Title: Pantex and CostWorks


1
Pantex and CostWorks
  • June 2009
  • Presented by
  • Steve Patterson Pantex Plant,
  • CAIS/FIMS Administrator, CAS Manager

2
Costworks - How We Use It
  • CostWorks is used to develop construction cost
    estimates that include both deferred and
    non-deferred components that fall within the
    scope of the project.
  • Accurate Condition Assessment Survey (CAS) data
    enhances ability to plan executable deferred
    maintenance (DM) projects.
  • Currently use CostWorks to build customized
    sustainment models (still in the implementation
    stage).

3
Costworks Projects
4
Develop Scope of Work
This scope of work is 1 of 5 provided by the
customer (Utilities System Mgr.)
5
In this case, our customer provided us with a
drawing. CostWorks estimator (CAS Group) then
identifies specific areas of interest within the
project.
6
Step 1 - Select New Step 2 - Type in Project
Name Step 3 - Select Open Step 4 Select
Estimator tab
You choose the location to store your project
estimates
7
Select CostList Import
8
Nothing shows on this list until you add an
Assembly item. You can also add to your CostList
from the Unit Cost tab as well
9
Assembly and Unit costs can be used for
estimating your projects. The note field is an
excellent area to provide task specific info.
10
This is populated for each line item to
reflect CAIS cost adder factor
11
(No Transcript)
12
RTBF Facility Ops Infrastructure
13
This factor created within the Report
Editor under Markups
14
(No Transcript)
15
  • End result provides Program Manager with a
    complete/reliable budgetary estimate
  • project scope data sheet
  • associated project data

16
RTBF Facility Ops Infrastructure
17
RTBF Facility Ops Infrastructure
18
(No Transcript)
19
  • Examples of FY08 Project Estimates
  • fencing work
  • culvert work
  • roofing repairs
  • parking lot repairs
  • septic system replacement
  • gas main line replacement
  • domestic water line replacement

20
Costworks Sustainment Models
21
(No Transcript)
22
Subtracted piping added on Item 64 from Model
Item 63
Model vs Assembly
Data from CAIS
23
Queried CAIS datasheet
CAIS IU is hid in this view
CAIS RS Means
Sustainment Model RS Means
24
Current site factor used we are still
evaluating this (the CostWorks default is 1.0)
This number will be part of our Required
Maintenance algorithm
25
Questions!
Write a Comment
User Comments (0)
About PowerShow.com