Qu es Concerto - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Qu es Concerto

Description:

... with the WP2 for the experimental verification of S and W points of these tools. ... Workshops with small groups (meeting groups) ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 13
Provided by: reinald
Category:
Tags: concerto | group | sw

less

Transcript and Presenter's Notes

Title: Qu es Concerto


1
RENAISSANCE ZARAGOZA Report on progress on WP1
WP2 planned activities Lyon 27th April 2009
GEE-UdZ
2
Summary (27th/04/2009)
  • WP1
  • WP1.1
  • WP1.2
  • WP1.3
  • WP1.4
  • WP1.5
  • WP2
  • WP2.1
  • WP2.2
  • WP2.5

3
Activity Type RTD/Innovation
WP1 Research, Technological
and Innovation Development
  • W.P 1.1 Energy Policy, Planning, RD
  • W.P. 1.2 Definition and Validation of
  • Design Standards and Bids
  • W.P. 1.3 Wood-fuel supply chains assessment and
    organisation
  • W.P. 1.4 ESCo studies
  • W.P. 1.5 Socio-economic research

4
Summary (27th/04/2009)
  • WP1 Research, Technological and Innovation
    Dev
  • WP1.1 Ready for the final document (ZAR) on
    July/September 2009
  • WP1.2 Certification tools and analysis of current
    normative (coordination with the WP2 for the
    experimental verification of S and W points of
    these tools. Also to analyze the effect of
    changes just coming)
  • WP1.4 Urbic is ready to complete the ESCo
    theoretical analysis. Afterward, we (Urbic and
    UoZ) will start the study to propose the creation
    of two ESCo as some interesting applications to
    real cases.
  • WP1.5 Year 3 has been lost in what this is
    concerned due to ECODES withdrawal and the
    process substitution. This and the delay on
    experimental data from Digital Monitoring Network
    has forced UoZ to evaluate new strategies that
    increase the effectiveness to cover the original
    objectives in coordination with Lyon and the
    CONCERTO PLUS recommendations

5
Summary (27th/04/2009)
WP1
  • WP1.2 Certification tools and analysis of
    current normative
  • Software development for quick evaluation and
    optimization Meteo (ecobuildings) and URSOS
    (urban sustainability) (ongoing).
  • Climate data performed for the first real TRY in
    Aragón (finished).
  • Buildings evaluation with different tools
    dynamic calculations with TSBI3 -Bsym-, Energy
    Plus, Lyder and Calener, compared with static
    calculations made with Meteo and URSUS (ongoing).
  • Buildings analysis (in Valdespartera and out) to
    verify if certification procedures are working or
    need some modifications (ongoing).
  • 12 months program
  • Software evaluation and comparison including
    certification tools and optimization tools (ß
    version)
  • Conclusions about ecobuildings evaluation

6
Summary (27th/04/2009)
WP1 (Urbic)
  • WP1.2
  • Completed calculations of thermal and
    electrical demands of Zaragoza. Raising various
    scenarios of uncertainty Energy demand more or
    less than expected (depending on level of
    bioclimatic design), in order to analyze the
    feasibility of energy services in adverse
    scenarios (WP1.4).
  • WP1.3
  • Started work on the availability of biomass in
    the surroundings of Zaragoza, there arent
    significant results at the moment (close to end).
  • WP1.4
  • Once completed the technical-economic analysis
    of different options and analyzed the dependency
    with adverse scenarios Urbic and UoZ will start
    the study of several real cases that could be the
    application of the theoretical studies performed
    in precedent years what means an extra value
    with this new objectives.

7
Summary (27th/04/2009)
WP1
  • WP1.5 Alternative procedure to the previous
    methodology
  • We will start with the results o a survey of 1200
    people and will use the same test with an
    intensive work with selected groups with the
    support of blogs and forum in Internet
  • Selection of 15/18 buildings in Valdespartera and
    2/3 in Picarral to develop the following actions
  • Definition of people interested in the project
  • General presentations
  • Workshops with small groups (meeting groups)
  • Formation/information to interested people
    Providing users with saving ideas and tools in
    order to get data from them.
  • Organisation of visits to selected sites
  • /

8
Summary (27th/04/2009)
  • WP2
  • WP2.1 Data collecting starting last weeks. Works
    in collabo-ration with EVZ and Endesa. Most of
    work to be done
  • WP2.2 Valdespartera buildings evaluation (mostly
    done). Coordination with WP1.2 . It will be
    almost completed next 12 months.
  • WP2.3 Data validation to be done next months.
    Monitoring will be prepared also for Picarral and
    specific buildings. Coordination with Lyon and
    CONCERTO PLUS.

9
UofZ
WP 1.2 , monday, 27th abril 09
Comparison of methods and results of Z and L
WP 2.1 WP 2.2 WP 2.3
Coordinating the different actions centred on
users and the effect on habits and final energy
consumptions by using the successive series of
measured data
Final set up of probes in Valdespartera and CUS.
We are considering options for Picarral y CP C. D.
Data of houses probes by Telemando local net
Microclimate measures by Telemando local net
Simulations and analysis of buildings ongoing
Thermography analysis and air infiltrations in an
extended number of buildings to find constructive
techniques or elements that can be problematic or
inadequate
To completed data with electricity and gas
information
To analize the energy flows for the Analizar los
flujos energéticos completos de la urbanización
(con extensión a Picarral)
Crossing data with socioeconomic information
gathered from users to comparer efficacy of
saving measures
Development of a series of course materials for
training in different levels and different
professional people colleges, masters,
technician, promoters y administration
Dissemination of the results effect on the
energy consumption and its reduction, about the
changes in the attitude of users and there
habits, about the project R. and its different
elements and about the program CONCERTO
itself. Production of materials for dissemination
Coordinated work with Lyon and CONCERTO PLUS to
compare results and relative efficiencies
10
Summary (27th/2008)
WP2
  • WP2.2 Building simulation and performance
  • Information relative to the constructive elements
    of the dwelling blocks of each parcel has been
    provided by architects and / or the builders of
    the plots to start the simulation and
    certification process.
  • As a first step it is checked that the data are
    consistent with those stipulated in the partial
    plan. If the constructive elements are changed
    these new materials must fulfil to the superior
    features of the partial plan.
  • As the second step energy building simulation is
    made for each building with TSBi3 and EnergyPlus.
  • We provide recommendations to new buildings in
    order to optimize results when actions are
    possible.
  • Certification of buildings using the criteria of
    the certification program officer LIDER/CALENER

11
Blower Laboratory Tests
  • Lab tests have been done previous to a series of
    measures performed in Picarral and others to be
    done in Valdespartera.
  • So that we will verify the impact of new
    normative for the quality or indoor air.
  • Also a lab cell has been implemen-ted to check
    the thermal transmi-ttance of materials, windows
    and constructive elements when this information
    is not available.

12
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com