MANAGEMENT OF HILL TORRENTS
  • Management of hill torrents crossing the Kachhi
    Canal to reduce the peak flows to safeguard the
    canal and to increase the agricultural production
    in Pachad Area
  • Review alternatives to
  • Adopt hill torrent management to reduce the peaks
    or
  • Remodel existing X-Drainage / Hill Torrent
    Structures of D.G. Khan Canal and Dajal Branch
    from RD 0 to RD 531 as per criteria to be adopted
    for Kachhi Canal
  • Review various modern alternatives for hill
    torrent management

2
(No Transcript)
3
D.G.Khan Hill Torrents
4
MAP OF KAHA HILL TORRENT
5
GENERAL TYPES OF STRUCTURES FOR MANAGEMENT OF
HILL TORRENT
  • Storage Dams
  • Delay Action Dams
  • Check Dams
  • Flood Distributors
  • Dispersion Structures
  • Diversion Dykes
  • Cross Dykes
  • Flood Irrigation Channels
  • Flood Disposal Channels

6
KAHA HILLTORRENT
7
SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN
BALOCHISTAN
8
SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN
PACHAD AREA- PUNJAB
Cost of Schemes RS 130 Million Potential Area
36,253 HA
9
MAP SHOWING MANAGEMENT WORKS ON KAHA HILL TORRENT
IN PUNJAB
10
PROJECT IMPACTFLOOD PEAK EVENTS/INUNDATION
PRE-PROJECT
  • YEAR 1973
  • FLOOD PEAK 56,000 CFS (1,586 CMS)
  • BREACHES - DAJAL BRANCH 148 Nos.
  • DISTYS. DAMAGED
  • - NAUSHERA
  • - ZAMZAM
  • - ISLAM
  • - ABE-HAYAT
  • AREA INUNDATED 45,000 ACRES (18,220 HA)

POST-PROJECT
  • YEAR 2003
  • FIRST PEAK 2ND JULY, 2003 60,000 CFS (1,700
    CMS)
  • SECOND PEAK 10TH JULY, 2003 60,000 CFS (1,700
    CMS)
  • THIRD PEAK 14TH JULY, 2003 51,900 CFS (1,470
    CMS)
  • BREACHES 5 No - Relief Cuts
  • DISCHARGE AT CANAL CROSSINGS 9,000 CFS
  • AREA INUNDATED NOMINAL

11
PRE POST-PROJECT ATTENUATION OF FLOOD PEAKSFOR
KAHA HILL TORRENT
Discharge - CFS
12
CROPPING PATTERN AND INTENSITIES UNDER PRE AND
POST PROJECT CONDITIONS
CCA 36,253 HA
13
PROPOSED AND ACTUALLY BENEFITED AREAS
AGAINST VARIOUS PEAK FLOODS
CCA 36,253 HA
14
COMPARISON OF ECONOMIC INDICATORS
15
FUTURE STRUCTURAL IMPROVEMENTS
  • PROP WALL CONSTRUCTED UNDER THE CREST ON D/S
    SHOULD BE PLACED UPSTREAM UPTO CREST LEVEL TO
    ENSURE
  • Uniform flow
  • Check washing of fines
  • Safety Against Scour
  • ORDER OF CONSTRUCTION
  • Construction must start from Darrah to down stream
  • DEGREE OF PROTECTION
  • Down stream works need more protection as
    compared to the upper ones
  • STRCTURAL IMPROVEMENTS
  • Upper end of Salai should be semi circular
    instead of rectangular
  • Terminal end should be similar to that of guide
    bund
  • Off-take should be located 10 H above the cross
    structure
  • For H instead of drop falls

16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
COST OF STRUCTURAL INTERVENTIONS
20
FINDINGS CONCLUSIONS
  • Efficacy of existing cross-drainage structures on
    DG Khan Dajal branch be evaluated.
  • Flood peak attenuation at cross-drainage
    structures through dispersion structures is
    significant.
  • Suggested improvement in the design of structural
    interventions be taken into account in future
    hill torrent projects.
  • In spite of shortcoming in design, diversion of
    flood flows in Pachad area has been reasonable
    during post-project environments.
  • Construction of dispersion structures in Pachad
    area is technically and socially more attractive
    than disposal of flows into Indus River.
  • Ensure the availability of funds for OM at
    proper time.
  • Existing future users of canal water on the
    right bank through lift pumps be duly considered
    for planning design of Kachhi Canal.

21
RECOMMENDATIONS
  • Dispersion Structures in Pachad Area on Sori-
    Lund, Sakhi Sarwar,Vidore, Chachar, Zangi Shori
    Janubi and Flood Carrying Channels in Command
    Area be constructed.
  • Carrying Channels leading to Indus River for
    Pitock and Shori Shumali be constructed.
  • Cross drainage Structures on Kachhi Canal be
    constructed as per D G Khan Dajal Canal System.
  • Dispersion Structures would facilitate in the
    irrigation of additional area of about 80,000 HA.
  • Provision may be made for Channelization of water
    along the right-bank through embankments
    constructed water course crossing Pipelines.

22
STUDIES PLANNED TO BE CARRIED OUT BY CONSULTANTS
  • Frequency analysis of flood flows of
    nallahs/rivers at darrah(s) and at canal
    drainage structures.
  • Study the adequacy of existing cross draining
    structures on DG khan system in the light of
    frequency analysis.
  • Remodeling of existing cross drainage structures
    if inadequate and additional structures if
    required on DG Khan canal / Dajal Branch.
  • Consultants should advise for alternative
    strategies to irrigate Pachad area in lieu of
    proposed construction of 400 water course
    crossings on Kachhi Canal
  • Consultants will probe that after construction of
    dispersion structures the flood peak will be
    reduced in accordance with the existing capacity
    of cross drainage structures on DG Khan system.
  • Consultancy proposal for flood management of hill
    torrents originating from Suleiman Range and
    Marri Bugti hills from Taunsa Barrage to tail of
    Kachhi Canal.
  • Revision of PC-I to accomodate hill torrent works
    in Punjab Balochistan Provinces.

23
THANKS
Write a Comment
User Comments (0)
About PowerShow.com