Title: L3 Muon status


1
L3 Muon status
  • Paul Balm
  • collaboration meeting, Oct 2000

2
Outline
  • L3Display
  • Online testing of muon unpacking
  • Quick review of tool status

3
L3Display
  • Currently no tools available for displaying tool
    results
  • Based on d0ve
  • d0ve D0 Visualization Environment
  • wireframe display, designed for debugging
    reconstruction code
  • Runs as offline framework package
  • Extensively documented
  • (see d0ve/doc area)

4
Example of a display
5
Using L3Display
  • Example d0ve_muon
  • muo_segmentreco, muo_trackreco must have run
  • d0ve_muon displays information in
    SimMUONHitChunk, MuoSegmentChunk, MuoTrackChunk
  • d0ve_l3
  • tools must have written DebugInfo in the Event
  • d0ve_l3 displays data in DebugChunk

6
Using L3Display (2)
  • Data is displayed by adding its Rep to the
    DisplayList
  • There are only few Reps for L3 data types
  • L3TrackRep, MuoTrackRep, L3ZRegionRep
  • If youd want to use the L3Display for other
    data, youll have to write a Rep
  • extensive documentation is available
  • Classes will live in package d0ve_l3
  • currently everything in package l3mutest
  • Still in debugging stage - release planned for
    end of October

7
Testing muon unpackingonline
  • Scintillator data from cosmics
  • 3 crates
  • What did L3 do
  • First time actual look at data!
  • unpacking hit reconstruction
  • Pass/reject based on hits in event
  • Test was successful
  • some events rejected (no hits- only in trigger
    crate)
  • some events successfully sent to Collector/Router

8
Online tests remaining
  • Repeat this test for PDT data
  • currently there is a problem of synchronization
  • no idea when this is fixed (being worked on)
  • then we can also try our tracking
  • Sync bits were not tested on in last weeks test
  • that test must be put in the code (MF)
  • Coincidence filter

9
Requests for muon commissioning
  • Coincidence filter
  • Pass if there is coincidence between specific
    scintillators
  • will greatly reduce noise (now gt90 noise!)
  • Implementation
  • using the run config only will be too coarse
  • will need RCP config - need to think
  • how to list all scintillators in RCP
  • how to discriminate internally in filter
  • finding the time to do it is a problem

10
Review of tool status
  • Unpacking - L3TMuoUnpack
  • online test successful - other tests to be done
  • DebugInfo needs to be implemented
  • Other tools
  • L3TMuoLocal, L3TMuoCentralMatch
  • first versions in CVS
  • need verification/debugging
  • DebugInfo
  • debugging is waiting for display

11
Review of tool status (2)
  • Tracking in calorimeter
  • work has started first version of interface
    defined, scope design of tools decided
  • ready within two weeks
  • Scintillator tool
  • planned for preco6
  • scintillator matching in segmentreco required
    before work can even start!
  • Global muon tool L3TMuon
  • MuonPhysicsResults needs review

12
Conclusions
  • L3Display
  • d0ve based event display for debugging
  • release planned for October
  • Online test of muon unpacking successful, but
  • need geometry_management, how to react to missing
    crates?
  • PDTs, sync bits
  • Tool status
  • DebugInfo next to be implemented
  • verification/debugging of L3TMuoLocal and
    L3TMuoCentralMatch is next (November)