1
AREVA
2
Nuclear Power DevelopmentAREVA Perspective
Luc Oursel
Member of the Executive Board President and CEO
AREVA NP
  • ATOMEXPO 2009
  • Moscow Russia May 26th 2009

2
3
AREVAs 2030 scenarios foresee gt500 GWe of
nuclear constructed or extended
AREVAs Experience 102 NPPs installed under
construction worldwide
GWe (net installed)
  • New
  • constructions

635
344
  • Lifetime
  • extensions
  • End of theoretical
  • lifetime

372
267

186
2006
2030
3
4
AREVA is present on the key markets Main
nuclear programs announced worldwide
  • UK
  • Target 10 GWe by 2020
  • EPRTM selected by EDF and pre-selected by E.ON
    for their UK projects
  • France
  • Flamanville 3 (EPRTM) under construction
  • Penly 2nd EPRTM by 2017
  • Finland
  • Olkiluoto 3 (EPRTM) under construction
  • 1 new reactor to be built Call for tender in
    progress
  • Sweden
  • End of 30 years atomic ban
  • Canada
  • Call for tender in progress
  • China
  • 2 EPRTM in construction
  • Target 70 GWe by 2020
  • US
  • 32 COL applications in progress
  • EPRTM selectedby 5 utilities
  • India
  • Target 50 GWe by 2050
  • MoU with NPCIL for up to 6 EPRTM
  • Italy
  • Target 8 to 10 new large reactors by 2030
  • EDF-Enel JV to build EPRTM
  • Emirates
  • EPR in RFQ as a consortium
  • South Africa
  • Target 20 GWe by 2025

Countries where EPRTM are under construction
() Nuclear generation capacity announced by
countries () Construction and Operating
License
Countries where nuclear programs are announced
with opportunities for AREVA
4
5
EPR Reactor the FIRST Generation III under
construction Nth of a Kind
Under Construction
Project Preparation
Under Construction
Calvert Cliffs 3, U.S.
Taishan 12, China
Predictability based on experience
5
6
Partnerships are at the core of AREVAs strategy
  • Strategic agreementin Kazakhstan(Mining and
    fuel)
  • NigerImourarenoperating permit
  • Fuel supply contract

Partneringin the fuel cycle
  • Equity interestin enrichment - GBII
  • JV to develop mid-sized PWR reactor
  • JV in fuel
  • Heavy component manufacturing site in the United
    States

Strengtheningof industrialcapacities
  • Supply of large forgings
  • JV in engineering
  • Creusot furnace capacity
  • Development of the Kerena boiling water reactor
  • Choice of the EPRTM for the UK
  • Maintenance and services

Reactordevelopment
Global partnership
  • JV Ultra high voltage in China (transformer
    factories)
  • JV Electrical equipment manufacturing in Russia

TD
  • JV in systems in India

Renewable energies
  • Development of the biomass market in the United
    States

6
AREVA
7
Making Fuel Secure for our customersFor the
existing and new build fleets
  • Mining large investments and MA assessment
  • Conversion France Comhurex II (610M)
  • Enrichment
  • France Georges Besse II ( 3.0Bn)
  • Capacity of 7.5M SWU potentially up to 11.0M SWU
  • Modularity enabling production to start in 2009
  • United States Eagle Rock (over 2Bn)
  • Capacity of 3.3M SWU
  • US Customers have signed letters reserving
    capacity
  • March 09 NRC informed AREVA that it had
    completed the preliminary examination of the
    license application
  • Recycling Accompanying the renaissance
  • World market share and technological leader,
    answering Customer concerns
  • Growing interest in the USA and China

7
8
Investing in an integrated manufacturing approach
  • Continuous quality deliveries of products and
    integrated processimprovements for existing
    plants and new build projects
  • Sfarsteel (Le Creusot)
  • Heavy forging and machining
  • Workshops 85 000 m² (4 sites)

Joined AREVAin 2006
  • Chalon Saint Marcel
  • Workshop 39 000 m²
  • Reactor Pressure Vessel,Steam Generators,
    Pressurizers,Safety Injection Accumulators

2 900m² extensionin 2006
  • AREVA Newport News LLC (USA)
  • Start of construction 2009
  • Workshop 28 000 m²
  • Reactor Pressure Vessel,Steam Generators,
    Pressurizers,Safety Injection Accumulators

28 000m² More than 500 skilled jobs
1 200m² Extension by 2012, 2 new
productionlines by 2011
  • JSPM (Jeumont)
  • Workshop 13 000 m²
  • Reactor Coolant Pumps, Control Rod Drive
    Mechanisms

AREVA is building an industry, not just plants
9
AREVA plans to hire 12,000 new employees in 2009
to sustain growth
Workforce by Sector (2008)
AREVA workforce
1
75,400
Front End
65,600
T D
61,100
58,800
57,900
19
40
26
15
Reactor Services
Back End
2004
2005
2006
2007
2008
Total 75,400
9
10
AREVAs leading competencies for installed base
business in Reactors Services
  • 1. Technology
  • Teleperm XS (Safety IC)
  • Hydrogen Removal Systems
  • HVAC Systems
  • WIS (Inspection Diagnostic equipment)
  • 2. Services
  • Safety IC engineering
  • Modernization Lifetime Extension
  • Power Uprate
  • Core Optimization services
  • Component Repair Replacement services
  • Outage Optimization services
  • Maintenance and Non-Destructive Examinations
  • 3. Results example achieved on German
    Installed Base (for 6 NPPs)
  • Our power uprate and outage services have
    resulted in an additional electricity generation
    of 126 TWh since 1990 with a value of 5,7 Bn at
    todays wholesale price. This amounts to 7TWh per
    year, equivalent to more than 0,5 EPR.

10
11
Cooperation activities of AREVA in Russia
  • Fuel Cycle and G8 Global Partnership
  • Gremikha Remediation of former naval
    maintenance base submarine spent fuel management
  • Zvezdotchka shipyard Incineration unit for
    solid low level waste replacement of the
    incenerator
  • Reactor Services
  • Safety IC for Kola
  • Inspection Diagnostic equipment
  • Consulting and Engineering services
  • Fuel
  • Manufacturing and deliveries of Enriched
    Reprocessed Uranium (ERU) Fuel Assemblies or ERU
    Fuel Pellets in cooperation with OAO MSZ
    Elektrostal (Russia)
  • W-ECP
  • Production Association Electrochemical Plant
    (ECP), TENEX, AREVA NC and SGN team together for
    the design, delivery, construction, test and
    assistance to commissioning of a Defluorination
    Facility called W ECP.

11
12
  • Lets share the Ambition
  • to create
  • the New Generation
  • for Nuclear Generation

12
13
AREVA
14
BACKUP
15
AREVA provides solutions for CO2 free electricity
generation, transmission and distribution
Nuclear
Transmission Distribution
15
AREVA
16
OL3 Nuclear Island