Title: The PIs SelfAssessment


1
The PIs Self-Assessment
  • A. Poglitsch

2
Achievements
  • PACS integrated FPU mechanical/thermal/optical
    qualification/performance verified (with some
    understood exceptions)
  • Subunits function/perform as expected after
    integration
  • Remaining open issues are concrete, isolated
    problems that can be solved
  • Almost all S/C interfaces settled, budgets (mass,
    electrical power, thermal power) stable
  • PACS system operability (FPU WE/OBSW OGSE
    EGSE) demonstrated
  • Test calibration plan use of IA/QLA shown
    viable

3
The Schedule and Its Consequences
  • Several subunits on critical path (detectors,
    DECMEC, DPU?)
  • Some modifications of FM subunits and OGSE
    mandatory
  • No margin
  • 6 month of FM ILT minimum
  • Delivery on official need date (Nov 2005)
    impossible
  • Project will have to find ways to accommodate FM
    delivery in March 2006 no recovery in sight

4
PACS Areas of Concern
  • Warm Electronics OBSW
  • Late qualification / late delivery of QM/FM units
  • System stability / frequent crashes (H/W? S/W?)
  • Potentially insufficient autonomy functions
  • If system stabilty does not improve dramatically
    then better recovery scheme needed
  • Improper commanding can damage FPU H/W
  • DPU Burst mode not working with CDMU
  • SPU Memory corruption insufficient compression
    with reasonable CPU load
  • BOLC No immunity to uncontrolled power loss
  • DECMEC FPGA overheating, link losses
    performance and operability still need to be
    demonstrated. Grounding scheme still open

5
PACS Areas of Concern
  • Photoconductor/readout performance
  • Required sensitivity not demonstrated yet
  • FS CREs to be used with FM detectors show
    promising performance, but measurements with
    detectors still missing
  • Bolometer performance
  • QM bolometer performance insufficient
  • FM bolometer performance at subarray level
    probably ok
  • Performance at PhFPU level to be demonstrated,
    yet
  • OGSE performance
  • Reproducibility of alignment
  • Scale/focus error

6
PACS Areas of Concern
  • Late availability of ILT analysis in some areas
  • There may be yet unidentified problems that could
    surface too late to be addressed in the final H/W
    implementation
  • Lack of resources in some partner institutes to
    address known problems in time
  • L0 interface as provided by industry for EQM
    tests and as foreseen for FM is incompatible with
    PACS requirements
  • H field susceptibility photometer performance
    could be seriously compromised

7
Future Strategy
  • Optimise/prioritise implementation of changes to
    H/W
  • Improve reviewing/monitoring of subunit progress
    by PACS System Engineering
  • H/W S/W
  • Subunits must be delivered fully tested
  • Optimise FM ILT planning
  • Early execution and timely analysis of tests
    needed for performance verification
  • Keep planning flexible to accomodate any
    adjustment in S/C schedule
  • Work towards open exchange on schedule between
    all involved parties
  • Extension of ILTs should always be
    possible/welcome