1
Dome A site testing and future plan
Xuefei Gong Lifan Wang Xiangqun Cui Longlong
Feng Xiangyan Yuan Nanjing Institute of
Astronomical Optics Technology (NIAOT) Chinese
Center for Antarctic Astronomy (CCAA) Texas A M
University Purple Mountain Observatory
2
? Dome A site testing? Kunlun inland Station?
Future plan
3
Dome A the summit of the Antarctic icecap
Cold and dry Low atmospheric backgrounds
Better atmospheric transparency Least seism Low
wind Better seeing conditions

Zhongshan
4093 m altitude 1300km from Zhongshan station
Latitude 8022'00?S Longitude 7721'11?E
4
A Chinese Key International Program for IPY
PANDA- The Prydz Bay, Amery Ice Shelf and Dome A
Observatories

The geographic locations (60o80oE, south
of 53oS)
  • Main research areas
  • Prydz Bay
  • Amery Ice Shelf
  • Zhongshan Station
  • Lambert Basin
  • Zhongshan-Dome A transect
  • Dome A

5
Three arrival by Chinese expedition team First
arrival---- Jan. 10, 2005, 13 person, measured
the highest point Second arrival---- Jan.10,
2008, 17 person (2 Astronomer), Plato and Cstar
install Third arrival---- Jan. 6, 2009, 28
person (1 Astronomer), Plato and Cstar maintenance

6
Astronomical field at Dome AJan. 2008
CSTAR SNODAR PreHeat GATTINI SONIC
7
CSTAR( Chinese Small Telescope ARray4x145mm)
8
Astronomical field at Dome AFeb. 2, 2009
GATTINI and NIGEL
SNODAR ?
SNODAR ?
CSTAR
9
Astronomical field at Dome AJan. 7, 2009

10
Engine Module of PLATO
11
Instrument Module of PLATO
12
SNODAR
13
GATTINI and NIGEL
14
CSTAR
15
Result
?PLATO have run about 7 month at 2008
?Re-start from Jan. 19, 2009
?CSTAR 360G data at 2008, variable objects,
binary
?PreHeat water vapor
?Snodar atmospheric boundary layer
?Gattini, Nigel, Webcam
16
Kunlun Station
Accommodate 12-15 person Winter over station from
2014
17
The inland team 11 Vehicle, 44 sledge, 28
person, 570 ton material 1 Captain, 2
vice-Captain 4 Mechanical Engineer (maintain
vehicle) 1 Communication Engineer 12
Builder 2 Doctor, 1 Chef 3 Scientist 2 Reporter
18
(No Transcript)
19
Kunlun Station
? building finished at Jan. 27,
2009 Inauguration at Feb.2, 2009 ? building
will be constructed at the beginning of 2010
20
Kunlun Station will be strong support for Dome A
science, Astronomy have played key role
Congratulatory letter from President of R.P. China
21
Future plan
FTS/Shabar/Mass15m towerAST3HEAT4m
optical/IR 15m sub-mmSouth LAMOST project
22
AST3(Three Antarctic Schmidt Telescope )
Main specifications
  • Clear aperture50cm
  • FOV4.2
  • Wave Band400nm-900nm (g, r, i filter for 3
    telescopes )
  • Scale1 arcsec/pixel
  • Image quality80energy encircled in one pixel
  • CCD STA1600 ,9micron /pixel, 10k 10k
  • Working mode drift scan

23
AST3
1) Adjustable tower height 2) Foldable
tent-like dome 3) ITO coating plus active snow
removing 4) Auto-focusing
Shorter tube (total optical length about 2.2m),
not increasing light obscuration Equatorial mount
Equatorial mount
24
Preliminary design for 4m antarctic telescope
25
4m optical/IR
26
15m THz
27
CCAA will dedicate to promoting Dome A Astronomy
with wide international collaboration, finally to
establish Antarctic astronomical observatory
with logistic support from Kunlun station
http//ccaa.pmo.ac.cn http//www.niaot.ac.cn