Title: Road Network Upgrading
1Road Network Upgrading And Overland Trade
Expansion In Sub-Saharan Africa
Piet Buys Uwe Deichmann David Wheeler
Development Research Group
2Sub-Saharan Africa Continental Capitals
Citiesgt500,000 Population
3Least-Distance Network Total Length 108,000
Km. 885 Road Segments 3,403 Connected City Pairs
4Our Resumé
PB, UD, DW Overland Travel
5Road Network Current Network Quality
6Using The Network Model For Road Improvement
Strategy
Benefit Cost Analysis for Network Upgrading at
Different Scales
- Continental
- Regional
- National
- Sub-National (data permitting)
7Benefits Trade Flows Between Cities Countries
- Network Trade Factors
- Economic Scale
- Road Distance
- Road Quality
- Trade Agreements
8Estimating Trade Flows Econometric Analysis
via Gravity Modeling
Data Source IMFDOT, 2000-2003 Sample Size 1128
Observations
Results t-statistics in parentheses gt 99
confidence
9Gravity Model Application Projecting Network
Trade Flows (US)
Road Quality
Best
1
2
3
4
Worst
5
10Gravity Model Application Network Trade Flows
(US)
Current Total for SSA 10 Billion
11Gravity Model Application Upgraded Network
Trade Flows (US)
Econometric Projection 30 Billion
12Gravity Model Application Network Trade Flows
(US)
Econometric Projection Annual Trade (Billion)
Upgraded
Current
10.1
13Cost Econometric Analysis of Road Projects
Program Network Upgrade to Class
2
Road Quality
Best
1
2
3
4
Worst
5
14Data Source World Bank ROCKS Database
Sub-Saharan Africa 470 Road Projects Costs in
US 000/Km. of Improvement
15Cost Function Estimation
Dependent Variable Unit Improvement Cost
Independent Variables
- Existing road condition (percent paved)
- Wage (per capita income)
- Governance (CPIA for accountability, corruption)
- Rainfall (Daily mean for primary road network)
- Regional controls (West, Central, East Africa)
- Project type controls
- 7 Upgrading categories
- 6 Maintenance categories
16Projection From Estimated Cost Function
17Program Network Upgrade to Class
2
Econometric Projection Upgrade Cost (Billion)
Upgrade
Maintenance
28.4 15.6
1 Std. Error
1.2 0.7
1 Std. Error
20.7
0.9
-1 Std. Error
-1 Std. Error
18Network Upgrade Program 5-Year Upgrade 10-Year
Operation