Task 4 group summary - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Task 4 group summary

Description:

... connector offset of different launch conditions using PIE metrics to quantify ... 1. To optimize beam size for each launch condition. ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 2
Provided by: ysun7
Category:

less

Transcript and Presenter's Notes

Title: Task 4 group summary


1
Task 4 group summary
  • Goal
  • To compare the tolerance to the connector offset
    of different launch conditions using PIE metrics
    to quantify system performance
  • To identify a restricted index profile set( the
    worst case fiber set) for each considered launch
    conditions
  • To specify a TP2 optical launch profile which
    enables the maximum number of solutions (modified
    encircled flux?)
  • Proposed activities
  • Link without connectors
  • 1. To optimize beam size for each
    launch condition.
  • 2. To compare the pulse response and
    PEI metrics.
  • Link with connector
  • 1. Suggest using 7, 7 and 4 um
    proposed by Task 2
  • 2. To address the dynamic
    variation caused by temperature,
  • polarization or mechanical
    perturbation, suggest including the
  • rotation of polarization in
    the simulation
Write a Comment
User Comments (0)
About PowerShow.com