2Introduction to CI - Agenda
- History of Continuous Improvement
- What is Lean?
- What is Six Sigma?
- Combining Lean and Six Sigma
- Goodrich Approach to Continuous Improvement
3History of Continuous Improvement
- Craft production prevails until the late 1700s
- Skilled Worker Starts and finishes order
- Dedicated special tools/All manual operations
- Parts custom fit
- High Cost High Variety
4History of Continuous Improvement
After World War II and through the 1970s,
Taiichi Ohno developed and refined the Toyota
Production System, the foundation for Lean
manufacturing
Jim Womack and his colleagues at MIT bring
attention to the Toyota Production System through
their books, The Machine that Changed the World
and Lean Thinking
Henry Ford in 1915 introduces mass production in
its purest form with a moving assembly line
producing Model Ts.
1900 A.D.
2000 A.D.
W. Edwards Deming, a student of Shewharts,
lectured Japanese industrial companies on
statistical management methods in 1950, after
being frustrated in similar attempts in the U.S.
Mikel Harry Based on his experience at GM and
Motorola, he along with others, developed the Six
Sigma concepts, which have been developed and
expanded by companies such as GE, Allied Signal,
Lockheed Martin, and Boeing.
Walter A. Shewhart, an engineer at Bell Telephone
Laboratories, developed statistical tools to
determine when corrective actions should be
applied to processes, including the SPC control
chart in 1924
5Class Discussion Lean/Six Sigma
- Numerous companies today are applying Lean and/or
Six Sigma. You may have had some exposure to
these concepts. Lets list any words/ideas you
associate with Lean and Six Sigma
6What is Lean?
- Based on the principles of the Toyota Production
System, Lean, at its core, is about the
systematic and continuous identification and
elimination of waste - Key Principles of Lean
Reference Executive Summary of Lean Thinking by
James P. Womack and Daniel T. Jones
7What is Lean?
- Lean involves multiple systems and methods
- Effective workplace organization and visual
controls - Improved machine layouts and multi-skilled
workers - Setup reduction
- One piece (or small lot) production
- Standard work to enable line balancing
- Kanban systems for Just-In-Time production
- Small group improvement activities (Lean Events)
8What is Lean?
Speed is a focus of Lean
All we are doing is looking at the time line
from the moment the customer gives us an order to
the point when we collect the cash. And we are
reducing that time line by removing the
non-value-added wastes.
- Taiichi Ohno
9Lean Example in the Factory
10Lean Example in the Office
- Lean Event Payment Request Process (Accounts
Payable) - Reduced process steps by 30
- Implemented 10 mistake-proofing ideas
- Applied visual controls
- To work area
- To user instructions for invoice submittals
- Improved productivity by 19
- Drove quality at the source
11What is Six Sigma (6s)?
- A structured approach for improving performance
- Emphasizes importance of customer critical
processes - Drives for perfection in those processes by
reducing variation and eliminating defects - Uses objective, fact-based analysis techniques
12What is Six Sigma (6s)?
- Sigma (s) is a statistical term that measures the
variation in a given process and corresponds to
parts per million defective (ppm)
2s308,537 ppm
3s66,807 ppm
4s6,210 ppm
5s233 ppm
6s3.4 ppm
13Why Six Sigma?
Why 99 is not good enough
3.8 Sigma (99 Good)
6 Sigma (99.99966 Good)
99 just wont cut it in todays world! Our
customers demand better!
14Six Sigma DMAIC
- Proven problem solving/project management
methodology - Mathematical tools for problem solving
- Advanced statistical techniques
15Six Sigma Example
Global Express Variable Frequency Generator Low
Saturation Volts (Vsat)
- Problem Definition Vsat production acceptance
test failures threatening customer deliveries and
production schedules at customer site.
Define
- Process Capability Analysis indicated a process
that could become more capable.
Measure
- Fishbone diagram and other analysis tools
identified poor control of glue viscosity used to
assemble stator and rotor core packs as a key
root cause.
Analyze
- More glue in a core pack means less iron which
means less volts. - Regression Analysis revealed the exact
relationship between stator rotor weight and
Vsat.
Improve
Control
- Understanding gained from Regression Analysis
allowed controls to be imposed. - As a result there have been no failures for Vsat.
16Combining Lean and Six Sigma
Think about any typical process
Six Sigma focuses primarily here
Value Added Activity
Lean focuses primarily here
Non Value Added Activity
Lead Time
- Lean ? predominant impact is on Process Speed
Lean and Six Sigma are complementary tools for
reducing cost and improving customer service
17Combining Lean and Six Sigma
18Toolbox Approach to CI
- Business problem defines mix of tools required
- Use whatever tool and improvement activity (Lean
event or Six Sigma project) best suits the
problem!
When uncertain which to use, let common sense
prevail select the approach that will work best
in the local environment and stick to the
fundamentals.
19CI History at Goodrich
- Legacy Goodrich
- Aerostructures adopted Lean in mid-1990s in
response to business crisis - Several other divisions followed independently
or with assistance from Aerostructures - All divisions have at least some exposure and
experience with Lean some isolated use of Six
Sigma - Decentralized approach
- Former TRW Aeronautical Systems
- Evolution to Six Sigma in late 1990s
- Solid foundation of training across AS
- Centralized approach
- Overall, some pockets of significant success, but
higher customer expectations and tougher market
conditions require that we take best practices
and lessons learned and apply them consistently
across the Enterprise
20Leverage Value of Enterprise-Wide Processes
21 GR Continuous Improvement Program
- Implement a single Goodrich-wide CI program that
encompasses traditional Lean and Six Sigma tools - Drawing on best practices from across Goodrich,
this program will include - Comprehensive CI Training
- Standard Materials
- Certification Process
- Management Review Process in SBUs
- Performance Measurement Reporting
- Common Assessment Tool For Measuring CI Progress
22Goodrich CI Program Elements
CI Overview 8 Hrs
Leadership Overview 16 Hrs
23 Goodrich CI Program Elements
- Certification
- Criteria established for standard training
certifications - Lean Practitioner, Lean Expert
- Six Sigma Green Belt, Black Belt
- Design Green Belt, Black Belt
- Management Review Process
- Each division/site to have a process and
structure to oversee the execution of the local
CI effort - Local process and structure should encompass both
Lean and Six Sigma
24 Goodrich CI Program Elements
- Performance Measurement
- Key operational metrics to be implemented
- Probable selections
- Inventory Turns
- On-Time Delivery
- Cost of Quality
- Value Added Per Employee
- OSHA Safety Statistics
- Common Assessment Tool
- Provides Roadmap for improvement
- Measures progress along five stages of maturity
25 Goodrich CI Program Elements
Enterprise Excellence Assessment
- Qualitative assessment of CI progress
- Five Stages of CI Maturity
- Seven Enablers
- Roadmap for Improvement
26Path to Enterprise Excellence
Stages of Maturity
Pursuit of Perfection
Value Chain Optimization
Enterprise Improvement
Localized Improvement
Foundations for Change