Title: MANAGEMENT OF HILL TORRENTS
1MANAGEMENT OF HILL TORRENTS
- Management of hill torrents crossing the Kachhi
Canal to reduce the peak flows to safeguard the
canal and to increase the agricultural production
in Pachad Area - Review alternatives to
- Adopt hill torrent management to reduce the peaks
or - Remodel existing X-Drainage / Hill Torrent
Structures of D.G. Khan Canal and Dajal Branch
from RD 0 to RD 531 as per criteria to be adopted
for Kachhi Canal - Review various modern alternatives for hill
torrent management
2(No Transcript)
3D.G.Khan Hill Torrents
4MAP OF KAHA HILL TORRENT
5GENERAL TYPES OF STRUCTURES FOR MANAGEMENT OF
HILL TORRENT
- Storage Dams
- Delay Action Dams
- Check Dams
- Flood Distributors
- Dispersion Structures
- Diversion Dykes
- Cross Dykes
- Flood Irrigation Channels
- Flood Disposal Channels
6KAHA HILLTORRENT
7SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN
BALOCHISTAN
8SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN
PACHAD AREA- PUNJAB
Cost of Schemes RS 130 Million Potential Area
36,253 HA
9MAP SHOWING MANAGEMENT WORKS ON KAHA HILL TORRENT
IN PUNJAB
10PROJECT IMPACTFLOOD PEAK EVENTS/INUNDATION
PRE-PROJECT
- YEAR 1973
- FLOOD PEAK 56,000 CFS (1,586 CMS)
- BREACHES - DAJAL BRANCH 148 Nos.
- DISTYS. DAMAGED
- - NAUSHERA
- - ZAMZAM
- - ISLAM
- - ABE-HAYAT
- AREA INUNDATED 45,000 ACRES (18,220 HA)
POST-PROJECT
- YEAR 2003
- FIRST PEAK 2ND JULY, 2003 60,000 CFS (1,700
CMS) - SECOND PEAK 10TH JULY, 2003 60,000 CFS (1,700
CMS) - THIRD PEAK 14TH JULY, 2003 51,900 CFS (1,470
CMS) - BREACHES 5 No - Relief Cuts
- DISCHARGE AT CANAL CROSSINGS 9,000 CFS
- AREA INUNDATED NOMINAL
11PRE POST-PROJECT ATTENUATION OF FLOOD PEAKSFOR
KAHA HILL TORRENT
Discharge - CFS
12CROPPING PATTERN AND INTENSITIES UNDER PRE AND
POST PROJECT CONDITIONS
CCA 36,253 HA
13PROPOSED AND ACTUALLY BENEFITED AREAS
AGAINST VARIOUS PEAK FLOODS
CCA 36,253 HA
14COMPARISON OF ECONOMIC INDICATORS
15FUTURE STRUCTURAL IMPROVEMENTS
- PROP WALL CONSTRUCTED UNDER THE CREST ON D/S
SHOULD BE PLACED UPSTREAM UPTO CREST LEVEL TO
ENSURE - Uniform flow
- Check washing of fines
- Safety Against Scour
- ORDER OF CONSTRUCTION
- Construction must start from Darrah to down stream
- DEGREE OF PROTECTION
- Down stream works need more protection as
compared to the upper ones
- STRCTURAL IMPROVEMENTS
- Upper end of Salai should be semi circular
instead of rectangular - Terminal end should be similar to that of guide
bund - Off-take should be located 10 H above the cross
structure - For H instead of drop falls
16(No Transcript)
17(No Transcript)
18(No Transcript)
19COST OF STRUCTURAL INTERVENTIONS
20FINDINGS CONCLUSIONS
- Efficacy of existing cross-drainage structures on
DG Khan Dajal branch be evaluated. - Flood peak attenuation at cross-drainage
structures through dispersion structures is
significant. - Suggested improvement in the design of structural
interventions be taken into account in future
hill torrent projects. - In spite of shortcoming in design, diversion of
flood flows in Pachad area has been reasonable
during post-project environments. - Construction of dispersion structures in Pachad
area is technically and socially more attractive
than disposal of flows into Indus River. - Ensure the availability of funds for OM at
proper time. - Existing future users of canal water on the
right bank through lift pumps be duly considered
for planning design of Kachhi Canal.
21RECOMMENDATIONS
- Dispersion Structures in Pachad Area on Sori-
Lund, Sakhi Sarwar,Vidore, Chachar, Zangi Shori
Janubi and Flood Carrying Channels in Command
Area be constructed. - Carrying Channels leading to Indus River for
Pitock and Shori Shumali be constructed. - Cross drainage Structures on Kachhi Canal be
constructed as per D G Khan Dajal Canal System. - Dispersion Structures would facilitate in the
irrigation of additional area of about 80,000 HA. - Provision may be made for Channelization of water
along the right-bank through embankments
constructed water course crossing Pipelines.
22STUDIES PLANNED TO BE CARRIED OUT BY CONSULTANTS
- Frequency analysis of flood flows of
nallahs/rivers at darrah(s) and at canal
drainage structures. - Study the adequacy of existing cross draining
structures on DG khan system in the light of
frequency analysis. - Remodeling of existing cross drainage structures
if inadequate and additional structures if
required on DG Khan canal / Dajal Branch. - Consultants should advise for alternative
strategies to irrigate Pachad area in lieu of
proposed construction of 400 water course
crossings on Kachhi Canal - Consultants will probe that after construction of
dispersion structures the flood peak will be
reduced in accordance with the existing capacity
of cross drainage structures on DG Khan system. - Consultancy proposal for flood management of hill
torrents originating from Suleiman Range and
Marri Bugti hills from Taunsa Barrage to tail of
Kachhi Canal. - Revision of PC-I to accomodate hill torrent works
in Punjab Balochistan Provinces.
23THANKS