Title: Post-Tensioning
1Post-Tensioning in Building Construction
2Examples of Post-Tensioned Building Construction
3Constructed with Unbonded Post-Tensioning
Daniel Burnham Court, San Francisco
4CONSTRUCTED WITH UNBONDED POST- TENSIONING
Red Lion Inn
5 Xerox Center, Santa Ana, California
Lakeshore Tower, Irvine, California
La Palma Center, La Palma, California
EXAMPLES OF POST-TENSIONING PARKING STRUCTURES
6Constructed with Unbonded Post-Tensioning
University of California Medical Center, Irvine
7CONSTRUCTED WITH UNBONDED POST TENSIONING
San Jose International Airport
8POST-TENSIONED CONSTRUCTION WITH UNBONDED TENDON
Cal-State Northridge C.I.P. Parking Structure
9POST-TENSIONED CONCRETE FLOOR SUPPORTING STEEL
FRAME OFFICE BUILDING
Hybrid Construction
10BASE PLATES FOR COLUMNS TERMINATING ON PT SLAB
11POST-TENSIONED HYPRID CONSTRUCTION
Irwin Plaza, San Rafael, California
12VIEW OF THE PARKING LEVEL OF A HYPRID
CONSTRTUCTION
Irwin Plaza, San Rafael, California
13POST-TENSIONED MAT FOUNDATION
Fortaleza, Brazil
14POST-TENSIONED MAT FOUNDATION
Kodak Building, San Jose
15POST-TENSIONED GROUND SUPPORTED SLAB READY FOR
CONCRETE POUR
16UNITED STATES POST-TENSIONING STEEL TONNAGE 1999
STATISTICS Buildings 33 Bridges 17
Ground supported slabs 43 Earthwork
6 Miscellaneous
1 ____________________________________ Total
100
17ADVANTAGES OF POST-TENSIONING
- Longer clear spans
- Thinner slabs
- Lesser floor-to-floor heights
- Shorter building height
- Lesser weight
- Improved seismic performance
- Faster construction cycle
18- Post-Tensioning
- System
- Unbonded
- Grouted (Bonded)
19ARRANGEMENT OF UNBONDED POST-TENSIONING SYSTEM
20COMPONENTS OF A GENERIC 12 mm (1/2 in.) STRAND
TENDON
21HARDWARE FOR CORROSIVE ENVIRONMENT
22ASSEMBLED ANCHOR DEVICE FOR CORROSIVE ENVIRONMENT
23LIVE (STRESSING) ENDS AT SLAB EDGE
24UNBONDED POST-TENSIONING CONSTRUCTION
High Rise Building 3rd Street San Francisco
25UNBONDED POST-TENSIONING CONSTRUCTION
Red Lion Inn Hotel Modesto, California