research
Observers
Status of FAIR FAIR 2nd Instit. Meeting,
January 15/16th, 2008 H.H.Gutbrod Leader FAIR
Joint Core Team
Austria China Finnland
France Germany Greece
India Italy Poland
Slovenia Spain Sweden
Romania Russia UK
2
Official start of the FAIR Project on November
7th, 2007 at Darmstadt ..........................
.......... ...........with about 1400 participants
3
FAIR Start Event November 7th, 2007
4
  • We have a project under way!
  • Who decided to participate and has not yet
    started to work should start now!
  • Do not wait to get design drawings from
    somewhere!
  • You are the designer, producer,
    installer,commissioner!
  • JCT -later FAIR GmbH - is just project
    management

5
Status of Declarations from FAIR partner
countries Red written declaration, black no
written declaration yet, greenhigh chance for
add. contribution Austria 0.5 China 1.
minimum Finland 0.5 minimum France 1
minimum Greece ?? India 3
minimum Italy 40 Mio minimum
(3.36) Poland 30 Mio minimum
(2.5) Romania 1 Russia 5, has now
initiated steps for 10 Slovenia 1 Spain 2
minimum Sweden 10 Mio (0.84) UK 15 Mio
(1.25), has proposed additional 45 Mio
Sum 22,95 5 Russia 3.79 UK 31.74 of
FAIR _Project Further candidates Slovak
Republic, The Netherlands, Hungary, Georgia,
6
Call for EoIs sent out October 10th, 2007
7
Status of Response to Call for Expression of
Interest (EoI)
8
21 Expression of Interests received so far !
EoIs still missing from
9
WP 2.3 HEBT
10
WP 2.4 Super FRS
11
WP 2.5 Collector Ring CR
12
WP 2.6 NESR
13
WP 2.7 Proton Linac
14
WP 2.8 SIS 100
15
WP 2.9 P-bar Target and Separator
16
WP 2.12 SIS 300
17
WP 2.13 Electron Ring at NESR
18
(No Transcript)
19
Status of Response to Call for Expression of
Interest (EoI)
  • Call for Expression of Interest to participate in
    the construction of FAIR is a
  • big success
  • The FAIR accelerator complex will be built
  • by the leading experts of the FAIR countries!
  • Something money cannot buy!
  • Missing EoIs from France, Greece, Slowenia, UK
  • Missing MoU countries most urgently invited to
    follow up the call, since we need to advance at
    the ISC meeting on February 18th, upon
    recommendations of IKAB on January 8th
  • Certain overlap of interests require creation of
    accelerator consortia, e.g. p-Linac, NESR,
    Super-FRS etc..
  • Next steps .....

20
http//www.ihep.su/FAIR-meeting/index.shtml
21
January 15th, 2008 0900 0915 Welcome and
short presentation of the host laboratory Nikolai
Tyurin 0915 0930 Rosatom and FAIR Russia
Oleg Patarakin 0930 1000 Accelerator
complex of IHEP-Protvino Sergei Ivanov 1000
1030 FAIR Russia Research Centre Boris
Sharkov 1030-1100 COFFEE Break 1100
1120 Status of FAIR Expression of
Interests Hans Gutbrod 1120 1140 Report
from the IKAB meeting Horst Wenninger 1140
1210 Status report on FAIR accelerators,
general planning Dieter Krämer 1220
1250 Design and Engineering Issues
Standardization and Synergies Dieter Krämer
LUNCH break
22
1420 -1710 Start of discussions of work
packages in detail, milestones, readiness etc.,
short presentations of representatives of the
interested institutions (countries). 1420
1450 2.4, Super Fragmentseparator EoIs No. 1,
2, 11a, 13e, 13h, 13i, 14a, 15, 21 VECC (IN),
Profex (Ro), CIEMAT (ES), GSI, IMP (CN), Wroclaw
UT (PL), Soltan Inst. (PL), (France) for the
machine coordination Markus Steck 1450
1510 2.5 CR (Collector Ring) EoIs No.5a, 8b,
13b, 13c, 13h, 13i, 14b, 15, 21 Budker INP
(RU), ITEP (RU), GSI, IMP (CN), Wroclaw UT (PL),
Soltan Inst. (PL), for the machine
coordination Markus Steck 1510 1530 2.6
NESR (New Experimental Storage Ring) EoIs No.
5b, 11b ,13b ,13i, 21 Budker INP (RU), CIEMAT
(ES), GSI, Soltan Inst. (PL) for the machine
coordination Markus Steck 1530 1550 2.10
RESR (Recuperated Experimental Storage
Ring) EoIs No. 8b, 11c, 13b, 13c, 13h, 13i,
21 ITEP (RU), CIEMAT (ES), GSI, Soltan Inst.
(PL) for the machine coordination Markus
Steck COFFEE
23
1600 1620 2.3 HEBT (High-Energy Beam Transfer
Lines) EoIs No. 13h, 13i, 18, 20, 21 GSI,
ICSI (RO), Efremov (RU), Soltan Inst.
(PL) for the machine coordination Peter
Spiller 1620 1650 2.8 SIS 100 (Heavy-Ion
Synchrotron 100 Tm) EoIs No. 4, 7, 8a, 9, 12,
13b, 13f, 13g, 13h, 13i, 15, 18, 21 Finland,
Cracow UT (PL), ITEP (RU), JINR, VNIINM (RU),
GSI, Wroclaw UT (PL), ICSI (RO), Soltan Inst.
(PL) for the machine coordination Peter
Spiller 1650 1715 2.12 SIS 300 (Heavy-Ion
Synchrotron, 300 Tm) EoIs No. 3, 4, 7, 8a, 12,
19, 21 IHEP (RU), Finland, Cracow UT (PL), ITEP
(RU), VNIINM (RU), Italy, Soltan Inst.
(PL) for the machine coordination Peter
Spiller 17.15 19.00 Excursion to the IHEP
accelerator complex and the workshops.
19.30 Dinner at the Scientists club
24
January 16th, 2008 0900 1040 Continuation
of discussions of work packages in detail,
milestones, readiness etc. 900 925 2.7
Proton Linear Accelerator EoIs No. 8c, 13a,
13b, 16 ITEP (RU), GSI, Dept of Science and
Technology (IN), (France) for the machine
coordination Hartmut Eickhoff 925
955 2.9 Antiproton-Target, and 2.11, HESR
(High-Energy Storage Ring) for 2.9 EoIs
No. 13h, 13i, 21 for 2.11 EoIs No. 8b, 10, 17,
21 ITEP (RU), Jülich (DE), Sweden, Soltan Inst.
(PL) for the machine coordination Dieter
Krämer 955 1015 2.13 ER (Electron
Ring) EoIs No. 5c, 21 Budker INP (RU), Soltan
Inst. (PL) for the machine coordination
Markus Steck 1015 1050 Items not yet
covered Discussion leader Hans
Gutbrod 1050 1110 COFFEE break 1110
1300 Summary and focus on critical points,
multiple interest for one work package, specs,
way of collaborations, perhaps formation of
collaborations, Technical Design Reports, next
steps... Discussion leader Hans
Gutbrod 1300 LUNCH 14.30 End of the Meeting
25
2nd FAIR institutes meeting
26
Next Steps
  • Detailing of EoIs in upcoming meeting and
    weeks, especially identification of persons in
    charge, better specification of items,
    collaborations.......active collaboration with
    international FAIR partners ? strengthening the
    FAIR project and the FAIR JCT by detaching
    people to Darmstadt.
  • Preparation of Technical Design Reports
  • Setting up of Machine Advisory Committee
  • Drafting of contracts where possible
  • ---------------------------------
  • ISC meeting 19th of February 2008
  • Final Act by FAIR countries governments
  • Creation of FAIR GmbH early Summer of 2008
  • Staffing of managing director positions
  • But above all that
  • Continue or get started with the FAIR accelerator
    projects you want to work on!