1National Federation of Group Water Schemes
- 5th Annual Rural Water Services Conference
- 13th September 2006
2Rural Water DBO ProgrammeThe National Picture
- Jean Gibson
- OM Validation Officer
National Federation of Group Water Schemes
3- Since the formulation of the Rural Water
Programme, the principal focus has been on
quality deficient drinking water supplies and how
to bring these up to the required standard. This
remains our priority objective.
4Agreed NRWMC Strategy
- DBO Bundling
- Connection to a public supply
- Taking over by a local authority
- Minor upgrade
- Issue that has arisen since NRWMC Action Plan
was formulated - Unaccounted for water (UFW)-Leakage
5Challenges
- Some 450 schemes requiring upgrade
- Huge variation
- size of schemes
- level of organisation
- financing
6Criteria for a DBO project
- Schemes requiring water treatment
- Identified through monitoring programme
- Connection to public main not an option
- Critical mass sufficient to attract contractors
at competitive prices - Leitrim
- Donegal
7DBO/bundling programme to date
- 14 projects (excluding 4 individual projects in
Cavan (Annagh), Roscommon (Pollacat Springs
Cavetown Lake) Galway (Glinsk/Creggs) - Cavan (3 projects)
- Monaghan (1 project)
- Roscommon (1 project)
- Sligo (2 projects)
- Mayo (2 projects)
- Galway (2 projects)
- Clare (1 project)
- Limerick (1 project)
- South Leinster (1 project)
8DBO Projects (17 in total)
9DBO Bundle updates
- Monaghan
- Completed (10 GWS 3 PWS)
- East Cavan
- 9 out of 10 schemes completed, remaining scheme
due to be commissioned shortly. - West Cavan
- All 8 schemes completed. (7 GWS 1 PWS)
- South West Cavan
- All 4 schemes completed.
10DBO Bundle updates (contd)
- Mayo No.1
- Brackloon/Spaddagh- Commissioning
- Glencorrib Cross Kilmovee/Urlaur - Civil Works
- All other schemes at ME stage
- Bundle due to be completed December 2006
- Limerick
- 4 schemes at commissioning (Bulgaden, Croagh,
Glenstal, Kileedy) - Bundle due to be completed December 2006
11Brackloon/Spaddagh GWS
12DBO Bundle updates (contd)
- Sligo North West DBO Bundle
- All 6 schemes completed in the Operation
Maintenance phase. - Sligo South East DBO Bundle
- All 5 schemes completed in the Operation
Maintenance - Galway No. 1
- Works have been completed on 7 scheme and they
are due to be commissioned shortly. - Bundle due to be completed by December 2006.
13DBO Bundle updates (contd)
- South Leinster
- Contract started June 2006. Programmed completion
date - February 2008. - Clare
- Lissycasey Toonagh-Dysart are completed
- Remaining schemes due to be completed by end of
September 2006.
14South Lenister Bundle
15Castlewarren GWS
16Corrick official opening 20th July 2006
17Sligo Official Openings
18Benbulben official opening 20th July 2006
19Benbulben GWS, North Sligo
20CASTLEBALWIN INTAKE ON LOUGH ARROW
21KEELOGOBOY
22DBO Bundle updates
- 3 remaining bundles to go to tender
- Mayo No. 2
- Galway No. 2
- Roscommon
23Delay Factors
- Finalising the Composition of the Bundle
- Determining Source Reliability
- Rationalising the Number of Sources
- Determining Land Ownership/legal issues
- Site Issues
- Provision of Power Supply by ESB
242006 will see quality drinking water available to
approx. 25,000 consumers through DBO.
25Slán Louis
- Success to date is largely due to the work of DBO
Steering Committees under the direction of Louis
Kilmartin as National DBO Project Manager. - We wish Louis every success in his retirement!!!
26Operation Maintenance Phase
27Costs Service Phase 1
- Determining Factors
- Size of Bundle
- Size of Schemes
- Level of Treatment
- Payments to DBO Contractor
- Fixed Annual Charge
- Volumetric Charge
- Capital Replacement Fund
28Fixed Volumetric Costs - Bundles
29Liaison Monitoring Committee (LMC)
30Liaison Monitoring Committee
- Committees have been formed for the following
bundles - Monaghan
- East Cavan
- West Cavan
- South West Cavan
- Sligo bundles - Currently being set up
31Performance Management System (PMS)
32 What is the PMS?
PMS PERFORMANCE MANAGEMENT SYSTEM
This system is designed to assist group water
schemes with the management of the DBO Contractor
33PMS Training Course
34PMS Training remaining
- Scheduled dates for remaining schemes
- Limerick Bundle (9 GWS) October
- Mayo Bundle No. 1 (7 GWS) November
- Galway Bundle No. 1 October
35Limerick DBO Bundle
36Mayo DBO Bundle 1
37Leakage Control
- Unaccounted for Water (UFW)
38Unaccounted For Water (UFW)
- Some GWS have UFW in excess of 75
- Major concern for schemes in DBO Bundles
- All DBO Treatment Plants designed to meet
- Actual current theoretical demand
- Estimated growth demand for 20 years
- DEHLG has placed an upper limit of 25 UFW for
DBO plant design.
39UFW Concerns
- Remember what youre paying for.
- Remember what youre not getting paid for.
- You cannot ignore the limits of your plant.
40Leakage Control Survey
- Ryan Hanley Consulting Engineers
- Galway Bundle No. 1
- Rinn/Killeeneen
- Lowville
- Inis Meain
- Lettergesh
- Cloonatleva
- Ballyglass/Fiddane
- Results
41Rinn Killeeneen
Ryan Hanley
42Lettergesh
Ryan Hanley
43Cloonatleva
Ryan Hanley
44Ballyglass/Fiddane
Ryan Hanley
45Leakage Control Survey
Ryan Hanley
46Mayo DBO Bundle No. 1
Ryan Hanley
47Monaghan GWS Figures
48County Federation Sub Group
- Established in Monaghan Cavan to discuss water
pricing structures policies in use by the
various group schemes in each county. - Beneficial for schemes just metered to decide on
charges. - NFGWS staff available to assist schemes in
setting charges, through a financial model.
49National Federation of Group Water Schemes
- 5th Annual Rural Water Services Conference
- 13th September 2006