Small hydro success stories - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

Small hydro success stories

Description:

Small hydro success stories. Luigi Papetti. ESHA. Troitorrents SHP. Troitorrents SHP. Set on the drinking water network of Troistorrents (Valais, CH) municipality ... – PowerPoint PPT presentation

Number of Views:111
Avg rating:3.0/5.0
Slides: 30
Provided by: luigip5
Category:
Tags: hydro | luigi | stories | success

less

Transcript and Presenter's Notes

Title: Small hydro success stories


1
Small hydro success stories
Luigi Papetti ESHA
2
Troitorrents SHP
3
Troitorrents SHP
  • Set on the drinking water network of
    Troistorrents (Valais, CH) municipality
  • It works on the high difference of levels between
    the catchment chamber and the surge tank, as a
    pressure regulator device
  • Typical application of energy recovery in high
    mountain remote areas

4
Troitorrents SHP
5
Troitorrents SHP
6
Troitorrents SHP
  • Installed capacity 75 kW
  • Net head 242 m
  • Rated discharge 35 l/s
  • Energy production 230.000 kWh/year

7
Troitorrents SHPCosts
8
The reasons of a success
  • Suitable also for operation in isolated networks
  • Multipurpose use of water
  • No additional infrastructures needed (intake,
    waterways, etc. already existing)

9
GARDONE VAL TROMPIA PLANT
Main characteristics
Plant location
10
BASIC FIGURES
11
Gardone V.T. in XVIII century
12
Plan view of the eight plants
Intake
Bernardelli
Beretta I
Beretta III
Beretta II
Redaelli II
Redaelli I
LEGENDA
Gramineto channel
Acqualonga channel
AcqualongaGramineto channel
Redaelli III
Penstock
Powerhouse
S.F.A.E.
13
Schematic profile of the plant
14
Penstocks
Surge tank
Section A open channel (202,8 m)
Section B,C,D1 GRP penstock (768,4 m)
Section A siphoned channel (321,1 m)
Section D2,E steel concrete penstock (357,1 m)
Section A cast iron penstock (254,5 m)
Section E tail race (358 m)
15
Weir
16
The intake structures
17
Headrace channel open air stretch
18
Siphon intake during construction
19
Cast iron pipe installation
20
Glass reinforced (GRP) penstock installation
21
Steel penstock
Studio Frosio
22
Surge tank during site assembly
23
Powerhouse - Before
24
Powerhouse - After
25
ECONOMICSINVESTMENT
26
ECONOMICSINCOME AND OM
27
ENVIRONMENTAL BENEFITS
EMISSIONS
28
The reasons of a success
  • Partnership between local municipality and
    private investors
  • Strong commitment of the local municipality
  • Good social acceptance thanks to the creation of
    the awareness in the general public of
    environmental importance of the initiative
  • Strict works supervision and control both from
    technical and administrative point of view
  • Creation of private-public company to manage and
    operate the plant, acting independently in the
    energy market

29
THE END