Title: Creation of Heat and Power Replacing Source


1
Creation of Heat and Power Replacing
Source Director General for STC MCC Konstantin
Dorofeyev
2
2
3
3
4
  • The unique underground industrial dual- purpose
    ADE-2 reactor has been operating at the Mining
    and Chemical Combine (MCC) since 1964. The
    reactor is known to be a reliable source of heat.
  • According to the Agreement signed by the
    Government of Russian Federation and the
    Government of the United States of America the
    reactor must be decommissioned after replacement
    source starting. December of 2006 is determined
    as the reactor shutdown date.
  • Zheleznogorsk total thermal load, which is
    covered by MCC sources, is 820 Gcal/h. In 2006
    the heating demand is planned to be 1090 Gcal/h.
  • The dismissal of about 2500 people is going to
    result from the reactor shutdown and
    radiochemical production decommissioning.

4
5
  • Replacement Sources Options
  • ADE-2 reactor Core Conversion mode with no
    fabrication of weapon-grade plutonium.
  • Existent heat stations reconstruction.
  • Underground nuclear power plant with two VK 300
    type reactors construction.
  • Fossil fuel power plant construction.

5
6
  • There is a need to construct a new general power
    source to meet growing heat demands of the
    production plants and the city after reactor
    shutdown and reduction of heat, generated with
    costly mazut.
  • Investment plan studied four options as
    replacement sources, they were
  • Sosnovoborsk Power Plant,
  • New Underground Nuclear Power Plant,
  • Power Plant of MCC,
  • Boiler Workshops of MCC.
  • After strong discussions and considerations
    Mining and Chemical Combine arrived to the
    decision to place Zheleznogorsk Power Plant on a
    site with the unfinished TETs construction near
    Sosnovoborsk.
  • Against the contract with PPNL, draft design for
    a new Power Plant (TETs) was completed using the
    existing Sosnovoborsk site with the unfinished
    construction.

6
7
  • Situating Scheme of Heat Sources Location

?
The total heat pressure of Zheleznogorsk from MCC
sources 2000 - 820 Gcal/h 2006 - 1090 Gcal/h
7
8
ZTETS Construction Terms
8
9
Technical and economic indices
9
10
10
11
The Pipeline from Sosnovoborsk TETS to
Zheleznogorsk
11
12
  • Mining Chemical Combine (MCC) considers it
    necessary to provide the plant overall logistics
    by the year 2010 with Phase 1 entered in 2006
  • Power Plant capacity
  • electric power 234 MWt
  • heat power 2?193 5?95 861 Gcal/h
  • working power supply 564 Gcal/h
  • Indicated power source capacity meets power and
    heat requirements of Zheleznogorsk city, the
    development of the city and its productions.

12
13
CONCLUSIONS 1. To continue the operation of ADE-2
Reactor at present mode till commission the
Power Plant, Phase 1. 2. To start the design of a
Coal Power Plant, full development 2 power
units and 5 steam-boilers. 3. Phase execution
of the Power Plant construction Phase 1, to
replace the reactors heat 2002 2006 to
involve the US funding as a part Phase 2, full
development 2010 funds of Zheleznogorsk city,
MCC, Minatom RF, and other sources 4. Construc
tion and commission of Power Plant allows to
create about 1000 new jobs for MCC personnel
released as the result of reactor shutdown.