Marine Division Template PowerPoint Presentation - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Marine Division Template PowerPoint Presentation

Description:

Close-up inspection of hull envelope plating, all ballast & selected cargo tanks ... Close up of 1 transverse web in each centre cargo tank. Marine Services ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 23
Provided by: davidp95
Category:

less

Transcript and Presenter's Notes

Title: Marine Division Template PowerPoint Presentation


1
  • 2003 Lloyds Register of Shipping

2
  • Oil major requirements
  • more or less?
  • Presentation by
  • Graeme Blevins and Brian Henry
  • Consultancy Services Group


3
Objectives
  • Illustrate relationship between standards
    ClassgtESPgtCASgtCAP
  • Cover LRs view of oil major vetting
    requirements
  • Open discussion of class, statutory and CAP
    standards

4
Relative levels of inspections
CAP
CAS
ESP
CLASS
5
Actual benefits of CAP to tanker owners
  • Objective evidence of quality tonnage
  • Opportunity to attract major charterers
  • Wider selection of charters
  • Combining class/ESP, CAS CAP surveys

6
Intangible benefits to tanker owners
  • Opportunity to assess repair needs
  • Facilitated contact between owner/charterer
  • 3rd party assesses Oil Major requirements

7
Overview of CAP-LR
  • An independent rating scheme of ships structure,
    machinery and cargo systems
  • Allows owners, charterers, shippers and terminal
    operators to make objective judgements about a
    ships condition
  • CAP-LR is not a classification requirement
  • CAP-LR is not an endorsement
    nor a negation of classification

8
Overview of CAP-LR
  • CAP-LR is part of the vetting programmes ofBP
    gt20,000 Tonnes gt15 Years Valid to next DD
    FATIGUE
  • Petronas All ships gt15 Years Valid 30
    months FATIGUE
  • Preem gt5,000 Tonnes gt20 Years
  • Repsol gt5,000 Tonnes gt20 Years
  • Statoil gt 3,000 Tonnes gt15 Years Valid 3 Years
    CAP 2 lt 3,000 Tonnes have 4 Years CAP
    1 reduced scheme
  • Vela gt20,000 Tonnes gt15 Years
  • BP Repsol require CAP on hull structure only

9
Oil companies requirements
  • Confidence in the structure to survive 3 years to
    the end of service without reaching the stage
    that would need renewal under class requirements.
  • The risks of failure from corrosion and from poor
    design through fatigue are to be specifically
    addressed.

10
CAP Hull structure inspection
  • Close-up inspection of hull envelope plating, all
    ballast selected cargo tanks
  • General examination of all other cargo oil tanks
  • Ultrasonic thickness measurement
    of hull structure

11
ESP Hull structure Inspection
  • Close up of all ballast tanks
  • Close up of 1 complete wing cargo tank
  • Close up of all transverse bulkheads
  • Close up of 1 transverse web in remaining wing
    cargo tank
  • Close up of 1 transverse web in each centre cargo
    tank

12
IMO CAS Hull structure inspection
  • All web frame rings, in all ballast tanks
  • All web frame rings, in a cargo wing tank
  • A minimum of 30 of all web frame rings, in each
    remaining cargo wing tank
  • All transverse bulkheads, in all cargo and
    ballast tanks
  • A minimum of 30 of deck and bottom transverses
    including adjacent structural members, in each
    cargo centre tank
  • Additional complete transverse web frame rings or
    deck and bottom transverse including adjacent
    structural members as considered necessary by the
    attending surveyor

13
Conventional tanker with protective location
14
ESP close-up inspection
15
CAP close-up inspection
16
IMO CAS close-up inspection
17
Thickness measurement analysis
  • Submitted in LR TM software
  • Migrated to CAP-LR to obtain ratings for
    individual members judged against as-built rule
    scantlings
  • Structural members assessed are shell
    plating deck plating oil tight bulkheads web
    framing longitudinal stiffening fore and after
    peaks

18
Fatigue (optional)
  • Screening assessment
  • Based upon LR ShipRight FDA2
  • Typical loading patterns
  • Assumed corrosion rate
  • Identification of potential hot spots
  • Used to target inspection

19
Fatigue report format
20
Other aspects of CAP-LR
  • Machinery and Cargo
  • General examination of machinery and cargo
    equipment
  • Operational effectiveness of safety protection
    systems
  • Maintenance practices audit
  • Rating is calculated by weighting of relative
    criticality

21
Report
  • The CAP-LR report is a comprehensive statement of
    condition found
  • The CAP-LR certificate contains individual
    ratings from 1 (high) to 4 (low) for
  • hull structure
  • machinery
  • cargo systems

22
Building better business
Working together to improve business performance
Write a Comment
User Comments (0)
About PowerShow.com