  • Standard Contract Forum 24 April
    200813.30Customer Suite, BT Centre, London

3
Standard Contract Forum 24 Apr 2008
  • AGENDA
  • Introduction and Notes of Previous Meeting
  • Review of New and Amended Schedules
  • Consult 21
  • AIT Update
  • Interconnect Link Lead-times Update
  • 21 CN brief Contracting Update
  • Any Other Business

4
Standard Contract Forum 24 Apr 2008

Keith Mitchinson 24 April 08
5
Standard Contract Forum 24 Apr 2008
  • SIA CONTRACT DOCUMENTATION
  • UPDATING SCHEDULES DRAFTS
  • Schedule 01 ISI
  • Schedule 130 CSI
  • Schedule 131 VIC
  • typographical corrections
  • Schedule 225 Emergency Calls
  • Working on update to allow the use of Network
    CLI from 08 and 03 number ranges

6
21CN / Consult21 Update
  • Broadband
  • Interconnect
  • Pathfinder
  • End User Communications
  • Consult21 Working Group Activity
  • Useful Websites

23rd April 08
7
21CN Plan Status
  • The BT review of the 21CN Plan, which has the
    benefit of reflecting on the experiences to date
    from Pathfinder and other testing activity is
    nearing completion. The review has focussed on
    three main areas
  • Early realisation of benefits of the move to
    21CN for CPs and their end users
  • Expansion of flexibility and choice for CPs of
    the 21CN plan
  • Improving the levels of certainty of delivery to
    the plan.
  • Whilst Broadband and Ethernet product deliveries
    are on track, the approach to Voice (and the new
    voice products) is still being finalised
  • WBC trials continue, to enable an end of April
    launch


8
Broadband
  • The Wholesale Broadband Connect (WBC) product,
    delivering the faster broadband capability to end
    users on ADSL2 access technology, is planned for
    launch at the end of April 2008, with the
    Managed version of this product, (WMBC)
    following immediately after.
  • WBC is to launch with a footprint of some 1
    million end users, rising to around 10 million in
    one year.
  • IPstream will stay on 20CN, as will Datastream.
    The withdrawal of these products will be subject
    to consultation.


9
Interconnect
While the voice strategy is being determined, the
Tranche approach to DLE interconnect route
migration to VICs (virtual routes off the NGS
switches) has been suspended. In the meantime,
route closures and growth are subject to per
occasion bi-lateral discussions between BT and
CPs. The Next Generation PSTN Interconnect (NGN
Call Conveyance) product is due to launch in time
for mass migration. BT and the potential
triallist CPs are working on the testing
programme (tests, location, timescales etc) to
achieve this. The actual launch date is however
subject to review, as the concept of Mass
Migration is now affected by the elective
approach to end user migration. The 1G
Multi-Service Interconnect Links (MSIL) product,
which is required to carry both broadband (WBC)
and interconnect (NGN CC) services, has been
launched.

10
Pathfinder Migration Pilot in South Wales
The Bedlinog trial and end user feedback activity
gleaned some very useful feedback. Pathfinder
is now due to restart in May 08 with initially
75k end users being migrated between then and
January 09 (Phase 1). The scope of Phase 2 of
Pathfinder is subject to review and discussion
within Consult21 as a result of the proposed
approach to end user voice migrations

11
Communications
  • New information on the Consult21 website
  • Information for Resellers
  • New Users
  • Webcall updates continue, recent
  • WBCC product development
  • Next Generation Broadband migrations
  • Service data availability (datasets)
  • Details / replays can be found from the Consult21
    website


12
Consult21 Working Group Information
13
Consult21 Working Group Information
14
Useful Websites
  • Information and support for communication
    providers on the 21CN programme
  • http//www.btwholesale.com/consult21
  • The independent public information website
    covering the process of migration
  • http//www.switchedonuk.org
  • For general information about BTs 21CN
    programme
  • http//www.btplc.com/21CN/

15
Standard Contract Forum 24 Apr 2008

Erica Cumming 24 April 08
16
Standard Contract Forum 24 Apr 2008
  • AIT CONSULTATION
  • Industry briefed 31 January/1 February
  • Discussion at 20 February SCF
  • Return date of 28 February
  • 7 CPs responded
  • BT has responded individually on the matters
    raised and made amendments where appropriate

17
Standard Contract Forum 24 Apr 2008
  • AIT PROPOSED CHANGES AS A RESULT OF CONSULTATION
  • MAIN CHANGES
  • Requirement for working facsimile (2.4(f))
  • Confirm option to use e-mail if fax not
    functioning (2.5(a))
  • Facility to update notice forms in
    consultation with CPs (2.5(b))
  • Transit TO has until 5pm on the Working Day
    following the 14th AIT calendar day to re-issue
    the A1 Retention Notice on the TNO (rather than
    by 16th AIT calendar day - to account for bank
    holidays) (6.2(a))

18
Standard Contract Forum 24 Apr 2008
  • AIT PROPOSED CHANGES AS A RESULT OF CONSULTATION
  • MAIN CHANGES (cont)
  • Transit confirm TO to be active if
    unreasonable not to be so (4.2)
  • Assignment of rights confirm authorised
    signatories (7.4)
  • Discussed with industry group 23 April

19
Standard Contract Forum 24 Apr 2008
  • AIT IMPLEMENTATION
  • Supplemental Agreement
  • Update to Paragraph 14A
  • Annex D AIT definition reference out to
    Annex E
  • Insert new Annex E
  • Provision for Effective Date
  • Any Ofcom amendments to be incorporated by
    notice
  • Review of AIT 12 months from Effective Date

20
Standard Contract Forum 24 Apr 2008
  • AIT IMPLEMENTATION PLAN
  • Briefing and Supplemental Agreement to all
    players May 2008
  • Request signature by June 2008
  • Reference to Ofcom of non-signatories July
    2008
  • CPs will be given 6 months notice before
    effective date - as requested for implementation

21
Standard Contract Forum 24 Apr 2008

Keith Mitchinson 24 April 08
22
Standard Contract Forum 24 Apr 2008
  • 21CN brief Contracting Update
  • MASTER SERVICES AGREEMENT
  • ETHERNET MSIL
  • "Prototype MSA" notified in December
  • Launched January
  • Discussions still ongoing with industry

23
Standard Contract Forum 24 Apr 2008
  • 21CN brief Contracting Update
  • MASTER SERVICES AGREEMENT
  • WBC and ETHERNET MSIL
  • April MSA updated
  • Now covers both
  • Ethernet MSIL and
  • WBC
  • Reviews due MSA/MSIL July MSA/WBC in November

24
Standard Contract Forum 24 Apr 2008
  • 21CN brief Contracting Update
  • NGN CC
  • Expert contracts group proceeding (next
    meeting 28/04)
  • Looking at first drafts of
  • Planning and Operations Annex
  • SVLAN Schedule
  • Sample schedules (101/102 also 143
    - 04 proposed)
  • Definitions - proposed
  • Recognise need to coordinate with Consult21
    Contracts Group re boilerplate/overall contract

25
INTERCONNECT INFRASTRUCTURE LEAD TIME
REDUCTIONS Feedback Proposals to industry
lead-time consultationStandard Contract Forum
24th April 2008

26
CONSULTATION FEEDBACK
  • 4 responses to lead-time consultation document
  • Assumption that nil return reflects agreement
    to BT banding proposals

27
PROPOSALS
New PoC - Lead-time (6 months)
New PoC - Duct, Fibre Transmission
New PoC - Fibre Transmission
New PoC - Transmission only
New Route
New Route
Route Aug
6 months
25
85
110
45
Working Days
Existing
Proposed
28
PROPOSALS
  • Agreed ACO process to capture delivery type
  • This will ensure that
  • Both our customers and BT are aware of
    infrastructure requirements before circuit order
    placement
  • Circuit orders will be placed with the correct
    contractual lead-time
  • Industry notification implementation
  • These changes will require a standard 90 day
    industry notification
  • Current proposals are for launch 1st September
    2008
  • This document is circulated for the purposes of
    feedback discussion. It relates to plans
    currently under assessment and subject to design,
    development and contract. As such, the contents
    are subject to change.

29
Standard Contract Forum 24 Apr 2008

AOB Date of next Meeting 22 July 2008