Diapositive 1 - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

Diapositive 1

Description:

SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) ... Shuttle is Attached. Payload Preparation Room (PPR) Cargo Package For ISS ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 49
Provided by: zxm4
Category:

less

Transcript and Presenter's Notes

Title: Diapositive 1


1
SHUTTLE PROCESSING (Before Flight Activities
Rarely Seen By The General Public)
DISCOVER --- DISCOVERY
2
External Tank Arrives by Barge from MS
3
(No Transcript)
4
External Tank
Vertical Assembly Building
5
Removing External Tank From Carrier
6
(No Transcript)
7
External Tank Enters VAB
8
External Tank in VAB
9
Preparing to Lift the Tank to Vertical
10
Lifting Tank
11
Solid Rockets Are Attached
12
Engines Are Attached To Solids
13
Engines Are Attached To The Shuttle In The
Shuttle Processing Facility
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
Shuttle In Sling Ready For Lift In VAB
18
Shuttle Has Been Moved To VAB And And Will Be
Attached To External Tank
19
(No Transcript)
20
Shuttle is Attached
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
Payload Preparation Room (PPR)
25
Cargo Package For ISS
26
New Module For ISS
27
Payload Ready To Be Moved to The Launch Pad
28
(No Transcript)
29
Payload Carrier Leaves PPR
30
(No Transcript)
31
Payload Being Moved To Launch Pad
32
(No Transcript)
33
Lifting Payload Into Position For Insertion
Into Discovery When It Arrives At The Pad
34
(No Transcript)
35
(No Transcript)
36
Shuttle Discovery Leaves VAB
37
(No Transcript)
38
Shuttle Crawler
TRIP Length--- 3 ½ mi Time--- 6-8 hours
Launch Pad
39
(No Transcript)
40
Crawler Control
41
(No Transcript)
42
DISCOVERY ARRIVES AT PAD
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
READY FOR LAUNCH
47
We Have Lift Off
48
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com