Title: Administration Reception and Hallway
1Administration Reception and Hallway
2Administration Principals Office
3Administration Media Addition A-Hall to the
East
4Administration Media Addition
5Administration Media Addition
6Administration Media Addition
7Administration Media Addition
8Administration Media Addition
9Administration Media Addition
10Administration Media Addition
11A-Hall
12A-Hall
13A-Hall
14A-Hall Restrooms
15A-Hall Restrooms
16B-Hall classroom freshly waxed floor
17B-Hall
18B-Hall Locker installation begins
19C-Hall
20C-Hall
21C-Hall HM Frames at Media Center
22C-Hall English Resource Room
23C-Hall Restrooms Flooring in progress
24C-Hall Typical Classroom
25D-Hall
26D-Hall
27D-Hall Math Resource Room
28D-Hall Glue prior to VCT installation
29D-Hall - Restrooms
30E-Hall (Back Hallway) Typical Classroom
31E-Hall Terrazzo floor installation in progress
at East end
32Back Hallway at Media Courtyard
33Home Economics Classroom
34Cafeteria
35Cafeteria Expansion Friday morning
36Cafeteria Friday morning
37Cafeteria Friday at Noon
38Outdoor Dining
39Cafeteria on left - Outdoor Dining Area between
building
40Loading dock outside of the Kitchen
41Kitchen Floor as seen Thursday with clear coat
42Kitchen Floor as seen Friday morning
43Lower Level Girls Locker Room Concrete
benches poured Thursday
44Lower Level Boys Locker Room Concrete Benches
45Lower Level - Painting
46Lower Level Hanging wire for drop ceiling
Friday morning
47Mechanical Room - Pumps for Geothermal system
48Mechanical Room - Pumps and piping for Geothermal
system
49Science Addition Exterior Ceiling
50Gym Roof top equipment placement - Friday
51Site work - Sidewalk
52Site work - Sidewalk
53Site work - Sidewalk
54Site work - Curbing
55Site work - Curbing
56Site work Front overview
57Site work Bus Parking
58Site work Lot G Topsoil Stripping
59Site work Lot G Topsoil Stripping
60Site work
61Site work Storm drain installation on West side
of E-Wing