PRIORITIZATION OF ABANDONED MINES - PowerPoint PPT Presentation

1 / 46
About This Presentation
Title:

PRIORITIZATION OF ABANDONED MINES

Description:

PRIORITIZATION OF ABANDONED MINES – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 47
Provided by: regio98
Category:

less

Transcript and Presenter's Notes

Title: PRIORITIZATION OF ABANDONED MINES


1
PRIORITIZATION OF ABANDONED MINES
2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
Animas River Watershed
6
Upper Animas - Silverton
7
Animas River Stakeholders Group
  • Identify sources of environmental problems

  • Determine relative contributions of metals from
    these sources
  • Improve water quality where and when possible

8
Community - Based Decisionmaking
9
Upper Animas
10
(No Transcript)
11
Land Ownership
12
Water Quality(sufficient quality to support uses)
  • SAFE DRINKING WATER ACT CLEAN WATER ACT
  • Site Specific Standards
  • Use Attainability Analyses
  • Total Maximum Daily Loads (TMDLs)

13
(No Transcript)
14
Sediment and Colloidal Sampling
  • Pre- to post- mining bed sediments arsenic
    2X-6X cadmium 4X-10X lead 2X-10X
    zinc 2X-15X
  • Metals sorbing to Fe colloids

15
Church,et al (1997)
16
(No Transcript)
17
Toxicity Tests
  • 48 and 96-hr lethality on daphnids, minnows, and
    trout
  • Stream sediment 10-day tests similar results to
    water phase

18

19
Upper Animas
Cement Creek
Upper Animas
Mineral Creek
Silverton
20
Animas - Cement Creek
21
Cement Creek
North Fork
Prospect Gulch
Sunnyside/American Tunnel
Minnesota Gulch
Porcupine Gulch
Topeka Gulch
SILVERTON
22
Tracer StudiesB.A. Kimball USGS
  • Tracers were injected into Cement Creek during
    low flow in September 1996
  • Discharge was measured by injecting tracers at
    constant rates and measuring the dilution
  • Eight principal sources of metals loading to the
    mainstem were identified

23
Cement Metals Loads -
24
Cement Creek
North Fork
Prospect Gulch
Sunnyside/American Tunnel
Minnesota Gulch
Porcupine Gulch
High Zn
High Cu
Topeka Gulch
SILVERTON
25
(No Transcript)
26
Ross Basin - North Fork Cement Creek Loading
27
Cu Zn
Grand Mogul
Cu Zn
Mogul
Queen Ann
Cu Zn
Cu Zn
Red Bonita
High Metal Load Med. High Medium
Lower
Upper Cement Creek Drainage
28
(No Transcript)
29
(No Transcript)
30
Mogul Adit
31
Stakeholders Criteria
  • Environmental Impact
  • Dissolved Zn and Cu
  • Dissolved Fe
  • Existing or potential aquatic life
  • Technical Feasibility of remediation
  • Cost effectiveness
  • Treatability/feasibility
  • Cultural and Historic preservation

32
Dissolved Zinc or Copper
33
Dissolved Iron
34
Existing or Potential Aquatic Life
35
Water Quality at Point of Compliance
36
Treatability Feasiblity
37
Technical Feasibility
38
Accessibility
39
Cultural and Historic Preservation
40
(No Transcript)
41
Ranking of environmental impact
42
Decision-making
  • I wish you all the best of luck in this effort
  • Thanks to the ARSG

43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com