Nadcap Prime Tutorial - PowerPoint PPT Presentation

1 / 47
About This Presentation
Title:

Nadcap Prime Tutorial

Description:

David Handley. Head of Quality. BAE Systems Military Air Solutions ... Hamilton Sundstrand. David Thornhill. General Dynamics. Richard Vinton. Raytheon Company ... – PowerPoint PPT presentation

Number of Views:1055
Avg rating:3.0/5.0
Slides: 48
Provided by: prine
Category:

less

Transcript and Presenter's Notes

Title: Nadcap Prime Tutorial


1
Nadcap Prime Tutorial
  • February 16th 2009

2
Definitions
  • PRI Performance Review Institute is a
    not-for-profit affiliate of SAE whose mission is
    to Provide global, unbiased, independent
    manufacturing process and product assessments and
    certification services to the mobility industry
    for the purpose of adding value, reducing total
    cost, and facilitating teaming between primes
    suppliers. PRI administers Nadcap.
  • Nadcap The leading worldwide cooperative program
    of major companies designed to manage a cost
    effective consensus approach to special processes
    and products and provide continuous improvement
    within the aerospace and automotive industries.
  • Special Processes are those processes where the
    parameters are directly influenced by component
    geometry and/or the results cannot be confirmed
    by inspection, e.g., NDT, Plating, Heat Treating.
  • Products are the manufacturing output of the
    combination of distinct materials, parts and/or
    processes which forms a whole, e.g., Composites,
    Elastomer Seals, Electronics.
  • eAuditNet Audit software used to document audit
    results, attachments, letters, notes, schedules
    audits, supplier advisories, etc. with the
    ability to produce reports based on multiple
    criteria.

3
Performance Review Institutes (PRIs) History
  • November 1985 Government/Industry Equal
    Partners Conference recommends consensus solution
    to duplication of supplier quality assurance
    systems.
  • July 1990 PRI incorporated as a Not-For-Profit
    Trade Association. Launch Nadcap for Aerospace
  • July 2000 Roll-out of Nadcap Europe
  • November 2002 Full Launch of eAuditNet
  • October 2003 Roll-out of Nadcap Asia
  • April 2008 Roll-out of eQuaLearn

4
Key References for New Attendees
  • Nadcap Prime Tutorial
  • Attendees Guide
  • Antitrust (page 7)
  • Nadcap Personal Code of Ethics and Conflict of
    Interest (page 7)
  • PRI Website www.pri-network.org
  • eAuditNet Guides www.eAuditNet.com

5
Suggestions for New Attendees
  • Attend Task Group Prime Tutorial mini-orientation
    at the beginning of each meeting.
  • Introduce yourself to the Task Group Chair and
    Staff Engineer.
  • Become active in your Task Group, your comments
    are very important.
  • Complete the attendee questionnaire (survey).

6
Membership Responsibilities
  • User members are required to attend Nadcap
    meetings. If the member is unable to attend, an
    alternate shall be designated.
  • Reply to surveys, questionnaires and ballots that
    are circulated to members.
  • Carry through sponsorship and coordination of
    individual projects as assigned.
  • Prepare checklists for auditing and continuing
    surveillance.
  • Review resumes and interview auditors.
  • Review audit reports.

7
Nadcap Members
ITP
Thales
NASA
ZODIAC
AIRBUS
Parker Aerospace Group
Volvo Aero
Sikorsky Aircraft
SAFRAN Group
Vought Aircraft
Honeywell Aerospace
Rolls-Royce plc
EADS Space

Air Force, WPAFB
Ball Aerospace
DCMA
BAE Systems (USA)
Latecoere
Pratt Whitney
Hamilton Sundstrand
MD Helicopters
Raytheon Company
Israel Aerospace Industries
Hawker Beechcraft
Rockwell Collins
Moog Inc. (Aircraft)
Eurocopter EADS Defense Securities Systems
Bombardier
The Boeing Company
Liebherr-Aerospace SAS
Lockheed Martin
Rolls-Royce Corporation
EADS Military Transport Aircraft Div. (MTAD)
AVIO S.p.A
GSA
GE Aviation
309th Maintenance Wing- Hill AFB
General Dynamics Corporation
Goodrich Corporation
MTU Aero Engines
BAE SYSTEMS Military Air Solutions (MAS)
Bell Helicopter
Spirit AeroSystems
Alenia Aeronautica SpA
United Space Alliance
Cessna Aircraft Company
Textron Systems
SONACA
Heroux Devtek
Northrop Grumman Integrated Systems
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
Industry-Managed Active Customer Audits/Certs
12
Status Report - Supplier Audits
Audits scheduled through the end of 2009 are 91
of Plan
As of January 16, 2009
13
Status of Audits/Auditors (full time equivalent)
93.7
84.5
4069
3871
4015
79.6
3678
75
3707
65.5
65.5
3295
61.8
2852
2437
37
1466
YTD exceeds 30 excess capacity of Plan
2009 YTD at 91 of Plan
As of January 16, 2009
14
Nadcap Programs
  • Special Processes
  • Nondestructive Testing (NDT)
  • Materials Testing (MTL)
  • Heat Treating (HT)
  • Coatings (CT)
  • Chemical Processing (CP)
  • Welding (WLD)
  • Nonconventional Machining Surface Enhancement
    (NMSE)
  • Systems Products
  • Aerospace Quality Systems (AQS) -AC7004
  • Fluid Distribution Standards (FLU)
  • Elastomer Seals (SEALS)
  • Sealants (SLT)
  • Composites (COMP)
  • Electronics (ETG)
  • Fasteners (FAST)

15
Agenda
  • Nadcap Overview
  • Organizational Structure of Nadcap
  • Nadcap Process / eAuditNet

16
PRI/Nadcap Organizational Structure
  • Executive leaders
  • Legal entity
  • Fiduciary responsibility
  • Set policy
  • Provide the Vision

Policy
17
PRI Board of Directors
  • Scott A. Collinge
  • Director, Business General Aviation Customer
    Quality
  • Honeywell Aerospace
  • Wayne Brown
  • Director, BCA Supplier Quality
  • The Boeing Company
  • Wang Yong
  • Vice President Quality Safety
  • China Aviation Industry Company 1 (AVIC I)
  • Lawrence Jenkins
  • Executive Vice President, Quality Supplier
    Development
  • Rolls-Royce plc
  • David Schutt
  • Executive Vice President
  • SAE International
  • Junji Tsuji
  • General Manager of Engineering Group
  • Ishikawajima-Harima Heavy Industries Co.
  • Jerry Tarnacki
  • John Saliture (PRI Board Chair)
  • Director Of Supplier Quality Technical
    Performance
  • Northrop Grumman Corporation
  • Robert Briggs
  • General Manager Supply Chain Quality
  • GE Aviation
  • Mario Langlois
  • Quality Director
  • Bombardier, Inc.
  • Joël Rémond
  • Vice President Quality Continuous Improvement
  • SAFRAN Group
  • Bernard Veyssiere
  • Vice President Quality
  • EADS
  • David Handley
  • Head of Quality
  • BAE Systems Military Air Solutions
  • Steve Wells

18
PRI/Nadcap Organizational Structure
Policy
Tactical
  • Senior quality leaders managers
  • Oversee operation of Nadcap
  • Establish implement policy procedures
  • Task group coordination development
  • Identify, develop and deploy improvement

19
Nadcap Management Council (NMC)
  • Rossella Andreozzi
  • Alenia Aeronautica SpA
  • Diana Berube
  • Pratt Whitney
  • Sergio Bilbao
  • ITP
  • Pascal Blondet
  • Airbus
  • Robert Bodemuller
  • Ball Aerospace Technology Corp.
  • Christian Buck
  • SAFRAN
  • David Burger
  • Rockwell Collins
  • Mark Cathey
  • Spirit AeroSystems
  • Chet Date
  • Honeywell Aerospace
  • Jim Diamond
  • Henry Johansson
  • Volvo Aero Corporation
  • Quan Lac
  • Roll-Royce plc
  • Eric LeFort
  • Sonaca
  • Arne Logan
  • The Boeing Company
  • Frank Mariot
  • Vought Aircraft
  • John McBrien
  • GSA
  • Robin McGuckin
  • Bombardier Aerospace
  • Heather Meyer
  • Cessna Aircraft Company
  • Don Missel
  • Lockheed Martin Corporation
  • Jay Park
  • Dave Soong
  • Hamilton Sundstrand
  • David Thornhill
  • General Dynamics
  • Richard Vinton
  • Raytheon Company
  • Kevin Ward
  • Goodrich Corporation
  • Kirk Whalen
  • Heroux Devtek
  • Corwyn Berger
  • Bodycote Testing Group
  • Mark Brown
  • Braddock Metallurgical Inc.
  • Miguel Gerdel
  • Thermal Structures Inc.
  • David Eshelman
  • The Young Engineers
  • Ed Jamieson

20
PRI/Nadcap Organizational Structure
Policy
Tactical
Task Groups Special Processes Nondestructive
Testing Materials Testing Heat Treating Coatings C
hemical Processing Welding NM/Shot
Peening Systems Products Distributors Sealants,
Elastomer Seals AQS (AC7004) Fluid Distribution
Systems Composites, Fasteners
Technical
  • Technical Experts
  • Determine requirements
  • Develop documents
  • Accept corrective action
  • Final decision on accreditation

21
Agenda
  • Nadcap Overview
  • Organizational Structure of Nadcap
  • Nadcap Process / eAuditNet

22
Nadcap Procedure Hierarchy
23
Key Procedures
(located on eAuditNet, under View User
Documents)
  • NOP-001 Nadcap Operating Procedure
  • NOP -006 Supplier Advisory Process
  • NOP-008 Supplier Merit Program
  • NOP-011 Audit Failure Process
  • NTGOP-001 Nadcap Task Group Operating Procedure

24
Nadcap eAuditNet Process
Supplier Action
PRI Staff Action
Suppliers
PRI Audit Scheduled
Auditor Assigned
Request Audit
Task Group Approval
Audit Completed
PRI Technical Staff Review
Issue Cert
Prime Action
25
Audit Process
  • PRI/Supplier Schedules the Audit using
    eAuditNet.com
  • Nadcap Checklists and Preparation Instructions
    available
  • Nadcap Customer Support Initiative (NCSI)- free,
    web-based training program
  • Encouraged to perform self-audit
  • Auditor Conducts the Audit using the applicable
    Nadcap checklists (located on eAuditNet)
  • Daily briefing a final post-audit meeting
  • Auditor Prepares Cover Letter and attaches to
    audit report (uploaded into eAuditNet)
  • Supplier has 21 calendar days to initially
    respond to any findings (7 calendar days for
    subsequent responses)

26
Industry Managed
Audit Checklist
Industry experts manage all key steps
27
Nadcap - Industry Working Together
28
Relationship between Audit Criteria (AC), Auditor
Handbook and Prime Requirements
29
Industry Managed
Audit Checklist
Auditor Qualification Selection
Industry experts manage all key steps
30
Auditor Selection/Interview/Performance
  • Core and Technical Requirements are Established
    by Task Group
  • Potential candidates complete a pre-screening
    questionnaire on eAuditStaff.com
  • Interviewed by Task Group
  • Testing/Certification (Optional)
  • Training Audits
  • Review of Training with Report from Lead Auditor
  • Approval by Task Group
  • Continual Monitoring through Audit Reviews
  • Annual PRI/Nadcap Training

31
Auditors Critical to Nadcap
  • Highly skilled technical background with average
    of 30 years experience in the Special process
    audited
  • Unlike ISO or EN 9000 based audits, Nadcap
    auditors do not make the final decision
  • Nadcap auditor goal is to evaluate and report the
    technical competency and compliance of the
    supplier

32
Sample of Current Auditors Experience
33
Industry Managed
Audit Checklist
Auditor Qualification Selection
Industry experts manage all key steps
Audits Conducted
34
Audit Content
  • Quality Systems
  • Special Process and Product Specific Requirements
  • Compliance/Job Audits
  • NDT 3 Witnessed Compliance Jobs per Method and
    3 Paperwork Completed Compliance Jobs per
    Method
  • Heat Treating 2 Long Jobs-8 Short Jobs
  • Materials Lab Witnessing of All Test Methods
  • Chemical Processing Minimum of 4 Job Audits
  • Coatings 2-11 Job Audits (Based on Scope)
  • Welding 2 Job Audits per Method
  • Nonconventional Machining 2-10 Job Audits
  • Surface Enhancement 2-6 Job Audits
  • Composites 15-30 Job Audits (Based on
    Manufacturing Flow)
  • Electronics Complete 1 Job Audit

35
(No Transcript)
36
Industry Managed
Audit Checklist
Auditor Qualification Selection
Corrective Actions As Required
Industry experts manage all key steps
Audits Conducted
Audit Results
37
NCR Classifications
  • Major Nonconformance
  • The absence of, or systemic breakdown of, the
    Process Control and/or Quality Management
    system.
  • Any non-conformance where the effect impacts or
    has the potential to impact the integrity of the
    product.
  • Minor Nonconformance
  • A non-systemic lapse in conformance to the
    Process Control and/or Quality Management
    system.

38
Audit Review
  • PRI Staff Review
  • Staff Reviews Package for Completeness
  • Review Audit Report
  • Clarification Changes (electronically) - Contact
    Auditors for Clarification
  • Review Supplier Corrective Action
  • Close-Out or request additional information via
    Forums
  • Audit Report Package is submitted via eAuditNet
    for Task Group Review
  • Task Group Review
  • Task Group decides Procedure for Review
  • - Sub-group review, entire Task Group Review
  • Task Group Reviews for Correctness
  • - Technical Comments, Supplier Responses,
    Technical Completeness, Auditor Summary
    Letter, Identify Additional Findings
  • Completes Review of Each NCR and
    dispositions (NCR Status)
  • Discuss Results with Task Group within
    Forums
  • Task Group Votes on Accreditation via
    On-Line Balloting

39
Nadcap - Industry Working Together
40
eAuditNet for Subscriberswww.eAuditNet.com
  • Subscribers can use eAuditNet to
  • Use My QML to specifically search for your
    companys suppliers
  • Lookup audit details for a supplier including
    checklist details, nonconformance (NCR) details,
    and Supplier and Task Group NCR responses
  • Lookup the current audit status of a supplier
  • Download or print hard copy checklist(s)
  • View new or existing supplier advisories
  • View all Nadcap procedures
  • eAuditNet Company Administrator, you can use
    eAuditNet to
  • Create new eAuditNet users for your company
  • Edit current eAuditNet users for your company
  • Accept or reject eAuditNet users that select your
    company during registration
  • Set-up company Users to receive weekly e-mails
    regarding your QML supplier audits that were
    submitted (Contacts Application)
  • If you are a Task Group Member, you can use
    eAuditNet to
  • View and discuss supplier audit NCRs
  • Ballot on supplier audit and merit
    recommendations
  • An eAuditNet Subscribers Audit Review Guide and
    eAuditNet Company Administrators Guide can be
    downloaded from eAuditNet using Public Documents.

41
Industry Managed
Audit Checklist
Process Evaluation/ Improvement
Auditor Qualification Selection
Corrective Actions As Required
Industry experts manage all key steps
Audits Conducted
Audit Results
42
(No Transcript)
43
(No Transcript)
44
Quality/Business Improvements for Suppliers (SSC
2007 Survey)
If your company has been accredited for one (1)
year or more, and your company measures business
and/or quality trends, have you seen improvement
in this area(s) related to your Nadcap
accreditation(s)? Select all that apply.
45
(No Transcript)
46
Next Nadcap MeetingOn-line registration
available at www.pri-network.org
  • July 13-17, 2009
  • Hotel Dedeman Istanbul
  • Yildiz Posta Caddesi, 50 Esentepe
  • 34340 Istanbul, Turkey
  • Reservation information will be posted on the
  • PRI Website when available.

47
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com