Change Management - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Change Management

Description:

Feature construct model ... Consistency with SC1 strategy confirmed. ISO. TC 184 ... Strategy for using EXPRESS 2. Short term solution using short-2 to long-1 ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 11
Provided by: britti6
Category:

less

Transcript and Presenter's Notes

Title: Change Management


1
Change Management
  • Myrtle Beach, USA, March 2002

2
Review AP203 ed2
  • PDM modules
  • Extension modules
  • Solid model construction history
  • Geometric Design and Tolerancing
  • 3D associative text
  • PDM schema as conformance class
  • Publish initially as TS
  • Possible use for IR on procedural modelling
  • ? relationship with AP214
  • ? impact on other parts

3
Review Set theory
  • Proposed new Integrated Resource for classes and
    set theoretic relationships
  • Required for AP221 and PLCS
  • Provides similar capability to product_category_re
    lationship
  • Needs clear guidance for use
  • Proposed for NWI/CD

4
Review AIC for cables and tubes with a fixed
cross-section
  • Fixed cross-section along a curve
  • circular
  • non-circular with orientation
  • Required for 210, 227 and 214 SEDS
  • Will be reviewed by CAx Implementors Forum
  • Would require additional entity in part 42 - need
    to relate to gear, any changes from IAI
  • Needs harmonisation with 227 piping
  • Draft AIC available by Stockholm
  • Proposed for NWI/CD

5
Review Features AICs
  • Feature construct model
  • Series of AICs for machining feature resources
    for harmonisation across APs
  • Use by AP224 edition 3
  • Use by AP238 after CD ballot
  • Need to consider the requirement for modules
  • Need to ensure modules can be referenced from
    non-modular APs

6
Review Analytic Geometry
  • Implicit solids by coefficients
  • Quadric implicit solids
  • Arithmetic of forms - extension to CSG
  • Reduced file size for large complex models -
    shadows, etc
  • Exact representation
  • Basis of MPEG-4 solids
  • Proposed PWI to be completed June 2003

7
Review AP for Process Planning
  • Interface between CAPP systems
  • Sharing between CAPP and CAM
  • Capture and archive of legacy process planning
  • Covers macro process planning
  • Replaces AP213
  • Feeds into AP238 for STEP-NC
  • Feeds into traditional part programming activity
  • Needs to take into account AP214 UoF
  • Needs to harmonise with Manufacturing Task Force
    proposals
  • Consistency with SC1 strategy confirmed

8
Resolution of comments on TS
  • Technical Specification has only one ballot
  • How do we confirm that comments are addressed?
  • Resolution confirmed with originator, if possible
  • Internal review by team
  • Convenor assessment of significance of change
  • Option for four week confirmatory ballot
  • In case of doubt, ballot

9
Technical issues
  • ISO 3098-1 withdrawn - resolution for TC10
    liaison
  • SEDS issues
  • Process in place - all new SEDS loaded
  • Print function added to database
  • TC issues - Amendments required for
  • Part 41 ed 2
  • Part 42 ed 2
  • Strategy for using EXPRESS 2
  • Short term solution using short-2 to long-1
  • Long term is to upgrade 2x series
  • Urgent need for completion of EXPRESS 2.0

10
Technical Corrigenda
  • Technical Corrigendum (correcting errors, short)
  • SC4 publish on SOLIS
  • ISO publish via webstore, and on paper
  • Minor amendment
  • either
  • handle as TC (above) with FDIS ballot
  • or
  • update document
  • ballot as minor revision with FDIS ballot
  • ISO publish as new edition on CD-ROM and webstore
Write a Comment
User Comments (0)
About PowerShow.com