Title: CONCRETE ROADS FOR LOW TRAFFIC VOLUMES
1CONCRETE ROADS FOR LOW TRAFFIC VOLUMES
- Brian Walker
- BCP Engineers
2Advantages Of Concrete Roads
- Ideal for emerging contractors
- Low capital costs on plant
- Can be laid on very steep grades
- Little or no layerworks required
- Low maintenance costs
3Ideal for emerging contractors
4Low Capital Costs on Plant
5Can be laid on very steep grades - - greater than
25
6Little or No Layerworks
7Low maintenance costs
8Some Problems With Concrete Roads
- Incorrect aspect ratios
- Irregular shaped panels
- Settlement of fills
- Late saw cutting of joints
- Plastic shrinkage cracks
9Incorrect aspect ratio of panel- Must be less
than 1.2
10Irregular shaped panels
11Settlement of Fills Late Saw Cutting of Joints
12Plastic shrinkage cracking
13Other Types Of Concrete Roads
- Rollcrete
- Interlocking concrete blocks
14Rollcrete
15Interlocking Concrete Blocks
16Some Concrete Road Projects
17Wiggins Umkhumbane
18Brooks Farm
19Cato Manor
20Westrich
21Cost Comparisons Asphalt/concrete
22Summary
- Lower maintenance costs
- Helping emerging contractors
- Low capital cost of plant
- Ideal for steep grades
- Can reduce the cost of drainage
- Reduced requirement for scarce layerwork material
23How Not To Build A Road
- Inappropriate surfacing
- Combined withno maintenance