1
LBT LGSF program goals and Phase A plans
  • consensus on program goals
  • exploit the scientific competitive edge of
    LUCIFER MOS and wide field imaging
  • need reliable, low maintenance system with low
    risks, minimize changes to existing telescope
    systems
  • promptly realize ground-layer system (GLAO) 4
    FOV, factor 2 improvement in FWHM and
  • 3 in concentration, operability
    significantly above median seeing
  • identify upgrade path to on-axis diffraction
    limited performance (SCAO)
  • identify upgrade path to wide-field, modest
    Strehl, diffraction limited operation (MCAO)
  • consensus on technology
  • while Na LGSF has proven to deliver diffraction
    limited operation for SCAO, the currently lowest
    risk/affordable choice for GLAO in terms of
    laser technology is a pulsed Rayleigh system
  • projection system should be independent of laser
    technology, be a single projector for each of the
    pupils, allowing both on-axis and off-axis
    projection schemes
  • wave front sensors (wfs) should not require
    immediate re-design of AGW units this may
    require that the wfs are outside the AGW units,
    upgrade to MCAO may require redesign of
    AGW/tertiary
  • unknowns
  • which is the best upgrade path to diffraction
    limited mode ?
  • benefit of LGSF to interferometry (given fringe
    tracking issues)
  • how fast will a low cost, low maintenance
    Na-laser be available commercially ?
  • impact of LGSF on operations commissioning
  • tradeoff between PSF stability across field and
    FWHM, predictability of PSF

2
deliveries of Phase A
  • performance estimates as a function of seeing,
    Cn2(h), constellation of laser stars etc.
  • study availability and cost of Na-laser system
  • decision on laser system
  • opto-mechanical design
  • (universal) launch concept
  • upgrade paths to SCAO and MCAO and performance
    estimates, including tomography
  • impact on telescope, staffing plan
  • cost and schedule estimates

phase A schedule June 2007 December
2007 conceptual design review January/February
2008 (review panel to include external
members)
3
team responsibilities during phase A