Description:

Measure tip deflection of loaded spar-only and complete wing. Needed for Test. Half-Wing ... Horizontal Spar. DS-AS-TS-124. Shim. DS-AS-TS-123. Horizontal Skin ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 28
Provided by: itll7
Category:
Tags: dsuave | spar

less

Transcript and Presenter's Notes

Title: DSUAVE


1
D-SUAVE
  • Deployable Small UAV Explorer

University of Colorado at Boulder
D S U A V E
Interim Review 1 Spring 2007
2
Meet the Team
Burhan Muzaffar..Project
Manager Miranda MeslohAssistant Project
Manager Nathan Sheiko...Systems
Engineer David Goluskin.Fabrication
Engineer Jastesh Sud..CFO Yoshi
Hasegawa........Safety Engineer Brandon
Bobian.Electronics/Webmaster Michael
Lapp..Vehicle Design Lead
3
Overview
  • Changes in Design RFA
  • Design Summary
  • Test Plan
  • Current Issues
  • Schedule Progress
  • Budget Progress

4
RFAWing Deployment Spring Length
5
RFAWing Deployment Spring Length
Deflection
6
RFAWing Deployment Spring Length
Force applied to Piece 3 when Piece 2 hits Piece3
7
RFAWing Deployment Spring Length
  • Shear stress analysis

Shear stress (MPa)
Epoxy (Shear stress is13.8MPa) - connects
backbone and pieces. Assume that epoxy can
connects backbone and pieces perfectly.
8
Design Changes
  • Wing deployment mechanism
  • Spring in compression when maximally extended
  • Triggered by onboard servo
  • Vehicle deployment mechanism
  • Triggered by onboard servo
  • Two vehicle connection points
  • Protective tube eliminated

9
Design Changes
  • Vehicle and wing deployment

10
ElectronicsChanges Since CDR
  • FM instead of PCM RC receiver
  • Futaba R168DF 8-Channel FM DC 75MHz
  • Release servo
  • One servo to release vehicle and deploy wings
  • Changes to Onboard Software
  • Deploy vehicle with an RC command

11
Subsystem TestsW-01 Wing Structural Test
  • Requirements
  • Wingtip deflection less than 5 wingspan under
    worst case (2.5g)
  • Verification Tests
  • Measure tip deflection of loaded spar-only and
    complete wing
  • Needed for Test
  • Half-Wing
  • Measurement Grid and Camera
  • Clamp Capable of 25N Force
  • 50-gram Masses (10)

12
Subsystem TestsWD-01 Wing Deployment Timing and
Locking
  • Requirements
  • Wing deployment time lt0.4s
  • Correct operation of locking mechanism
  • Verification Test
  • Wing deployment under flight conditions (12m/s)
  • Wing remains fully locked after deployment
  • Video recording of test to verify timing
  • Needed for Test
  • Complete swing mechanism mounted on backbone
  • Truck with an open bed
  • Video camera
  • Test location (N. 55th St.)

13
Subsystem TestsWD-02 Release Servo Timing
  • Requirements
  • Time between vehicle release and wing deployment
    lt0.3s
  • Verification Test
  • Initiate release sequence to time the servo
  • Video recording of test to verify timing
  • Needed for Test
  • Complete release mechanism and the swing
    mechanism mounted on backbone
  • Video camera

14
Subsystem TestsE-01 Electronics Range Test
  • Requirements
  • Communications range must be gt1km
  • Correct control surface and throttle operation
    at max range
  • Ground station reception of velocity at max
    range
  • Verification Test
  • Determine maximum range at which communication
    work correctly
  • Needed for Test
  • Complete electronics package
  • Ground station
  • Test location with range gt1km (N. 55th St.)

15
Subsystem TestsP-01 Propulsion Thrust and
EfficiencyP-02 Battery Capacity
P-01
P-02
  • Requirements
  • Battery capacity gt1280mAh
  • Run time gt27.5min
  • Verification Test
  • Determine the actual battery capacity
  • Determine the run time at cruise power
  • Needed for Test
  • Complete propulsion subsystem
  • RC wattmeter
  • Wood dowel to mount motor

16
Subsystem Tests RM-01 Release Mechanism Test
  • Requirements
  • Uninhibited vehicle release
  • Aircraft maintains correct orientation
  • Verification Test
  • Drop the aircraft from the release mechanism to
    verify correct operation
  • Needed for Test
  • Complete release mechanism and swing mechanism
    mounted to the backbone
  • Release test apparatus
  • String
  • Video camera
  • Test location (N. 55th St.)

17
Subsystem Tests DP-01 Deployment Apparatus Test
  • Requirements
  • Pole must be structurally sound at release speed
    (12m/s)
  • Pole must not vibrate
  • Verification Test
  • Video record the pole at 12m/s to verify
    structural integrity
  • Needed for Test
  • Complete deployment pole
  • Truck with an open bed
  • Video camera
  • Test location (N. 55th St.)

18
System TestsDS-01 Complete System Mass
  • Requirements
  • Complete aircraft and release mechanism mass
    lt750g
  • Complete aircraft mass lt650g
  • Verification Test
  • Weigh complete aircraft and release mechanism
    separately
  • Needed for Test
  • Complete aircraft and release mechanism
  • Digital Scale

19
System TestsDS-02 Preliminary Flight Test
  • Requirements
  • Stable Controllable
  • Verification Test
  • Hand-launched powered flight to verify flying
    qualities
  • Record test with video camera for later analysis
  • Needed for Test
  • Complete aircraft
  • Incidence Meter and Protractor
  • RC test pilot (James Mack)
  • Video camera
  • Boulder RC Airfield

20
System TestsDS-03 Velocity and Turn Radius
VerificationDS-04 Endurance Verification
DS-03
DS-04
  • Requirements
  • Aircraft capable of flight for 25min at 12m/s
  • Verification Test
  • Flight test
  • Ground station display of velocity
  • Time endurance
  • Needed for Test
  • Complete aircraft
  • Ground Station
  • Stop watch
  • RC test pilot (James Mack)
  • Boulder RC Airfield
  • Requirements
  • Aircraft capable of 12m/s
  • Turn radius lt50m
  • Verification Test
  • Short flight test
  • Ground station display of velocity
  • Markers on ground to verify turn radius
  • Needed for Test
  • Complete aircraft
  • Ground Station
  • RC test pilot (James Mack)
  • Boulder RC Airfield

21
System TestsDS-05 Preliminary Deployment
TestDS-06 Final Deployment Test
DS-05
DS-06
  • Requirements
  • Uninhibited vehicle release
  • Wing Deployment
  • Initiate transition to stable flight
  • Verification Test
  • Vehicle deployment test with safety tether
  • Identify any problems with deployment
  • Needed for Test
  • Complete aircraft and deployment pole
  • Truck with an open bed
  • RC test pilot (James Mack)
  • Test location (N. 55th St.)
  • Requirements
  • Uninhibited vehicle release
  • Wing Deployment
  • Transition to stable flight
  • Verification Test
  • Vehicle deployment test without safety tether
  • Verify transition to stable flight
  • Needed for Test
  • Complete aircraft and deployment pole
  • Truck with an open bed
  • RC test pilot (James Mack)
  • Test location (N. 55th St.)

22
Vehicle Deployment Testing
  • Pole Structural Integrity
  • Verify the structural integrity of the pole prior
    to mounting the plane on top
  • Verify the pole does not tip over
  • Test should take approximately 2 hours

23
Current Issues to Be Resolved
24
Schedule ProgressMajor Tasks
25
Schedule ProgressMajor Tasks
26
Schedule ProgressParts Progress
27
Project Management PlanCost Budget