Title: INTRODUCTION TO OUR PPT TEMPLATE
1(No Transcript)
2.
- Standard Contract Forum 24 April
200813.30Customer Suite, BT Centre, London
3Standard Contract Forum 24 Apr 2008
- AGENDA
- Introduction and Notes of Previous Meeting
- Review of New and Amended Schedules
- Consult 21
- AIT Update
- Interconnect Link Lead-times Update
- 21 CN brief Contracting Update
- Any Other Business
-
-
-
4Standard Contract Forum 24 Apr 2008
Keith Mitchinson 24 April 08
5Standard Contract Forum 24 Apr 2008
-
- SIA CONTRACT DOCUMENTATION
- UPDATING SCHEDULES DRAFTS
- Schedule 01 ISI
- Schedule 130 CSI
- Schedule 131 VIC
- typographical corrections
- Schedule 225 Emergency Calls
- Working on update to allow the use of Network
CLI from 08 and 03 number ranges
621CN / Consult21 Update
- Broadband
- Interconnect
- Pathfinder
- End User Communications
- Consult21 Working Group Activity
- Useful Websites
23rd April 08
721CN Plan Status
- The BT review of the 21CN Plan, which has the
benefit of reflecting on the experiences to date
from Pathfinder and other testing activity is
nearing completion. The review has focussed on
three main areas - Early realisation of benefits of the move to
21CN for CPs and their end users - Expansion of flexibility and choice for CPs of
the 21CN plan - Improving the levels of certainty of delivery to
the plan. - Whilst Broadband and Ethernet product deliveries
are on track, the approach to Voice (and the new
voice products) is still being finalised - WBC trials continue, to enable an end of April
launch
8Broadband
- The Wholesale Broadband Connect (WBC) product,
delivering the faster broadband capability to end
users on ADSL2 access technology, is planned for
launch at the end of April 2008, with the
Managed version of this product, (WMBC)
following immediately after. - WBC is to launch with a footprint of some 1
million end users, rising to around 10 million in
one year. - IPstream will stay on 20CN, as will Datastream.
The withdrawal of these products will be subject
to consultation.
9Interconnect
While the voice strategy is being determined, the
Tranche approach to DLE interconnect route
migration to VICs (virtual routes off the NGS
switches) has been suspended. In the meantime,
route closures and growth are subject to per
occasion bi-lateral discussions between BT and
CPs. The Next Generation PSTN Interconnect (NGN
Call Conveyance) product is due to launch in time
for mass migration. BT and the potential
triallist CPs are working on the testing
programme (tests, location, timescales etc) to
achieve this. The actual launch date is however
subject to review, as the concept of Mass
Migration is now affected by the elective
approach to end user migration. The 1G
Multi-Service Interconnect Links (MSIL) product,
which is required to carry both broadband (WBC)
and interconnect (NGN CC) services, has been
launched.
10Pathfinder Migration Pilot in South Wales
The Bedlinog trial and end user feedback activity
gleaned some very useful feedback. Pathfinder
is now due to restart in May 08 with initially
75k end users being migrated between then and
January 09 (Phase 1). The scope of Phase 2 of
Pathfinder is subject to review and discussion
within Consult21 as a result of the proposed
approach to end user voice migrations
11Communications
- New information on the Consult21 website
- Information for Resellers
- New Users
- Webcall updates continue, recent
- WBCC product development
- Next Generation Broadband migrations
- Service data availability (datasets)
- Details / replays can be found from the Consult21
website
12Consult21 Working Group Information
13Consult21 Working Group Information
14Useful Websites
- Information and support for communication
providers on the 21CN programme - http//www.btwholesale.com/consult21
- The independent public information website
covering the process of migration - http//www.switchedonuk.org
- For general information about BTs 21CN
programme - http//www.btplc.com/21CN/
15Standard Contract Forum 24 Apr 2008
Erica Cumming 24 April 08
16Standard Contract Forum 24 Apr 2008
-
- AIT CONSULTATION
- Industry briefed 31 January/1 February
- Discussion at 20 February SCF
- Return date of 28 February
- 7 CPs responded
- BT has responded individually on the matters
raised and made amendments where appropriate
17Standard Contract Forum 24 Apr 2008
-
- AIT PROPOSED CHANGES AS A RESULT OF CONSULTATION
- MAIN CHANGES
- Requirement for working facsimile (2.4(f))
- Confirm option to use e-mail if fax not
functioning (2.5(a)) - Facility to update notice forms in
consultation with CPs (2.5(b)) - Transit TO has until 5pm on the Working Day
following the 14th AIT calendar day to re-issue
the A1 Retention Notice on the TNO (rather than
by 16th AIT calendar day - to account for bank
holidays) (6.2(a)) -
18Standard Contract Forum 24 Apr 2008
-
- AIT PROPOSED CHANGES AS A RESULT OF CONSULTATION
- MAIN CHANGES (cont)
-
- Transit confirm TO to be active if
unreasonable not to be so (4.2) - Assignment of rights confirm authorised
signatories (7.4) - Discussed with industry group 23 April
19Standard Contract Forum 24 Apr 2008
-
- AIT IMPLEMENTATION
- Supplemental Agreement
- Update to Paragraph 14A
- Annex D AIT definition reference out to
Annex E - Insert new Annex E
- Provision for Effective Date
- Any Ofcom amendments to be incorporated by
notice - Review of AIT 12 months from Effective Date
20Standard Contract Forum 24 Apr 2008
-
- AIT IMPLEMENTATION PLAN
- Briefing and Supplemental Agreement to all
players May 2008 - Request signature by June 2008
- Reference to Ofcom of non-signatories July
2008 - CPs will be given 6 months notice before
effective date - as requested for implementation
21Standard Contract Forum 24 Apr 2008
Keith Mitchinson 24 April 08
22Standard Contract Forum 24 Apr 2008
-
- 21CN brief Contracting Update
- MASTER SERVICES AGREEMENT
- ETHERNET MSIL
- "Prototype MSA" notified in December
- Launched January
- Discussions still ongoing with industry
23Standard Contract Forum 24 Apr 2008
- 21CN brief Contracting Update
- MASTER SERVICES AGREEMENT
- WBC and ETHERNET MSIL
- April MSA updated
- Now covers both
- Ethernet MSIL and
- WBC
- Reviews due MSA/MSIL July MSA/WBC in November
24Standard Contract Forum 24 Apr 2008
- 21CN brief Contracting Update
- NGN CC
- Expert contracts group proceeding (next
meeting 28/04) - Looking at first drafts of
- Planning and Operations Annex
- SVLAN Schedule
- Sample schedules (101/102 also 143
- 04 proposed) - Definitions - proposed
- Recognise need to coordinate with Consult21
Contracts Group re boilerplate/overall contract
25INTERCONNECT INFRASTRUCTURE LEAD TIME
REDUCTIONS Feedback Proposals to industry
lead-time consultationStandard Contract Forum
24th April 2008
26CONSULTATION FEEDBACK
- 4 responses to lead-time consultation document
- Assumption that nil return reflects agreement
to BT banding proposals
27PROPOSALS
New PoC - Lead-time (6 months)
New PoC - Duct, Fibre Transmission
New PoC - Fibre Transmission
New PoC - Transmission only
New Route
New Route
Route Aug
6 months
25
85
110
45
Working Days
Existing
Proposed
28PROPOSALS
- Agreed ACO process to capture delivery type
- This will ensure that
- Both our customers and BT are aware of
infrastructure requirements before circuit order
placement - Circuit orders will be placed with the correct
contractual lead-time - Industry notification implementation
- These changes will require a standard 90 day
industry notification - Current proposals are for launch 1st September
2008 - This document is circulated for the purposes of
feedback discussion. It relates to plans
currently under assessment and subject to design,
development and contract. As such, the contents
are subject to change.
29Standard Contract Forum 24 Apr 2008
AOB Date of next Meeting 22 July 2008