WG 3 Presentation to SC 4 Opening Plenary - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

WG 3 Presentation to SC 4 Opening Plenary

Description:

Draft ISO 10303 part 'Recommendation for a Product Model of Gear Units' Has AP-like structure ... Part 52 is complete, awaits AP 209 e2 for NWI/DIS ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 16
Provided by: gerald91
Category:

less

Transcript and Presenter's Notes

Title: WG 3 Presentation to SC 4 Opening Plenary


1
WG 3 Presentationto SC 4 Opening Plenary
  • Gerry Radack, Convener
  • Sun City, South Africa
  • 2008-06-08
  • 0800 1000
  • ISO TC 184/SC 4/WG 3 N2451

2
Plenaries
  • Monday 1030-1200
  • Thursday 1300-1500

3
Hot Topic
  • Draft ISO 10303 part Recommendation for a
    Product Model of Gear Units
  • Has AP-like structure
  • Contains Information requirements with EXPRESS
    model that translates to AP 214 ARM
  • Contains simple mapping, not in accordance with
    mapping guidelines
  • To be discussed at WG 3 Monday plenary
  • Relationship to STEP Architecture
  • Relationship to existing manufacturing APs
  • Should this be a part of ISO 10303?
  • Way forward

4
WG3 Teams
  • T01 Shape Representation
  • Goult, Ray J LEADER
  • T04 Materials
  • Moreno, Anna LEADER
  • Swindells, Norman DEPUTY
  • T08 Product Life Cycle
  • King, Timothy LEADER
  • URen, Jim DEPUTY
  • T09 Engineering Analysis
  • Hunten, Keith LEADER
  • T10 Electrical/Electronics
  • Klein, Lothar LEADER
  • T19 Mechanical Products
  • Ungerer, Max LEADER
  • T22 Building and Construction
  • Terai, Tatsuo LEADER
  • Kim, Inhan DEPUTY
  • T23 Ships
  • Mays, James L LEADER
  • Sandsmark, Nils DEPUTY
  • T24 Manufacturing
  • Hardwick, Martin LEADER
  • Sakamoto, Chiaki DEPUTY
  • T25 Oil, Gas, Process and Power
  • Sandsmark, Nils LEADER
  • van Exel, Paul DEPUTY

5
T01 Shape Representation
  • Accomplishments since Louisville
  • resolution of DIS ballot comments on 10303-59
    completed
  • Draft IS ISO 10303-59 now under internal review
    by team

6
T01 Shape Representation
  • Plans for Sun City
  • No meetings planned

7
T09 Engineering Analysis
  • Accomplishments since Louisville
  • Continued AP209 e2 modularization
  • EA modules detailed documentation 95 complete
  • Updated supporting Engineering Analysis IRs
  • Part 52 is complete, awaits AP 209 e2 for NWI/DIS
  • Part 53 nearly complete, requires a minor update

8
T09 Engineering Analysis
  • Plans for Sun City
  • Publication of remaining EA IRs (52, 53, 110)
  • Walkthrough of AP 209 e2 analysis modules as
    completed to date

9
T09 Engineering Analysis
  • Schedule for Sun City
  • Thursday
  • Publication of EA IRs (primarily 110)
  • Walkthrough of AP 209 e2 analysis modules as
    completed to date

10
T24 Manufacturing
  • Accomplishments since Louisville
  • Team Meeting in Sweden March 10-12
  • Preparing TC1 for AP-238
  • Feed speed optimization
  • High speed machining
  • Probing tools

11
T24 Manufacturing
  • Plans for Sun City
  • Not meeting in Sun City
  • Next team meeting is in Hartford, Connecticut
    October 1-2
  • Hope to be at the Busan meeting as well

12
T25 Oil, Gas, Process and Power
  • Accomplishments since Louisville
  • ISO 15926-3 TS is under publication as TS using
    the electronic insert option for free of charge
    publication of reference data
  • ISO 15926-7 has had a 2nd CD/TS ballot
  • A paper for RDF-Gellish as implementation of
    ISO15926 has been prepared for discussion in T25

13
T25 Oil, Gas, Process and Power
  • Plans for Sun City (1)
  • Review status of ISO 15926-3 publication
  • Review ballot results of ISO 15926-7 CD/TS ballot
  • Review status of the ISO 15926-6 draft CD/TS
  • Discuss ISO 15926-4 amendment 1
  • rotating equipment
  • URL/URI for ISO 15926 reference data
  • Discuss further extensions to ISO15926-4 TS for
    other disciplines

14
T25 Oil, Gas, Process and Power
  • Plans for Sun CIty (2)
  • Plan for the second edition of ISO 15926-1 and 2
  • Discuss the RDF-Gellish draft document
  • Progress NWI for Process Monitoring Data
  • Progress usage of ISO10303-221 and ISO 15926-4 in
    ISO10303-241 jointly with BC group

15
T25 Oil, Gas, Process and Power
  • Agenda for Sun City
  • Monday 1300-1700
  • T25 - Oil, Gas, Process and Power Plenary
  • Tuesday 0800-1200
  • Results 2nd ballot ISO 15926-7 CD/TS proposal
  • Tuesday 1300 1500
  • ISO 15926-4 1st amendment for a) url / uri for
    ISO15926 reference data and b) rotating equipment
  • Discuss the RDF - Gellish standard proposal
  • Plan Ed. 2 of ISO 15926-1 and 2
  • NWI for Process Monitoring Data
  • Tuesday 1530 1700
  • Joint meeting with the BC group
Write a Comment
User Comments (0)
About PowerShow.com