Title: Kein Folientitel


1
Case studyForeign Direct Investment Transrapid-Ge
rmany-China
2
Case study--Background infomation What is
transrapid?
  • The Transrapid is the first fundamental
    innovation in railroad engineering since
    construction of the first railroads.
  • Compared to the traditional railway system, it
    has the advantage of high speed(The hourly speed
    can reach 400-550km) low pollution,low power
    consumption, low noise, high safety.
  • Today only very few countries including Germany
    and Japan have the technology of designing and
    producing transrapid.

3
Case study--Background infomation Shanghai
Airport Project Events
  • On 23rd January 2001 signing of the contract for
    the Shanghai airport project
  • 30 km between Pudong international airport and
    downtown
  • Costs of 9 billion RMB(1.1billion USD)
  • Based on the technology produced by the German
    Consortium Thyssenkrupp, Siemens and Adtranz of
    DaimlerChysler.
  • The first time for transrapid to be used for
    commercial purpose.
  • Its considered as a reference for late
    expansions.

4
Case study--Background infomation Shanghai
Airport Project Route
5
Case study--Background infomation Shanghai
Airport Project Events
  • April 2001 construction work on the transrapid
    project Shanghai began
  • The trains, power and control equipment are
    produced in Germany.
  • The guideway girgers are manufactured in China
    with supervision of the Germans.
  • Chinese companies are building the magnetic track
    and others.

6
Case study--Background infomation Shanghai
Airport Project Events
  • January 2003 Oneway trail operation
  • Germany Prime Minister Gerhard Schröder will
    cut ribbon.
  • September 2003 Return trail operation
  • December 2003 Project completion
  • (Formal operation)

7
Case study--Background infomation Shanghai
Airport Project Data
Route Length 30 km double track Link to
maintenance facilities 3 km single
track Stations 2 Number of vehicles in 2003 3
vehicles each with 5 sections (6 sections from
June 2004) Traffic Volume in 2005 10
million passengers in 2010 20 million
passengers in 2020 33 million
passengers Travel speed (max.) 430 km/h Trip
time 8 minutes Headway 10 minutes (option 5
minutes) Daily operation 18 hours
8
Case study--Transrapid Why does Germany invest in
China?
  • The technology mastered by Germany is mature.
  • Theyre able to produce transrapid.
  • Transrapid has a bright prospects despite high
    costs
  • Good trade relationship between China and
    Germany.(Japan also wants this project in China.)

9
Case study--Transrapid Why does Germany invest in
China?
  • Stable economic situation in China
  • Stable exchange rate of RMB
  • Good infrastructure
  • Stable-increasing economy (Increase
    rate at 7-8 per year)
  • Stable political situation in China

10
Case study--Transrapid Why does Germany invest in
China?
  • Transrapid is not very meaningful in Germany
    because
  • The territory of Germany is not large
  • Very developed traffic net(ICE)
  • But it has a bright future in China

Shanghai airport
Far East transrapid center in China ?
Beijing -Tianjin
Beijing -Shanghai
China,Eastasia
11
Case study--Transrapid Why does Germany invest in
China?
  • The product cycle model (Vernons).

12
Case study--Transrapid Why does Germany invest in
China?
  • "As the first to introduce the maglev
    transportation technology into commercial
    service, China will make a contribution to the
    world's future market development in the sector
    of maglev transportation."
  • --Hans Eichel
  • (Germany's Finance Minister)

13
Case study--Transrapid Benefits from this project
  • China
  • Develop enough Hi-tech
  • Increase local employment
  • Consumer benefits
  • Improvement in production quality
  • Increase export possibility
  • Spill-overeffect

14
Case study--Transrapid Benefits from this project
  • Germany
  • Advantage of cost through
  • Lower labor cost in China
  • Lower raw material cost in China
  • Lower tax
  • Increase export possiblity
  • Chain reaction
  • Employment restructure
  • Dodge the trade barriers