Title: FREIGHT
1OPERATING DEPARTMENT
FREIGHT
2009 - 2010
2FREIGHT OPERATIONS
- Implementation of Operation Chetak
- Running time of trains was calculated on absolute
basis i.e. running was calculated at the speed of
75 Kmph and 60 Kmph (for Sumo rake). Analysis of
detention is done against these timings. This
has led to improvement in running of trains.
Diesel loco utilization improved by 0.47 and
electric loco utilization improved by 2.96. - Extended Crew runs
- Emphasis was put on extended crew runs so as to
cut down detention at major terminals like
Varanasi, Roza, Ambala and Ludhiana. Average 800
crack trains were run per month during
2009-2010as against 598 cracks per month in the
last year. The extended crew runs have led to
reduction in running timing of power house rakes
being received at MGS, 38-40 hrs. which used to
be 60 hrs.
3- Breaking the mould -
- Divisions are being encouraged to provide out of
box solution to problems. - Shortage of diesel locos led to running of long
haul jumbo empties over Moradabad division. - Now 22 loaded BCN wagons are being run in
Haridwar Rishikesh / Harawala section with
single WDG-3 loco as against 14 which were run
earlier and full empty rake of jumbo is run with
a single power on this section - Multi has been replaced by single WDG4 on PTK-JAT
section. - Running of Down trains through to PBH and UP
trains on FD loop - To overcome shortage of jumbos N.R. used premium
BCN rakes for internal loading and were able to
achieve 4 loadings during their premium validity
. This helped to maximize loading despite the
shortage. - Delhi division streamlined movement between
GZB-SBB by making it direction wise reducing the
running time to 20-30 min from 1-130 hrs. LKO
division is also attempting similar exercise. - Formulated guidelines regarding sidings of PCOs
- Standardizing statistical formats for divisions.
4- Enabling through IT -
- New Operating website URL http//10.2.2.19/dept/o
perating/index.htm - Enables Operating Officers have topic wise
availability of circulars Rate Freight
Circulars, Freight Marketing Circulars, Traffic
Transportation Circulars and many other useful
links. - Archival formats of Central Control to be
generated from FOIS and record keeping to be made
digital, reducing requirement of storage space
and manpower. - Concept Plan-
- Divisions have been asked to make long time plan
for enhancement of freight terminal capacity and
line capacity. LKO ,MB divisions have been
reviewed.
5REVENUE EARNING LOADING (In Million Tonnes)
SN COMMODITY TARGET APR TO MAR ACTUAL APR TO MAR ACTUAL APR TO MAR age Variation over last year age Variation over Target
SN COMMODITY 2009-10 2008-09 2009-10 age Variation over last year age Variation over Target
1 FOODGRAIN 14.50 14.97 18.62 24.38 28.41
2 FERTILIZER 6.60 6.36 6.75 6.13 2.27
3 POL 5.75 5.73 6.35 10.82 10.43
6 CEMENT 3.02 2.74 2.49 -9.12 -17.55
4 IRON STEEL 0.13 0.03 0.02 -33.33 -84.62
5 CONTAINER 5.72 6.13 6.64 8.32 16.08
7 OTHERS 5.48 4.15 4.39 5.78 -19.89
8 TOTAL 41.20 40.11 45.26 12.84 9.85
Northern Railway has achieved everbest
loading during 2009-2010
6OPERATING PERFORMANCE
S.N. ITEMS APR - MAR APR - MAR age variation
S.N. ITEMS 2008-2009 2009-2010 age variation
1 THROUGH PUT (Wagons per day) 12400 13487 8.77
2 TOTAL RECEIPTS (Wagons per day) 6200 6746 8.81
3 TOTAL DESPATCHES (Wagons per day) 6200 6741 8.73
4 LOADED RECEIPTS (Wagons per day) 4970 5709 14.87
5 WAGON TURN ROUND (Days) 1.35 1.34 -0.74
6 REVENUE LOADING EARNING (Crores Rs.) 3568.08 4296.85 20.42
7 REVENUE LOADING (Million tonnes) 40.11 45.26 12.84
8 DIESEL LOCO UTILISATION (Kms/loco/day) 531.5 534 0.47
9 ELECTRIC LOCO UTILISATION (Kms/loco/day) 489.5 504 2.96
10 CRACK TRAINS RUN (per month) 598 800 33.78
7Status of FOIS projects on Northern Railway
DIVIN RMS RMS TMS (PHASE - I) TMS (PHASE - I) TMS (PHASE - II) TMS (PHASE - II)
DIVIN Sanctioned Commissioned Sanctioned Commissioned SanctionedPh I of TMS PhII CommissionedPh I of TMS PhII
DLI 8 7 13 12 7 3
MB 2 2 6 6 4 2
UMB 6 6 20 20 4 3
LKO 3 3 7 7 4 1
FZR 5 5 16 16 4 4
TOTAL 24 23 62 61 23 13
Note - For TMS Phase-II of Phase II , 139 New
locations have been sanctioned
8Status of FOIS projects on Northern Railway
DIVIN ICMS ICMS CMS CMS COA COA
DIVIN Sanctioned Commissioned Sanctioned Commissioned Sanctioned Commissioned
DLI 6(12) 6(10) 13 13 6 6
MB 5(10) 5(10) 7 7 5 5
UMB 6(12) 6(12) 5 5 4 4
LKO 3(7) 3(7) 8 8 6 6
FZR 6(10) 6(10) 7 7 4 4
NDBH 1(14) 1(14) 0 0 0 0
TOTAL 27(69) 27(67) 40 40 25 25
9OPERATING DEPARTMENT
OPERATING SAFETY
2009 - 2010
10- Achievements and Innovations
- Total number of amendment slips issued as
under- - GSR Book - 17
- Operating Manual - 01
- Block Working Manual - 03
- Accident Manual - 03
- Master Amendment Slip for LC gate working
- 01 - Operating Safety Seminars Meetings organized
at - HQs level 02
-
-
-
11- ZRTI/ Chandausi
- Achievements-
- Committee of 3 SAG officers (COM/G,CEGE
CE/PD) visited ZRTI/CH - for improvement/ upgradation of the training
facilities at ZRTI/CH. -
- The problem of messing charges to be realized
from trainees has been - resolved.
- Training courses on Disaster Management for
Supervisors has been - introduced.
- Training Modules of Induction Course for multi
skilled group D staff - approved and implemented.
- The Training Modules of Induction Course for
multi skilled group C - Category, Station Assistant has also been
approved and implemented.
12- Innovations-
- Long awaited reprint of GSR book of N.Rly with
latest Correction Slip no.147 dt.05.04.10 has
been approved for printing and will be supplied
to all Divisions by April. - New revised Operational forms for train
operations has been approved and supplied to the
divisions for smooth operations. - Data Base of SWRs with Station diagrams and
Traffic LC gates on proper prescribed proforma
with details of Civil Police authorities, Fire
Brigades, Hospitals and NGO etc of all the
stations of N.Rly being prepared. - Establishing a Work Station for training of Optg
staff of NR on IT matters to assist in IT
projects (under process)
13OPERATING DEPARTMENT
PLANNING
2009 - 2010
14Functions of Operating Planning Cell in Head
Quarter.
- To co-ordinate with divisions ,examining, and
finalizing of works pertaining to Plan
Head-11(New lines ,gauge conversion), 15
(Doubling) and 16 (Traffic facility). - Monitoring of the progress of on going works
under plan head- New line, Gage conversion,
Doubling, Traffic facility etc. - To co-ordinate with Non interlocking works.
- To examining ESPs keeping in view the operating
facilities. - To prepare preliminary Works Programme of Vol-II
complete in all respect and sending it to Railway
Board. - To examine plans of level crossing gates.
- Examining and processing of Private Siding
Proposals.
15Improvements- Planning cell
- Development of works Programme Data Base.
- Development of Data Base of Private Siding
proposals. - Short CSL running line identified over Northern
Railway network- 1 station completed and works at
51 stations are under progress. - JPO for finalizing check list for processing
Engine Scale Plan. - Policy for provision of RD lines at Private
Container Sidings issued. - PI/RRR commissioned at 37 stations yards during
2009-10.
16Performance of Planning Cell
- 60 number of works were sanctioned in vol V
(2009-10) within GM Power. - A total No. of 33 works were proposed to Rly
Board out of which 11 nos of works have been
sanctioned by Railway Board in Vol II (2010-11). - Works under progress-
- New Lines Works 12
- Doubling works 15
- Traffic Facility works 49
- Law Book 19
- Volume V works 64
- No. of ESPs finalized other than level crossing
gates - 63 - 3 works under Plan head 15 25 works under Plan
head 16 were completed during 2009-10
17Streamlining of Procedures for Private Siding
proposals
- A separate cell headed by Sr.Scale Officer setup
to process Private Siding proposals - Clearly delineated procedure for processing of
proposals - Ensures availability of appropriate operational
facilities and accurate traffic projections. - Ensure all charges payable to Railways are
submitted. - Ensures timely execution of work and
commissioning
18OPERATING DEPARTMENT
COACHING
2009 - 2010
19SPECIAL TRAINS RUN
2009-2010
SPECIAL TYPE APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
SUMMER SPECIAL 818 1089 1081 42 0 0 0 0 0 0 0 0
PARA-MILITARY SPECIAL 3 56 2 0 18 7 3 5 0 0 0 4
DURGA PUJA SPECIAL 0 0 0 0 0 508 0 0 0 0 0 0
MELA SPECIAL 0 0 16 0 0 0 0 0 0 72 66 85
DIWALI/WINTER SPECIAL 0 0 0 0 0 0 1338 569 552 439 0 0
UNION SPECIAL 0 0 0 0 0 0 0 0 0 0 0 0
YATRA SPECIAL 6 5 5 2 12 5 11 11 10 14 11 11
EXTRA SPECIAL 1 48 10 511 347 24 0 6 9 5 360 468
TOTAL 853 1198 1114 555 377 544 1352 591 571 530 437 568
20TRAINS INTRODUCED/EXTENDED/ FREQUENCY INCREASED
DURING 2009-10
Introduction Introduction Total Extension Extension Total Increase in Frequency Increase in Frequency Total
NR FR Total NR FR Total NR FR Total
Duronto 4 7 11 0 0
Yuva 0 2 2 0 0
Mail/Exp. 4 12 16 2 3 5 4 3 7
Passenger 0 0 0 1 1 0
EMU 4 0 4 1 1 0
Total 12 21 33 3 3 6 4 3 7
21Punctuality age of Mail/Express Trains
Months Punctuality
Apr-09 77.30
May-09 79.00
Jun-09 82.80
Jul-09 83.50
Aug-09 84.60
Sep-09 75.00
Oct-09 66.90
Nov-09 66.60
Dec-09 67.80
Jan-10 40.00
Feb-10 59.00
Mar-10 66.70
Cummulative 70.80
Note The COA system became operational in
October09, Thus heralding real-time
feeding of time and 1 minute Punctuality