Title: Carlisle Process Systems
1Carlisle Process Systems
The Challenges of Building a Modern Cheese and
Whey Plant The Southwest Cheese ProjectTim
HighPresident, CPS, Inc.
2US Cheese Production Consumption Trends
- From 1970 to 2004
- The number of cheese factories has decreased from
963 to 401 - Average production per cheese plant increased
tenfold from 2.29 million pounds to 22.14 million
pounds - Milk production in the USA is moving from East to
West, with New Mexico and the Texas panhandle
being the most rapidly growing area - Favorable climate
- Land availability
- A labor force providing for large scale, low cost
milk production - New Mexico has an average herd size of almost
2000 cows- twice that of any other state
3US Cheese Production Consumption Trends
- Cheese Producers
- 401 cheese factories in the USA
- SWC will be 402
- Gossner Foods, Magic Valley Swiss Cheese Plant
will be 403
4US Cheese Production Consumption Trends
- US Cheese Production 2004 Percent by Type
5US Cheese Production Consumption Trends
6US Cheese Production Consumption Trends
- Commercial Disappearance USA
US cheese consumption is dependant on its
popularity as a food ingredient rather than
Americas appetite for cheese itself.
7Southwest Cheese Project Joint Venture Partners
- Glanbia
- International cheese, nutritional ingredients and
consumer foods company - Operations in the USA, Ireland and the UK
- Largest dairy processor in Idaho, USA and is a
global player in advanced technology dairy-based
nutritional ingredients - Headquartered in Kilkenny, Ireland
- Group sales in 2004 of 2.5 billion.
- Dairy Farmers of America, Inc.
- Headquartered in Kansas City, Missouri,
- Largest dairy co-operative in the United States
and the largest marketer of fluid milk in the
world - During 2004, DFA marketed 57.2 billion pounds of
milk, constituting 34 of total US milk
production - Operates 27 manufacturing plants that produce a
wide range of dairy products - 2004 sales amounted to 8.4 billion
- Select Milk Producers Inc.
- Formed in 1994 by a group of large dairy
producers in New Mexico - Majority of members are located in the New
Mexico/West Texas region which is the fastest
growing milk producing region in the USA - Supplies a range of Americas leading food
manufacturers with quality fluid milk, both
natural and concentrated, for further processing - 2004 Select sold 3.3 billion pounds of milk with
a value of 550 million.
8Southwest Cheese Project By the Numbers
- Sales 340 million per year
- Employ over 225 staff
- At full capacity
- Process over 2.3 billion pounds/1 billion litres
of milk - Produce in excess of 250 million pounds/110,000
tonnes of cheese - Produce 16.5 million pounds/7,500 tonnes of high
value-added whey proteins each year - Capacity Cheese Plant
- Manufacture 25,000 pounds/11 tonnes of 640
blocks per hour and 19,000 pounds/8.6 tonnes of
40 blocks per hour - Total manufacturing capacity of 44,000 pounds/20
tonnes per hour - Cheese type American style cheeses - cheddar,
Colby, jack and pepper jack - Capacity Whey Plant
- 275,000 pounds/125,000 litres of whey per hour
- Producing the highest quality WPC 80 and WPI in
the industry
9Southwest Cheese Project Implementation
- Selection of General Contractor Equipment
Vendor - Budget Preparation
- Value Engineering
- G-max
- 90 Engineering
- Release for Construction
- First Product
- Substantial Completion
- Final Completion
10Southwest Cheese Project Implementation
Southwest Cheese Board of Directors
Glanbia Foods
Southwest Cheese Project Manager
Dahlgren/Skanska Building Utilities
Infrastructure Effluent AE Bonnelli
CPS Process Packaging Filtration
Engineering Tetra Pak Millerbernd Design
Fabrication Alfa Laval Emerson Rockwell Fristam
11CPS Scope
- 70 million order value
- 250,000 CPS man hours (125 man years)
- Third party equipment 26 million
12Southwest Cheese Project - Equipment
- CPS was awarded the contract in December 2003
- CPS began delivering equipment in May 2004
including - Milk Receiving and Treatment
- Fifteen Scherping Horizontal Cheese Vats (70,000
lb/31,000 L) - Two 12ft. x 116 ft. Scherping Draining/Matting
Machines - Two 12ft. x 60 ft. Scherping Salting Mellowing
- Fourteen Hi-Flo Cheese Towers
- Eighty Walker Silos and CIP tanks
- Zimmer Permeate Evaporator
- Stork WPC/WPI Dryer
- Automation
- Consignment spare parts inventory program
Horizontal Cheese Vat
Cheese Curd Draining Conveyer
Shaking Bed
13Southwest Cheese Project Implementation
- Challenges
- Massive paper trail and revisions
- Web site used to manage thousands of documents
- Stainless steel price increases
- 3 million pounds used
- 50 price increase
- Location
- Shortage of skilled workers
- Weather
- Delayed building/road construction by 3 weeks
14Southwest Cheese Project Implementation
- Highlights
- Within original budget plus contingencies
- Ground break to first product in 20 months
- Pre-engineering and value engineering phases
resulted in few price variations and substantial
cost savings - Over one million hours worked on site with no
serious injury
15Southwest Cheese Project Plant Details
- Total Plant Area
- 280,000 sq ft/ 26,013 m²
- Main Areas
- Cheese Plant
- Whey Plant
- Storage
- Office, Maintenance, Corridor
- The site comprises approximately 54 acres of new
grading and construction
16Southwest Cheese Project Schedule
17Southwest Cheese Project
18Southwest Cheese Project
19Southwest Cheese Project
20Carlisle Process Systems
Carlisle Process Systems