Title: Diapositive 1
1SHUTTLE PROCESSING (Before Flight Activities
Rarely Seen By The General Public)
DISCOVER --- DISCOVERY
2External Tank Arrives by Barge from MS
3(No Transcript)
4External Tank
Vertical Assembly Building
5Removing External Tank From Carrier
6(No Transcript)
7External Tank Enters VAB
8External Tank in VAB
9Preparing to Lift the Tank to Vertical
10Lifting Tank
11Solid Rockets Are Attached
12Engines Are Attached To Solids
13Engines Are Attached To The Shuttle In The
Shuttle Processing Facility
14(No Transcript)
15(No Transcript)
16(No Transcript)
17Shuttle In Sling Ready For Lift In VAB
18Shuttle Has Been Moved To VAB And And Will Be
Attached To External Tank
19(No Transcript)
20Shuttle is Attached
21(No Transcript)
22(No Transcript)
23(No Transcript)
24Payload Preparation Room (PPR)
25Cargo Package For ISS
26New Module For ISS
27Payload Ready To Be Moved to The Launch Pad
28(No Transcript)
29Payload Carrier Leaves PPR
30(No Transcript)
31Payload Being Moved To Launch Pad
32(No Transcript)
33Lifting Payload Into Position For Insertion
Into Discovery When It Arrives At The Pad
34(No Transcript)
35(No Transcript)
36Shuttle Discovery Leaves VAB
37(No Transcript)
38Shuttle Crawler
TRIP Length--- 3 ½ mi Time--- 6-8 hours
Launch Pad
39(No Transcript)
40Crawler Control
41(No Transcript)
42DISCOVERY ARRIVES AT PAD
43(No Transcript)
44(No Transcript)
45(No Transcript)
46READY FOR LAUNCH
47We Have Lift Off
48(No Transcript)