Title: KALINDEE
1KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading
Engineering Construction Company for Railway
Infrastructure Track, Civil, Signaling and
Telecommunication
2 About KALINDEE
- Executing Railway Construction Projects since
1976. - The only Company which has done more than 1000
Kms of B.G. Tracks and modern Signalling at more
than 800 Stations on Indian Railways. - Corporate Enterprise since 1984
- Sound Financial standing
- Vast Experience- Railway Signalling, Telecom,
Track, Bridges, Civil Works Metro Rail
Projects - Turnkey Construction Capabilities
- Successfully completed many Challenging
Projects. - ISO 90012000 Certified Company
- Operations covering all parts of India
- Equity widely held by Indian Public.
-
1
3- Board of Directors
- Mr. R. D. Sharma
- Chairman and Managing Director
- Mr. Arvind Gemini
- Whole-Time Director
- Mr. Neeraj Kumar Singh Mr. S. K. Khanna
- Director Director
- Mr. Shanti Narayan Mr. S. P. Mehta
- Director Director
-
4Bankers State Bank of India State Bank of
Patiala Yes Bank Ltd., Overseas Branch,
Commercial Branch 48, Nyay Marg, Jawahar Vyapar
Bhawan, Chanderlok Building
Chanakyapuri 1, Tolstoy Marg, 36, Janpath
New Delhi - 110021 New Delhi 110001 New
Delhi 110001 Axis Bank ABN AMRO Bank
Ltd. HDFC Bank Ltd. 2nd Floor,Statesman House
Hansalaya Building M-39,2nd Floor, Barakhamba
Road, 15,Barakhamba Road Outer Circle New
Delhi-110001 New Delhi-110001 Connaught
Circus, Opp. Super Bazar, New
Delhi-110001 Trade Mark
3
5Sector Focus
Construction of infrastructure facilities for
Surface Transport and Telecommunication Systems
Track, Signaling and Telecommunication, Fixed
Installations for Electric Traction, Civil Works
Railways
Metro Rail Systems
Track, Signaling, Telecommunication, Access
Control Systems and Automatic Fare Collection
Corporate
Rail Sidings, Installation and up gradation of
Rail Yard, Civil Works.
PORT
Rail Track, Sidings, Yards, Signaling
Telecommunications, Civil Works
4
6Shareholding Pattern31st March 2009
In percentage
Promoter 17.21
Mutual Funds 9.10
Banks, FI and Insurance Companies 0.07
Body Corporate 23.13
FIIs 14.65
Indian Public 35.60
NRI/OCBs 0.23
5
7Financial Highlights
MILLION INR
Year 04-05 05-06 06-07 07-08 08-09
TURNOVER 540.836 901.324 1881.201 2460.344 2812.236
OTHER INCOME 2.958 --- --- --- 2.740
MATERIAL COST OTHER EXP. 492.958 820.903 1689.968 2228.216 2630.96
PROFIT BEFORE INTEREST, DEPRECIATION TAX 50.836 80.421 191.233 252.051 174.404
DEPRECIATION 4.951 5.417 6.153 8.793 13.947
TAXATION 10.099 24.364 51.605 69.450 56.065
NET PROFIT AFTER TAX 19.715 36.092 94.415 142.160 104.392
PAID UP CAPITAL 49.458 49.458 105.204 107.274 112.248
NET WORTH 144.636 176.468 695.616 858.068 1029.552
EARNING PER SHARE (INR) 3.981 7.297 15..310 (basic) 14.930 (diluted) 13.59 (basic) 11.56 (diluted) 9.50
6
8Turnover
7
9Net Profit (After Tax)
8
10Financial Performance (in Million INR)
9
11 Special Features
- Vast and diversified Experience
- Experienced Man Power
- Simultaneous Execution Of Several Projects spread
at Different Locations - Quality On-time Construction
- Excellent Reputation with clients and others
- Well Known For Co-operation
- Amenable Attitude No Litigation or Arbitration
10
12 Our CMD Mr. R. D. Sharma
- A modest beginning as an employee of Western
Railway. - Founded the Company in 1984 and piloted the same
to newer heights. - Pioneer in railway Construction by private
agency for turnkey contracts. - A well known personality in the Construction
Industry and on the Indian Railways. - Highly decorated with honours and awards .
- Recipient of prestigious Bharat Ratna
Visvesvaraya Award in 1987 by the President of
India. - Recipient of Gulzari Lal Nanda
foundations NAITIK-SAMMAN by Governor of
Rajasthan on 5th August 2006.
11
13 Recognition
- Sincere efforts and performance of KALINDEE has
won all round appreciation and recognition which
include - Letters of Appreciation by Client Organizations
- Articles of Commendation by the Press
- Special requests by Client Organizations to
Kalindee to under take works under Challenging
Situations, where other companies had failed. .
12
14Main Line of Business
- Design, Supply, Installation
Commissioning on Turn-Key basis of
- Metro Rail Track Work
- Railway New Line Gauge Conversion
- Railway Yards and Sidings
- Civil Works Earthwork, Buildings, Bridges,
Roads etc. - Railway Safety and Signaling Systems.
- Fixed Traction Installations for Electric
Traction - Metros Rail Access Control and Fare Collection
Systems - Telecom Networks based on Optical Fiber Copper
cable - Wireless Networks
- Microwave Towers
13
15 Capability for Turn-Key Construction
- Design, Installation, Testing and Commissioning
of - - Railway Yards and Lines including Track
Turn-Outs - Associated Civil Works
- Alterations to existing Track, Signaling and
Telecom Installations - Railway Signaling Installations
- Telecommunication Installations
- Railway Electrification
- Materials and Equipment
- Procurement Supply
- Clearance from Ports
- Logistical Support
- Manpower, Transport, Storage and Security
- Liaison Co-ordination at all Levels of
executions and management. - Maintenance and Warranty Support
- Simultaneous Management of Projects at Different
Locations. - Association with International Companies for
State of Art Technologies - International practices for Project Management,
Quality Control, Industrial Safety, Environmental
Protection, Designs, Drawings and Documentation
14
16 Management Strengths
- Kalindee has acquired management capabilities
to execute - Projects on Turnkey basis,
- Several Projects involving different technologies
simultaneously (Ballasted and Ballast-less Track,
Railway yards, Automatic Fare Collection, GSM
Radio network, Optical Fibre Communication,
Signaling, Industrial Sidings, etc) - Several projects at different locations
- Projects on time or even ahead of schedule.
- Kalindee can be proud of
- Adequate financial strength to undertake more
projects, rapidly rising Turnover- INR 1881 M
(2006/ 07) expected to rise to 11000 M by 2010 - Skilled and Trained Manpower
- Capability to augment its infrastructure to meet
requirements of projects in hand
15
17 RESOURCES
- Man Power
- Management Staff 20
- Engineers 30
- Supervisors 60
- Technicians 350
- Construction Machines And Tools
- Signaling, Telecommunication, Civil Works
- Technical skills
- EI, PI, RRI, CLS, AFTC, OFC, AFC, WAN LAN, GSM
- Management skills
- Project, Finance, Manpower, Material
- Organizational capacity
- Several Projects simultaneously
- Sound Financial Position
- Turn Over 1881 M INR (2006-07 )
- Reliable Experienced Sub-Contractors
- Railway Approved Quality Material Suppliers
- Reliable Experienced Material Transporters
- Good Rapport with Railways
16
18Industry OverviewIndian Railways - Opportunities
- Indian Railways is one of the largest rail
networks of the world with more than 63,300 route
kms network. - It constitutes the lifeline and mainstay of
countrys transport infrastructure carrying about
40 of freight traffic and 20 of passenger
traffic accounting for 2.3 of countrys GDP
directly and several times larger with forward
and backward linkages. - Over the last few years, Indian Railways has
managed to achieve a dramatic reinvention of its
business and is presently witnessing one of the
most impressive and unprecedented expansion in
its history. The freight and passenger traffic on
Indian Railways has been growing at average rate
of 9.2 and 7 respectively during last three
years and is projected even faster in coming
years. - Traffic growth of Railways now exceeds that of
GDP - a phenomenon without precedent. - It has been assessed that Indian Railways would
need to spend around Rs. 2,30,000 crore (US 50
billion) on various capacity enhancement measures
over the next 5-10 years period. - In the past Indian Railways had made several
attempts to rope in private participation in
Joint Ventures for rail infrastructure projects
which were however limited in scale and scope.
The current strategy is to leverage private
capital through PPPs to the maximum extent in
areas which are amenable to PPPs to improve
efficiencies and control costs. To begin with
following projects have been identified to be
implemented on PPP route
17
19Indian Railways - Opportunities
- A new Dedicated Freight Corridor initially
covering about 2700 route kms equivalent to
around 5000 track kilometers at an approximate
cost of Rs. 32,000 crores (US 7.80 billion)
linking the ports of Western India and ports and
mines of Eastern India to Delhi and Punjab. - World class Railway Stations particularly at
Metro cities eg. Delhi, Mumbai etc. - Setting up of SPV for manufacturing of
locomotives / coaches / wagons. - High Speed corridors on linking a few of bustling
metropolises with high speed rail link to
facilitate train travel over 600-1000 kms within
2 to 4 hours. - Operation of container trains and construction of
Private Sidings etc. - Port connectivity works and other Infrastructure
Projects through Rail Vikas Nigam Ltd (RVNL), New
Delhi etc.
18
20Indian Railways - Opportunities
- Dedicated Freight Corridor
- The biggest railway project - and Indias largest
infrastructure Project approved in 2005 by
committee on Infrastructure headed by Prime
Minister. - Construction on Rs. 600 billion project is
expected to commence in early 2007-08 and will be
completed in 11th Five Year Plan (2007-12) . Once
completed, it would add 10,000 kms to existing
rail network which is extremely significant
considering that only 9625 kms has been added
since 1950-51. - The corridor will initially encompass western
and eastern routes with about 2,700 route km
(equivalent to about 5,000 km of track) - Indian Railways will construct a multimodal high
axle load freight corridor with computerised
control with Rs. 32,000 crores approx in the
first phase. This is the largest spending
Railways will undertake in a decade after the
ambitious Konkan Railway project. - The corridor will link the ports of western and
eastern India to New Delhi and Punjab. - The corridor project is being implemented through
a special purpose vehicle Freight Corridor
Corporation of India Limited (DFCCIL) with an
authorised capital of Rs. 40 billion created
through a mix of engineering, procurement and
construction and public-private partnership
methods. Other freight corridors are to follow,
leading to 11,500 km of dedicated freight
corridors.
19
21Railway Sidings- Opportunities
- All large industrial projects, power generation
units, mining projects etc need Rail linkages
with main Railway lines for smooth, efficient and
reliable transportation of raw materials,
finished goods etc. - With the faster Industrial growth envisaged in
line with anticipated economic growth, demand for
Rail linkages, Rail yards, Rail siding etc
enabling huge business opportunities in this
sector. - Company has already executed / commissioned such
projects in the past for Mumbai port,
Vishakhapatnam port, Adani port, Paradip port,
BPCL, HPCL etc. - Company is presently executing Rail siding
projects for Reliance for their power project in
Yamuna Nagar, Haryana, Vedanta for their Aluminum
Project in Orissa, Dalmia (OCL) for their Cement
Project in Orissa etc.
20
22Metro Rail Systems - Opportunities
- DELHI METRO
- PHASE I
- Mass Rapid Transport Systems (MRTS) projects are
gaining momentum and is being implemented
through SPV DMRC owned by Union Government and
Delhi State Government. The progress of the
Delhi MRTS project is notable. In all, 65 kms of
Delhi Metro under Phase I is fully operational
comprising Line 1 (Shahdara-Trinagar-Rithala
22.06 kms), Line 2 (Delhi University to Central
Secretariat 10.84 kms), Line 3 (Indraprastha
Barakhamba Road Dwarka subcity .32.10 kms) - PHASE - II
- Further expansion of Delhi Metro in other parts
of city and outside in NCR region is under high
momentum of execution covering a length of
approx. 100 km at a cost of Rs. 13000 crore
approx expected to be completed in 2010. - OTHER METRO PROJECTS
- MRTS projects of Mumbai, Bangalore and Hyderabad
have already got Union Cabinet approval in March,
2006.
21
23Metro Rail Systems - Opportunities
- Mumbai MRTS Project is to be implemented by MRDA
through SPV route under BOT scheme in phases
covering a length of about 145.38 kms and is
expected to cost about Rs. 195.25 billion
expected to be completed in 2021. In August 2004,
Maharastra Government approved the implementation
of first section (Versova Andheri Ghatkopar)
of phase I on BOT through PPP model with Reliance
Energy as preferred bidder and is expected to be
completed by December, 2009 which started in
November, 2006. - Bangalore MRTS Project is to be implemented by
Bangalore Mass Rapid Transit Ltd (BMRTL) through
SPV created by Karnataka Govt. and is proposed to
be implemented in several phases spanning about
33 kms with an estimated outlay of Rs. 6395
crores. While Karnataka Government cleared the
proposal in March, 2005, Union Government gave
its approval in April, 2007. Work on first
elevated section of 7 kms started in December,
2006. Phase I is expected to be commissioned in
December, 2007. - Hyderabad MRTS Project cleared in Jan, 2007 is
proposed to be implemented by a SPV Hyderabad
Metro Rail Limited through PPP route on BOT basis
with authorised capital of Rs. 10 billion and is
expected to cost about Rs. 8760 crores. It is
expected to commence in January, 2007 and is
likely to be completed in 2011 with 66.39 kms
long stretch.
22
24 Outstanding Achievements
- Turnkey Rail Track Contracts (Ballast-less
Ballasted) - Ballasted Track Assembly 2 Kms / Day
- Ballasted Track Speed Trial Run 130 Kmph
- Ballast-less Track work 300 m/day
- Turnkey Rail Infrastructure Contracts
- Railway Signaling Works on Contract
- Telecommunication Works on Contract
- Turnkey Railway Signaling Contracts
- Turnkey Telecommunication Contracts
- Largest Contract undertaken
- On Konkan Railway Corporation for
- Railway Signaling 54 stations
- OFC 1000 Km
- Track 60 Km
23
25Major projects presently on hand
- Work value
- Turnkey Projects ( In Million USD)
- VILLUPURAM-MAYILADUTURAI (RVNL)
41.37
- 121.78 kms Gauge conversion project if
southern railway in - JV with Tata Projects Ltd.
- VEDANTA ALUMINA LTD. 12.28
- Rly. Siding for Smelter Plant at Jharsuguda,
Chhatisgarh - RELIANCE ENERGY LTD. 2.82
- Rly. Siding at Yamuna Nagar for 2X300 MW DCR
thermal power project - GOOTY-PULLAMPET (RVNL)
23.34 - 151.05 kms signalling project of south central
railway - in JV with Leighton Holdings Ltd., Singapore
- PALWAL-BHUTESHWAR (RVNL)
26.98 - 81 km track laying signaling project in
nothern railway in
24
26 Our Valued Clients
- Indian Railways
- Konkan Railway Corporation
- Bharti Telecom
- Vizag Port Trust
- Videsh Sanchar Nigam
- Mumbai Port Trust
- Adani Port Trust
- Tata Tele Services
- Indian Oil Tanking
- Reliance Energy
- Reliance Infrastructure Ltd
25
27 International Co-operation (for
Track Civil Engineering)
- Kalindee Has Been Associated With-
- Company Country
Technology - TSO FRANCE METRO TRACK
- WERMER TRACTE GERMANY ROADS
- CHINA HARBOUR CO. CHINA CIVIL
- EICHHOLZ GERMANY TRACK
- BWG GERMANY TRACK
- PANDROL UK TRACK
26
28 International Co-operation (for
Signaling)
-
- Kalindee Has Been Associated With -
- Company Country
- HARMON IND. USA
- INTERLOGIC UK
- SASIB (GRS) USA
- UNION SWITCH USA
- GE TRANSPORTATION USA
27
29 International Co-operation (for
Telecommunication)
-
- Kalindee Has Been Associated With -
- Company
Country Technology - ERICSSON SWEEDEN TELECOM
- BOSCH TELECOM GERMANY TELECOM
- KABEL RHEYDT GERMANY OFC
- ALCATEL PORTUGAL TELECOM
- MOTOROLA USA GSM
- SAMSUNG SDS KOREA
AFC - GE TRANSPORTATION UK
TELECOM
28
30 Rail Track Construction for Delhi Metro
- Salient Features of the Project completed are
- Ballast-less Track 24.271 Kms.
- Ballasted Track in Depot 10.825 Kms.
- Ballast-less Scissor Cross Over (112) 4 Sets
- Ballast-less Points and Crossing (112) 4 Sets
- Ballast-less Points and Crossing (18.5) 7 Sets
- Ballasted Scissor Crossover (18.5) 1 Set
- Ballasted Points and Crossing (18.5) 62 Sets
- Flash Butt Weld 4346 Nos.
- A.T. Weld 1388 Nos.
- Completion period 18 months
29
31 Ballast-less Track Work
30
32Ballast-less Points Crossing in Tunnel
31
33 Preparation for Casting - GSF Setting
32
34Ballast-less Track Works in Tunnel
33
35 Flash Butt Welding
34
36ACCESS CONTROL AND FARE COLLECTION SYSTEMS FOR
METRO RAIL
- Array of AFC Gates
- Smart Card Reader
- Ticket Office Machine
- Kalindee has acquired in the State of Art
Technology for Access Control and Automatic Fare
Collection System having installed the same for
Delhi Metro Rail Corporation. - This system uses the latest contact-less tokens
for fare collection for the first time in the
World for Single/Double journey in addition to
the contact-less smart card. All the equipments
at individual stations are connected to the
Station computer through LAN (CAT5 / OFC) and all
the stations in turn are connected to the
Operation Control Central through WAN (OFC) at
Shastri Park. - Till date Kalindee has successfully commissioned
34 Stations (24 Elevated and 10 Underground), 1
Operational Control Centre, 1 Software
Development Centre and 1 Training Centre
comprising of 317 Nos. of AFC Gates, 178 Ticket
Office Machines (TOM) including the Excess Fare
Collection Office, 98 Nos. of Ticket Readers
(TR), 34 Station Computers, 31 sets of UPS
ranging from 7.5 to 15 KVA, 145 Electrical
Distribution Cabinets, 35 Nos. of Cisco Routers
and 85 Nos. of HP Switches. - Recently Kalindee in Consortium with Samsung SDS
has won the BS 22 AB Contract from DMRC in a
very tough Global Competition for implementing
the AFC System on 19 Stations of Phase II. This
includes 41 Stations Foreign Supplies also. - Similar AFC Projects are under consideration with
MMOPL (Mumbai Metro Phase I).
35
37Major Turnkey Projects Completed
- Remodeling up-gradation of Railway Yard at
Wadala and Raoli for Mumbai Port Trust - Installed Track 18.7 Kms.
- Points Crossings 70 Nos.
- Traps 3 Nos.
- Private Railway Siding for IOTL at Navghar,
Mumbai - Installed Track 7.25 Kms.
- Points Crossings 18 Nos.
- Traps 9 Nos.
- Private Railway Siding for HPCL at Balasore,
Orissa - Installed Track 4 Kms.
- Points Crossings 10 Nos.
- Traps 5 Nos.
- Approach Road to Bina Thermal Power Station
- Total Length 6.85 Kms.
36
38 Track Works
- Straight Track 1068 Kms.
- Points Crossings (112) 204 Nos.
- Points Crossings (18.5) 353 Nos.
- Points Crossings (116) 4 Nos.
- Trap Points 154 Nos.
- Mixed Gauge Diamonds 4 Nos.
37
39QUALITY PROJECT EXECUTION IN RECORD TIME
- Nokha Naugar Merta Road 144 Kms. Track Work
- Completed In Record Time of 4 Months
- Achieved Highest Av. Linking Speed Of 2 Kms/day
- Executed in Hostile Environment of Desert Area
- Initial Speed Trial Of 120 Kmph
- Commercial Sanctioned Speed Of 100 Kmph
- Set A Land Mark Of Quality and On Time
- Track work for the contiguous Bikaner- Nokha
- (62 Kms) was completed by Railway Staff
engaging - 5 Contractors in 9 Months time and achieving
speed - trail of 60 Kmph only Commercial
sanctioned - Speed of 50 Kmph only.
- Jodhpur- Phulera 300 Kms Track Work also
Completed - in Record Time of 4 Months Time.
- Phulera Ajmer 82 Kms Track work Completed in
2 - Months and 10 Days only
- All these works reveal the highest level of
quality and
38
40- PRESTIGIOUS PROJECTS UNDERTAKEN ON KONKAN
RAILWAY - 54 Stations Panel Interlocking Biggest
Signaling Project undertaken - OFC System on 1000 Km Biggest Telecom Project
undertaken - 60 Km of B.G. track laid in hostile
mountainous environment.
Route Map of Konkan
Railway Kalindees performance won all-round
appreciation and applause for executing these
projects in time and as per the highest standards
of quality.
39
41 Signaling works completed
- Electronic Interlocking 8 Stns.
- Panel interlocking 212 Stns.
- Color light Signaling 182 Stns.
- Conventional Signaling 260 Stns.
- For 25 KV AC Traction 41 Stns.
- LC Interlocking 127 Nos.
- Route relay interlocking 26 Stns.
- Major yard Signaling 33 Stns.
- Token Less Block System 98 Stns.
- Multiple Aspect Signaling 58 Stns.
- Axle Counter Block Systems 137 Nos.
- Automatic Signaling 26 Kms.
- Audio Frequency Track Circuit
- Automatic (AFTC) for Signaling 115
Sets -
40
42 Telecommunication works completed
- U/G Optical Fibre System 2,434 Kms
- OFC Equipment Installation 100 Stations
- Wireless Network (GSM) 60 Kms.
- MSO and EBTS 4 Nos.
- Mobile Train Radio 220 Cabs
- U/G Copper Cable 6,984 Kms.
- Overhead Lines 400 Kms.
- Fab. And Erec. of M/W 32 Nos.
Towers
41
43 Major ST Turnkey Projects Completed
- Signaling at 23 stations with panel interlocking
on Nagpur - Durg section - Signaling at 54 stations on Konkan Railway.
- 1000 Km long OFC Communication System for Konkan
Railway - 150 Kms. OFC Communication System on Northern
Railway - RRI System at Cuttack Station of East Coast
Railway
42