AP2 Beamline and Debuncher Acceptance Improvements
Project Leader Keith Gollwitzer
High Gradient Lithium Lens Upgrades
Project Leader Jim Morgan
3 Motivation
Increase the number of antiprotons collected from the target by
Increasing the admittance of the AP2 beamline and the Debuncher to 35 p mm-mrad
Increasing the gradient of the collection lens to 100 kG/cm
Note Yield curves in model reduced by 10 to approximately account for chromatic effects 4
AP2 Debuncher Acceptance
Overview of plan
Status
5 AP2 Debuncher Acceptance -- Plan
Identify Limiting Apertures
Assemble Documentation and Drawings (FNAL Tech. Div.) (WBS 26.2.2.1)
Optical Survey and Alignment (WBS 26.2.2.2)
Chromatic correction of the AP2 beamline (LBNL) (WBS 26.2.2.7)
Improve AP2 and Debuncher Lattice models (WBS 26.2.2.8)
Beam based determination of limiting apertures (WBS 26.2.2.9.2)
Mitigate aperture restrictions
Redesign/modify/rebuild/relocate beamline elements (WBS 26.2.2.5)
Implement Beam Based Alignment
Instrumentation upgrades (WBS 26.2.2.3)
AP2 BPMs
Debuncher BPMs
Orbit control (WBS 26.2.2.6)
Install additional dipole trims in AP2
Motorized quad stands in the Debuncher
Beam Based Alignment (WBS 26.2.2.4)
Develop procedures
Software development
Beam studies (WBS 26.2.2.9)
6 AP2 Debuncher Acceptance Beam Based Alignment
Beam Based Alignment
Excite quad ? Measure Response ? Correct Orbit
We will be able to accomplish this because
Most quads have shunts installed
Upgraded BPMs in the Debuncher and AP2
Greatly increased orbit correction capability in the Debuncher and AP2
7 AP2 Debuncher Acceptance Chromatic Correction
New Task added since July 2003
Chromatic Correction of the AP2 Beamline
Work being done by LBNL
Model chromatic effects
Beam studies to test model
Propose correction scheme (August 2004)
AP2 line chromatic b-functions 8 AP2 Debuncher Acceptance Status (1)
Identification of limiting Apertures
Documentation and Drawings
AP2 Physical Aperture table complete. Apertures have been incorporated into the AP2 lattice model.
Debuncher Physical Aperture table was recently completed (still requires final error checking)
Optical Survey
Tunnel work is 90 complete (work includes network setup)
Survey data are being compiled and analyzed
Mitigate Aperture Restrictions
Recent developments
DRF3 move completed during the Fall 2003 shutdown
Design work started for vertical band 4 cooling array upgrade
Design work started for Debuncher extraction kicker beam pipe replacement
9 AP2 Debuncher Acceptance Status (2)
Implement Beam Based Alignment
Instrumentation
AP2 BPMs
Presently trying to understand and correct Deb. Extraction kicker noise Est. Completion SD 2004
DAQ hardware software upgrade
Est. completion Jan. 2005
Debuncher BPM upgrade
All 6 sectors installed and operational
Console software is functional and in routine use some improvements are still being made.
Orbit Control
Debuncher motorized quad stands
10 stands installed during the Fall 2003 shutdown
96 new bumps have been calculated and tested
Install an additional 20 stands during the Summer 2004 shutdown
10 AP2 Debuncher Acceptance Bumps New Debuncher BPM control system application ?
Angle bump at the extraction kicker using a combination of trim dipoles and motorized quad stands.
11 AP2 Debuncher Acceptance Status (3)
AP2 and Debuncher Lattice modeling
Working OptiM models of the AP2 line and the Debuncher exist
AP2 model has been updated with physical aperture information
Debuncher and AP2 models will be updated with physical aperture and survey information as the data becomes available
LBNL has developed a MAD model for the study of chromatic effects
Beam Studies
Recently completed studies (Sept. 2003 Feb. 2004)
Reverse proton studies
Observation of beam signal on all AP2 BPM cables
Commissioned the new Debuncher BPM electronics
Commissioned bumps with new motorized quads (nearly complete)
Development of beam based determination of Debuncher apertures
Stacking studies
Measure AP2 Debuncher admittance
(development of measurement techniques)
Development of AP2 BBA using Debuncher TBT
p bumps in AP2
12 AP2 Debuncher Acceptance
AP2 Debuncher admittances reported at the July 2003 review were
Horizontal 20 p mm-mrad, Vertical 12 p mm-mrad
Debuncher admittances reported at the July 2003 review were Horizontal 25 p mm-mrad, Vertical 20 p mm-mrad 13 AP2 Debuncher Acceptance Limiting Apertures The numbers in this column were calculated using b-functions at Dp/p 0 DRF3 was moved during the Fall 2003 shutdown and is no longer an aperture restriction. Table gives pre-move admittances. 14
High Gradient Li Lens
15 High Gradient Li Lens Goals Plan
Goal Operate a Lithium lens --
at a gradient of at least 1000 T/m (34 ?)
for at least 10 million pulses
Action Plan
New solid Li Lens design (began 2000) (WBS 26.2.1.2)
General Li Lens RD (WBS 26.2.1.3)
Autopsies of failed lenses
FEA model of present design
RD of various Lens technologies
Improve present Li Lens design (WBS 26.2.1.1)
Fabricate New Lenses (WBS 26.2.1.5)
16 High Gradient Lithium Lens New Design
Features
Diffusion bonded titanium body
Improved cooling
Li buffer volumes eliminated
Diffusion Bonding
Better, more uniform cooling of lens body
May allow use of new Ti alloy (Ti 10V-2Fe-3Al has a 15 40 better fatigue endurance limit)
Simplified lens fabrication
Elimination of weld joints on septum
17 High Gradient Li Lens -- Status
New Lens design (diffusion bonded lens)
Complete and test new lens design prototype 1
Presently being pulsed on test stand at design gradient
Over 1.5x106 pulses so far
Intend to pulse to failure
Construction on prototype 2 expected to begin in March 2004
General Lens RD
Lens autopsies complete
Continue to refine and expand FEA model
Ti 10-2-3 testing in process
Modifications to existing lens design
Presently operating a lens constructed with improved quality control procedures (Lens 28)
In the pipeline
Lens 29 (available in 2 weeks)
Lens 30 (available in 10 weeks)
18 WBS Overview 19 Milestones 20 Major Shutdown Work
Shutdown 2004
Install additional 20 motorized quad stands
Replace D4Q4
DRF2 Move
Shutdown 2005
Wider Vertical Band 4 cooling arrays
Upgraded Debuncher Injection Septum (SD 2004? )
Motorized stands for Debuncher injection extraction kickers
Possible modifications to Debuncher extraction kicker (SD 2004? )
Possible implementation of AP2 chromatic correction
Shutdown 2006
New Debuncher extraction kicker (if not modified during SD 04/05)
Implement of AP2 chromatic correction (if not implemented during SD 2005)
21 Conclusion The Bottom Line
Presentp yield
16?10-6p/POT
Expectedp yield
(1.1)?(33?10-6p/POT)
36?10-6p/POT
? 52 ?1010p/hr
Delivered to the Accumulator for stacking
For
8?1012 POT/pulse
(slip stacking)
2.0 sec cycle time
Note Yield curves in model reduced by 10 to approximately account for chromatic effects
PowerShow.com is a leading presentation sharing website. It has millions of presentations already uploaded and available with 1,000s more being uploaded by its users every day. Whatever your area of interest, here you’ll be able to find and view presentations you’ll love and possibly download. And, best of all, it is completely free and easy to use.
You might even have a presentation you’d like to share with others. If so, just upload it to PowerShow.com. We’ll convert it to an HTML5 slideshow that includes all the media types you’ve already added: audio, video, music, pictures, animations and transition effects. Then you can share it with your target audience as well as PowerShow.com’s millions of monthly visitors. And, again, it’s all free.
About the Developers
PowerShow.com is brought to you by CrystalGraphics, the award-winning developer and market-leading publisher of rich-media enhancement products for presentations. Our product offerings include millions of PowerPoint templates, diagrams, animated 3D characters and more.