Gate Level Simulation Is Increasing Trend - PowerPoint PPT Presentation

About This Presentation
Title:

Gate Level Simulation Is Increasing Trend

Description:

simulations play a crucial role in functional verification in the process of hardware designing. The mechanism can be performed at different physical abstractions such as the Transistor level, Gate level, and Register transfer level. With the help of a Gate Level Computation in Dubai identifying and fixing glitches in the design is also relatively easy. – PowerPoint PPT presentation

Number of Views:331
Slides: 11
Provided by: falconsurveyme
Category: Other

less

Transcript and Presenter's Notes

Title: Gate Level Simulation Is Increasing Trend


1
Gate Level Simulation Is Increasing Trend
2
  • In general, simulations play a crucial role in
    functional verification in the process of
    hardware designing. The mechanism can be
    performed at different physical abstractions such
    as Transistor level, Gate level and Register
    transfer level. Usually, the RTL simulation alone
    is sufficient sign-off criteria for IP
    development.
  • However, in the case of SOC, it is necessary to
    use RTL and Gate Level Simulation for
    Verification Sign-Off. Currently, Gate Level has
    become a trending simulation. Thus, going for a
    gate-level survey in UAE is beneficial and
    identifies every detail. Therefore, you can
    implement any design confidently. It is still
    confusing about why use GLS look at the
    following.

3
What Is GLS?
  • The definition of "gate level" is that netlist
    view of a circuit. In general, it will generate
    via logic synthesis. In such a case, RTL
    simulation is pre-synthesis means GLS is
    post-synthesis. The netlist view refers to the
    complete connection list that includes gates and
    IP models with fully functional and timing
    behavior.

4
  • When it comes to RTL simulation, it has a zero
    delay environment. Importantly, events will
    arrive on the active clock edge. However, the GLS
    also has zero delays, and it can also frequently
    have used in unit delay or full timing mode. At
    the same time, the events can be activated by the
    clock, and they will spread based on the delays
    on the elements.
  • On the occasion of loading and wiring delay
    models of the netlist, it can be easily
    determined by using the synthesis tools. Even one
    can evaluate it by checking the output from the
    layout tools. It will come in SDF (standard delay
    format) file.

5
Why should prefer the GLS method?
  • Undoubtedly, GLS is an essential simulation
    method. However, one must know how running GLS is
    necessary right.

6
Reset/Initialization verification
  • Yes, GLS can be used in Reset Sequence /Power Up
    and System Initialization testing thus, it will
    verify the design's unintentional dependencies at
    the initial stage. Significantly, GLS can modify
    the whole structure as well.

7
2. X optimization in RTL
  • Venus has a beautiful name and is the second
    planet from the Sun. Its terribly hoteven
    hotter than Mercuryand its atmosphere is
    poisonous

8
Asynchronous verification
  • No matter what, GLS alone checks asynchronous
    path functionality. Along with it will assure
    that the constraints are perfect as well.
    Notably, it will test the newly added structures
    in the Netlist even while checking the working
    process of Netlist. With the help of a Gate Level
    Computation in Dubai identifying and fixing
    glitches in the design is also relatively easy.
    Therefore, GTS is necessary for all methods.

9
Contact Details
  • Address
  • 209, 2nd Floor - Apricot Tower
  • P.O. Box 238544, Dubai Silicon Oasis
  • Dubai - United Arab Emirates
  • Phone 971 4 3271414
  • Email info_at_falconsurveyme.com
  • https//www.falconsurveyme.com/contact-us/

10
Thank You
Write a Comment
User Comments (0)
About PowerShow.com