GOVERNMENT OF BALOCHISTAN - PowerPoint PPT Presentation

1 / 44
About This Presentation
Title:

GOVERNMENT OF BALOCHISTAN

Description:

No. of Conservation Sch: 459. Total Cost Rs.1747.80 M Discharge to be ... About 50% Dams will be completed by June 2004 out of 125 carried over to 2003-04. ... – PowerPoint PPT presentation

Number of Views:595
Avg rating:3.0/5.0
Slides: 45
Provided by: nisar1
Category:

less

Transcript and Presenter's Notes

Title: GOVERNMENT OF BALOCHISTAN


1
(No Transcript)
2
GOVERNMENT OF BALOCHISTAN IRRIGATION POWER
DEPARTMENT
PRESENTATION ON WATER RESOURCES PRESENT SCENARIO
AND FUTURE PROSPECTS
February, 2004
3
No. of Major Basins 13 No. of Sub Basins
73 Total Flood Runoff Generated
12.756 MAF
4
BALOCHISTAN MAP
Area in Sq.Km
5
LAND USE IN BALOCHISTAN
  • Total Geographical area 85.758 Million acres
  • Area Suitable for Agriculture C.C.A 33.155
    Million acres
  • (38.66 of Total Geographical area)
  • Area Cultivated
  • - Perennial/Canals/Tube wells/Karezes/
    2.390 Million acres
  • springs (All Means)
  • - Selaba/Flood Irrigation/by Gunda 2.11
    Million acres
  • Traditional system.
  • - Total area under Irrigation by all
    4.50 Million acres (13.60 of CCA)
  • sources (Perennial cum floods)
  • Balance area that can be brought
  • under cultivation (If water is made
  • availability). 28.655 Million acres
  • Source Agriculture Statistics of Balochistan
    2001-02

6
COMPARATIVE UTILIZATION OF SOURCES(1972 VERSUS
PRESENT)
Acres
7
WATER BALANCE SCENARIO
8
WATER RESOUCES DEVELOPMENTAS OF JUNE 2003
9
INDUS COMMAND AREA
10
AVAILABILITY, PRESENT AND PROPOSED UTILIZATION
WATER AS PER INDUS WATER ACCORD 1991
  • Perennial as per Water Accord 3.8720 MAF
  • Share of Balochistan as result of Mangla Dam
    Raising 0.3600 MAF
  • Flood Supplies (to be utilized in Kachhi Canal
    out of
  • 4.620 MAF _at_ 12 of 38.50 MAF) as per WAPDA study
    1998. 1.3050 MAF
  • Total 5.5370 MAF

Kharif Allocation 1.399 MAF Rabi
Allocation 0.621 MAF
11
FUTURE PLAN FOR CANAL SYSTEM DEVELOPMENT
  • EXTENSION OF EXISTING IRRIGATION SYSTEM AND
    CREATION OF NEW SYSTEM.
  • Extension of Patfeeder and Khirther Canal
    Systems
  • Construction of Kachhi Canal System
  • LINING OF CONVEYANCE SYSTEM
  • Lining of Distributaries and Minors of Patfeeder
    Khirther Canal Systems.
  • MITIGATING WATER LOGGING
  • Construction of surface and sub surface drainage
    system in Patfeeder and Khirther Canal System
    Areas and disposal through RBOD.

12
ON-GOING PROJECT IN INDUS COMMAND AREA
13
  • 1. KACHHI CANAL PROJECT
  • Location. Punjab D.G.Khan Rajan Pur,
    Districts.
  • Balochistan Dera Bugti, Nasirabad,
    Bolan, Jhal Magsi District.
  • Canal Capacity. 6000 Cusecs
  • Length of Main Canal. 500 Km (300 Km in Punjab-
    Lined and 200 Km in Balochistan - Unlined)
  • Length of Distr/ Minors 2000 km.
  • Project Benefits. 713,000 acres to be irrigated
    (Irrigation intensity 80.4)
  • Dera Bugti 100,200 Acres, Nasirabad
    277,900 Acres,
  • Bolan- 127,400 Acres, Jhal Magsi 207,500
    Acres
  • Balochistan will get Indus Water through an
    independent canal from Taunsa Barrage.
  • Execution by. WAPDA
  • Date of commencement. October, 2002.

14
Reference Towns Distance from Canal
From Sui
10 Km South
From Nautal
13 Km North
From D.M Jamali
38 Km North
From Bakhtiarabad
15 Km South
15
  • 2. LINING OF CHANNELS IN BALOCHISTAN (Rs.5.00
    BILLION)
  • 2.1 PHASE-I
  • CONSTRUCTION OF 43 MINOR CANALS REMODELING/
    EXTENSION OF EXISTING 49 MINOR CANALS IN THE
    COMMAND OF PATFEEDER
  • Total cost Rs. 700.00 million
  • Allocation for 2003-04 Rs. 300.00 million
  • Executing Agency Irrigation Power Department
    (GOB)
  • Project Components
  • Lining of 43 Minors in a length of 78 Km.
    (10-35 cusec capacity)
  • Remodeling/ Extension of existing 49 Minor
    Canals in a length of 25 Km.
  • Remodeling/Extension of drains in a length of
    105 Km.
  • Physical Progress
  • The project has been approved from ECNEC on
    7-01-2004. Work on all 9 packages is in progress
    (Over all physical progress 2) .

16
  • 2.2 PHASE-II
  • LINING OF CHANNELS IN INDUS NON INDUS
    IRRIGATED AREAS
  • Total cost Rs. 4300.00 million
  • Allocation for 2003-04 --
  • Executing Agency Irrigation Power Department
    (GOB)
  • Briefing Description Indus Irrigation System
  • No. of Minors/
  • Distributaries to be lined 161
  • Total Cost Rs.2552.20 M Discharge
    to be conserved 1074.3 cusec
  • Add area to be benefited. 107425 acres
  • Non Indus Irrigation System
  • No. of Conservation Sch 459
  • Total Cost Rs.1747.80 M Discharge
    to be conserved 254.00 cusec
  • Add area to be benefited. 25406 acres

17
  • 3. KIRTHER CANAL REMODELING (Nasirabad,
    Jaffarabad Jhal Magsi Districts)
  • Total cost Rs. 1000.00 million
  • Allocation for 2003-04 Rs. 200.00 million
  • Executing Agency Irrigation Power
    Department (GOB)
  • Through Consultants
  • Project Components i) Remodelling of Main
    Canal.
  • ii) Remodelling of Distributaries.
  • iii) Remodelling of Regulator Structures.
  • iv) Remodelling of F/P Bund.
  • v) Lining of Minor Canals.
  • Physical Progress
  • The project has been approved by PDWP and
    submitted to Federal Government for approval.

18
  • 4. EXTENSION OF PATFEEDER CANAL
  • Total approved cost Rs. 2.300 Billion
  • Allocation for 2003-04 Rs. 1.000 Billion
  • Executing Agency Irrigation Power
    Department (GOB)
  • Through Consultants
  • Project Components i) Remodelling of Existing
    Patfeeder Canal for enhanced capacity of
    8560 Cusec.
  • ii) Extension of Canal 37 km
  • iii) Constt of 7 No Distributaries/Minors in
    a length of 134 km.
  • iv) Constt of cross drainage, foot bridges
    F/P Bund.
  • v) Remodelling of existing X-Regulators.
  • Physical Achievements
  • The scheme has been reflected in PSDP 2003-04.
    Consultant are being engaged for detailed design
    and construction supervision.

19
(No Transcript)
20
RESERVATION OF BALOCHISTAN PROVINCE ON INDUS
WATER ACCORD
  • Reviewing and rationalizing the Escapages below
    Kotri by neutral International Consultants. GOB
    is of opinion that Escapages below Kotri should
    be met from the share of Sindh.
  • Balochistan had accepted under compulsion the
    Kachhi Canal from Taunsa otherwise ideal
    requirement was of Mithan Kot which was not
    agreed by Punjab.

21
OUT SIDE INDUS COMMAND AREA
22
WATER BALANCE SCENARIO
In some basins groundwater is being mined and
water table is depleting.
23

BASINWISE STATUS OF GROUNDWATER DEPLETION
() Surplus (-) Mined
24
BASINWISE STATUS OF GROUNDWATER DEPLETION
() Surplus (-) Mined
25
BASINWISE STATUS OF GROUNDWATER DEPLETION
() Surplus (-) Mined
26
FUTURE PLAN FOR LAND DEVELOPMENT OUT SIDE INDUS
BASIN
  • A. HARNESSING OF FLOOD FLOWS (BALANCE 9 to 10
    MAF)
  • Recharge of the Groundwater Aquifers through the
    construction of Check and Delay Action Dams.
  • Construction of Storage Dams to supply drinking
    and irrigation supplies.
  • Watershed Management to control erosion of soil
    and subsequent reduction in sedimentation of
    reservoirs.
  • LINING OF CHANNELS AND IMPROVING IRRIGATION
    EFFICIENCY
  • Lining of Channels in upland areas
  • Introduction of high efficiency irrigation
    facilities like bubbler and sprinkler systems

27
ON-GOING / PROPOSED FLOOD CONSERVATION
PROJECTSAT A GLANCE
28
ON-GOING DEVELOPMENT PROGRAMMES
29
DELAY ACTION/STORAGE DAMS UNDER VARIOUS
DEVELOPMENT PROGRAMMES 2002-03/04
About 50 Dams will be completed by June 2004
out of 125 carried over to 2003-04.
30
DEVELOPMENT PROGRAMMES 2002-03 / 04ABSTRACT AT A
GLANCE
31
DEVELOPMENT PROGRAMMES 2002-03 / 04
32
DEVELOPMENT PROGRAMMES 2002-03 / 04
33
ON GOING MEGA OROJECTS (BY WAPDA)
  • 1. MIRANI DAM PROJECT
  • Location. Turbat District Kech, Balochistan, On
    River Dasht.
  • Executing Agency. Water Power Development
    Authority (WAPDA)
  • Brief Scope of The Project. - 127 Ft. High Earth
    Fill Dam with Crest length of 3350ft. -
    Reservoir Capacity (Gross) 302000 AFt. (Live
    152000 Aft.)
  • - Command Acre 33200 acres.
  • - Canal Capacity, Right 236 cusecs and Left
    141 cusecs.
  • - Generation capacity 350 Kw.
  • Donor Agency. Government of Pakistan (GOP)
  • Commencement Date. 01-7-2002.
  • Ground Breaking Ceremony 17-08-2001
  • Financial Progress i) Total Cost (Civil Works)
    Rs. 4250.000 Million
  • ii) Expenditure upto Oct 2003 Rs.
    1398.855 Million

34
  • Physical Progress 12.97
  • Status
  • Contract for the construction of project on
    EPC/Turnkey basis awarded to Mirani Dam Project
    joint Venture lead by M/s DESCON for Rs. 4.25
    billion on 15-06-2003. Dam area land handed over
    to the Contactor on 16-09-2003.

35
  • 2. SABAKZAI DAM PROJECT
  • Location. Sawar Rud, Tributary of Zhob River,
    Zhob District, Balochistan.
  • Executing Agency. Water Power Development
    Authority (WAPDA)
  • Brief Scope of The Project. - 30 meter high
    Earth Fill Dam
  • - Gross storage 0.02 MAF
  • - Command area 6,680 Acres
  • Commencement Date. 01-01-2003
  • Completion Date 31-12-2005
  • Financial Progress i) Total Cost
    Rs. 1102.972 Million
  • ii) Expenditure upto Oct 2003 Rs.
    64.308 Million
  • iii) Allocation for 2003-04 Rs. 500.00
    Million
  • Current Status/Progress - Feasibility report
    completed by WAPDA in March 2003.
  • - PC-I approved by ECNEC in its meeting held
    on 27-9-2003 for

36
  • 3. SECOND FLOOD PROTECTION SECTOR PROJECT
  • GOP F.P.A
  • Total cost (Donor Agency wise) 217 (75 ADB
    Share)
  • 71 (25 as GOP Share)
  • Total Rs. 288.00 Million (_at_ 5.1 of the cost
    of the project)
  • Allocation for 2003-04 193.00 (Share of
    Balochistan Province)
  • Project Components i) Two Core Projects (7
    sub-projects of Flood Protection.
  • ii) Eighteen (18) D.A.Dams throughout
    Balochistan.
  • Physical Achievements
  • Two Core Projects (7 sub-projects ) of flood
    protection Toba Achakzai area Patfeeder Canal
    (Rs. 100 million) have been approved tenders
    invited from Pre qualified contractors.

37
PROPOSED MEGA PROJECTS TO CONSERVE FLOOD FLOW
  • No. of Projects 41 Nos.
  • Estimated Cost Rs. 56183.00 Million
  • Area to be benefited 1.30 Million Acres
  • Runoff to be utilized 6.5 MAF

38
PROPOSED MEGA PROJECTS TO HARNESS FLOOD RUNOFF
39
PROPOSED MEGA PROJECTS TO HARNESS FLOOD RUNOFF
40
PROPOSED MEGA PROJECTS TO HARNESS FLOOD RUNOFF
41
PROPOSED MEGA PROJECTS TO HARNESS FLOOD RUNOFF
42
PROPOSED MEGA PROJECTS TO HARNESS FLOOD RUNOFF
43
(No Transcript)
44
THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com