Title: Status of Joint Implementation in Russia
1Status of Joint Implementation in Russia
- Helmut SCHREIBER
- The World BankEurope and Central Asia
RegionInfrastructure and Energy Services
Department
2Russia necessary to reach Kyoto Targets
- Ratifying OECD cumulative target reductions will
be 5-5.5 billion tons of carbon dioxide below
1990 levels - If half is done domestically the compliance gap
to be met through Kyoto Mechanisms is 2.5 billion
tons - The figures (in million tons of reductions) dont
add up - Compliance Gap 2,500
- CDM deals so far 400
- JI deals so far 150
- ? Big volume transactions desperately needed
- Russia could (and should be) the biggest source
of JI and International Emissions Trading (IET)
deals Assigned Amount Units (AAUs) are of the
magnitude of 3 bln. - Time running out as lead times from project idea
through construction to implementation and ERs
are long - If Kyoto fails, post-Kyoto commitments would be
jeopardized
3Headroom of Russia and other JI Countries
4History of JI work in Russia (1)
- September 2004 National Action Plan (NAP)
initiated by government decision - October 2004 Ratification of Kyoto Protocol by
Russia - November 2004 (starting). Participation of 15
Federal Ministries and Agencies. Agreed by almost
all of them. The NAP fixes the distribution of
responsibilities among Russian ministries. The
NAP - takes into account the provisions of the draft
medium-term program of socio-economic development
(till 2008) - Draft NAP was presented at the WB workshop in
January and with EU in March 2005 - February 2005 The Government agrees on the NAP.
- March 2005 Interagency Commission on Kyoto
Protocol is formed. The Ministry of Economic
Development and Trade is leading institution in
this commission
5History of JI work in Russia (2)
- August 2005 Draft of the Regulatory Framework.
- September 2005 March 2006. Different drafts of
Regulatory Framework discussed within the
Interministerial Committee. - March 2006. Government decision on
- National monitoring system of GHG emissions and
sinks and on inventories Roshydromet is in
charge and on - registries Ministry of Natural Resources is in
charge - April 2006 until November 2006 Discussion of
drafts of Regulatory Framework. No agreement
between Ministry of Economic Development and
Trade and Ministry of Foreign Affairs. - December 2006 meeting under the auspices of the
Deputy Prime Minister Medvedev envisaged to solve
existing conflicts. If meeting will be
successful, Regulatory Framework will be
prepared JI could start perhaps in September
2007.
6JI Approval Mechanism without State guarantees
Representative of the insurer
Validator
Registry manager
Risk insurance of default from obligations under
the project according to PDD
Conclusion on verification
Conclusion on validation
Translation of ERUs into the account of the
Applicant (on results of verification)
Project sponsor (Applicant)
JI Committee (for Track 2)
Approval of the project
Certificate on modification in the National
register
The application for final approval 1) PDD with
schedule and design parameters 2) The project
3) Acknowledgement of insurance 4) The
conclusion of the Validator
Notice on acceptance of the positive
decision (Letter of approval)
National register
Conclusion on verification
Correlation
Coordination center Focal Point
Cadastre
Notice on acceptance of the positive decision
MoEDT Ministry of Economic development and Trade
7JI Approval Mechanism with State guarantees
Representative of the insurer
Validator
Conclusion on validation
Partial insurance of risks on PDD
JI in Russia
Project budget planning body
Budgetary credit contract
Project sponsor (Applicant)
Collateral, bank guarantee or other security
against the budgetary credit
The application for final approval 1) PDD with
schedule and design parameters 2) The project
3) Acknowledgement of insurance 4) The
conclusion of the Validator
Notice on acceptance of the positive decision
(Letter of Approval)
Coordination center Focal Point
8JI Projects in Russia Status
- 2004 GGFR identified pilot and demonstration
projects for carbon credit financing under JI and
started preparation of first projects - By November 2006 WB has received
- 30 projects proposals,
- 10 of them deal with associated gas use, mainly
dealing with - Transporting flared gas for gas sales
- Use of flared gas for onsite power generation
- Total estimated reduction volume from these
associated gas projects 50million tons of
reductions for the period 2008-2012. - Also reduction of methane in gas distribution
network (reducing leakages) and - Other projects like land fill gas projects, fuel
switch etc. - 7 projects have been endorsed by the Government
- Special emphasis of Gas Flaring, as these
projects can be implemented generally faster than
other energy projects - One PDD has been prepared should be validated in
January/February.
9Gas flaring in Russia
- Flaring is very common in Russia
- The very low utilization of associated gas is
primarily because of two reasons - No cost There are no substantial environmental
penalties for gas flaring there are penalties,
but they are either not paid (unreporting) and/or
too low - No gain Lack of access to the gas transportation
system reduces the scope for Russian oil
producers to extract value from the associated
gas - Russia accounts officially for 15 bcm
inofficially for as much as 60bcm
10Gas Flaring in Russia Western Siberia (1)
11Gas Flaring in Russia Western Siberia (2)
12(No Transcript)