Title: PACS ICC in Operations


1
PACS ICC in Operations SVR-3 MPE, 8/9 Nov
2007 O.H. Bauer
2
Herschel Ground Segment Overview
3
Main Control Room _at_MOC
4
IEGSE_at_FN, ESTEC, Kourou -- ICC_at_MOC
5
PI Support Area (PISA) _at_MOC
6
ICC_at_MPE Logical Overview
7
Logical overview (continued)
  • Due to bandwidth limitation (2 Mbits/sec) the
    PACS level 0 products will be regenerated at MPE,
    KUL and NHSC. Hence the Versant database systems
    need to be propagated to MPE, KUL and NHSC.
  • The database systems and PAL pools in the
    internal reference area will contain all data
    necessary for the PACS ICC to support operations.
    Of this data not all data might be copied to the
    public area due to security/protection issues.

8
The PACS ICC at work
9
Hardware setup
  • Pipeline processing, trend analysis, data
    distribution
  • Two 64-bit servers, multiple CPU/cores
  • RAID 5 disk array
  • backup to campus tape library
  • Processing power for local ICC users
  • Two 64-bit servers, multiple CPU/cores
  • fast access to disk array
  • local 4Gbyte 64-bit desktops
  • Dedicated PC for OBSM ?
  • Dedicated PC for ExpertHSPOT MPS

10
Software setup
  • OS Linux
  • parallel processing cluster as an option for the
    number crunchers
  • load balancing cluster as an option for the user
    server
  • HCSS/PCSS
  • careful release schedule to match HSC updates
  • OBSM
  • ExpertHSPOT MPS for engineering and calibration
    observations

11
Procedures
  • Uplink calibration
  • Testing new CALU tables and scripts using CUS at
    the ICC
  • Formal delivery via files (CCB)
  • Downlink calibration
  • Testing new calibration products using both IA
    and pipeline at the ICC
  • Formal delivery via files (CCB)

12
ICC_at_MOC and ICC_at_MPE Staffing during CP and PV
  • ICC_at_MOC and if required also ICC_at_MPE staff will
    work on a seven day per week schedule, taking
    shifts if required
  • Minimum ICC_at_MOC personnel
  • 1 Test manager (SE or CS, supervising ongoing
    test activities and taking decisions)
  • 1 Instrument expert (instrument and test progress
    monitoring, interface to SPACON)
  • 1 Uplink expert (modification of procedures,
    execution of schedule)
  • 1 OBSW specialist in case of OBSW activities
  • 1 Instrument expert (near real time data analysis
    using Packet Recorder Files)
  • ICC_at_MPE
  • Scientists for follow-up calibration analysis
  • Uplink expert(s) for possible calibration
    observation/AOT modifications
  • Software developers for possible S/W
    modifications
  • H/W, S/W, Data Base maintenace experts

13
(No Transcript)
14
MoU 9.5 6 5 4.4 1 3
2 2 f.t.e