Title: GREEN FUEL
1- GREEN FUEL
- ON
- INDIAN RAILWAYS
2 Diesel operations on Indian Railways
- Indian Railways operate around 4000 Diesel
Locomotives. - Approx two billion litres of diesel fuel is
consumed annually. - The annual expenditure on diesel fuel is approx
Rs. 5000 crores (_at_Rs.25.00)
3Why Bio-diesel for Indian Railways Locomotives?
Thus if B20 blend is used by IR, then 400 million
liters of petro diesel shall be saved.
4Bio Diesel - Areas of Activity
51. PLANTATION
6Policy
- Honble MR had announced in Budget speech
2003-04 that Indian Railways will take up
Jatropha Plantation on a massive scale.
7Indian Railways signs MOU with M/s IOC
- MOU signed with IOC in the year 2003 for the
plantation of Jatropha Carcus, extraction of oil
and its processing. - IR shall lease 500 hectare of Railway land to M/s
IOC for a period of 15 years. - IOC will offer the processed and blended mix,
ready for use to Indian Railways at a price to be
determined by both the parties.
8Implementation of MoU
- 81 ha land identified in Surendra Nagar, district
in Gujrat Area - Than-Chotila - Tender awarded by IOC to M/s Global Agri Systems,
Delhi and work started in March 2004. - 1,75000 saplings of Jatropha planted.
- M/s Venus Ethoxy Ether, Goa, authorised to
produce Bio-Diesel from the above plantation
9Plantation at Surendra Nagar, Gujrat
10Plantation at Surendra Nagar, Gujrat
11Follow-up Action By Indian Railways
- Zonal Railways were directed to draw action plan
for - Planting Jatropha along the track
departmentally/contractually - Taking up at least one site on commercial
plantation basis. - Jatropha plantation was declared a Mission Item
in 2003-04.
12Jatropha Plantation on Railway Land
13Models for Growth of Jatropha
- Grown departmentally/contractually and then
auction the plantation for seeds collection
including maintenance in a block of 3/5 years. - OR
- Enter into a joint venture with the party for
15 yrs who offer highest minimum guarantee money
with the revenue sharing of 5050 on produce. No
expenditure by Railways.
14Models for Growth of Jatropha
- The ownership of the land with the Railways
- Award of contract on the basis of the
highest bidder for a Minimum Guaranteed Amount
payable to Rly in installments. - Gross revenue from the sale of plantation to
be shared in 5050 - Proceeds from sale of vegetables, flowers,
crops as inter-cropping will go to Partys
account
152. PROCESSING
16Transesterification Plant at Perambur S. Rly.
- S. Railway has set up a 350 Lts / day Pilot Plant
at Perumbur in 2003. - Capacity augmented to 1000 Lts / Day in 2005.
- In-house seed crushing unit of capacity 125 Kg /
Hr.
17LABORATORY TRIALS AT LOCO WORKS, PERAMBUR
- The manufacture of Bio-diesel has been tried with
the following oils.
1. Pongamia penata 2. Jatropha 3.
Neem Oil 4. Soya bean oil 5. Used cooking
oil
18Bio-Diesel Pilot Plant
19Bio-Diesel Pilot Plant
20Bio-Diesel Pilot Plant
21Proposed Transesterification Plants
Proposed Plants in each zonal Railway
- Short term - Experimental trans-esterification
plant of 2000 L / day capacity. - Medium term - 20KL / day capacity plant.
223. R D
23- STUDIES ON BIODIESEL
- FOR
- ALCO 251 LOCOMOTIVE
- ENGINES
- By R.D.S.O.
24Test facility in RDSO
3100 hp engine at RDSO
- State of the art AVL Test Commander
- High Speed Data Acquisition System to capture on
line data.
25Preliminary Testing
- Initial testing done on engine test bed at RDSO
in Nov 2002. - Bio-Diesel provided by IOC.
- Blends of 5, 10 20 tested.
26TESTING IN RDSO Nov. 2002
- Conclusions
- Full power output obtained with bio-diesel.
- SFC increases with increasing proportion of
Bio-diesel.
27 Detailed Testing - April - May 2004
- Bio diesel blends B10, B20, B50 B100 tested at
RDSO on 3100 hp Diesel Engine Test Bed - Limited emissions measurements also done.
- Optimization of engine attempted with 10
bio-diesel blend. - Various parameters of the engine monitored
viz.SFC, exhaust gas temp. firing pressure
28Major Engine Performance Parameters
29 Observations
- With the increasing proportion of bio-diesel
- Full horsepower is maintained.
- Upward trend in SFC - 12.5 increase with B100
- Downward trend in exhaust gas temperature.
- No significant change in firing pressure.
30Emission Results
31Effect of Biodiesel on Emissions
- Nox goes down by 11 for B10, but increases by 5
for B100. - Hydrocarbons reduce by 54 for B100.
- CO2 reduces by 5 for B20
32Optimization of the Engine
33Findings
- No change in power for various blends.
- B10 blend quite comparable in SFC to petro diesel
with optimized injection timing, but with higher
peak firing pressures. - B10 biodiesel blends showed lower NOx reading.
- Decreasing trend of hydrocarbon emissions. 54
reduction with B100 as compared to petro diesel. - Decreasing trend in exhaust gas temperature.
- For the present, B-10 would be the ideal blending
ratio.
344. APPLICATIONS
35First Train on Bio Diesel Blend
- Delhi - Amritsar Shatabdi run on 31st December
2002 with 5 blend of Bio-Diesel. - Parameters monitored-
- Power
- Filters
- Fuel Injection Equipment
- Results
- No loss of hp, acceleration or any other problem
- No unusual deposits observed on fuel filters.
36Follow-Up Field Trials
- Field Trial done on Lucknow-Allahabad Jan
Shatabdi (2054/2053). - 5 round trips of the train made using B10 blend.
- Field trial successful in terms of haulage and
other performance characteristics.
37Long duration field trial of Bio-Diesel
- Extensive field Trial on 5 locomotives
- Trial Scheme and shed finalized (Alambagh
/N.Rly). - Storage and handling infrastructure ready.
- Order being placed for supply of 3000 Kl of B- 10
blend.
38Trials at Southern Railway
- 100 Bio-Diesel on Tata Sumo.
- 20 Bio-Diesel on Voyager.
- 5 Bio-Diesel on MG loco(YDM4-6225).
- 5 Bio-diesel two DEMU Units.
- 5 Bio-Diesel on WDM7 loco of TNP shed.
39Tata Sumo running on 100 Bio Diesel from May 2004
40MAHINDRA VOYAGER RUNNING ON 20 BIO DIESEL FROM
MAY 2004
41Meter gauge Locomotive running on 5 blend Bio
Diesel from July 2004
42DEMU RUNNING ON 5 BLEND BIO DIESEL FROM MARCH
2005
43DEMU RUNNING ON 5 BLEND BIO DIESEL FROM MARCH
2005
44 Technical Tasks Ahead
- Detailed study including sensitivity analysis.
- Optimization of combustion process and
minimization of NOx emissions. - Sustained field trials to ascertain the long term
impact of the fuel on - Fuel injection system and Filters, rubber
components - Deposits on pistons, valves, cylinder head
45 Vision For Indian Railway
- Large scale plantation of Jatropha Curcas on
surplus Railway land ( 4,30,000 Ha) - Setting up of Esterification plants
- Extensive field trials on HHP Locomotives
- Gradual switch over to use of B20 Bio-Diesel
through - a) In-house resources
- b) Procurement from market
46The final word
Indian Railways is committed to promoting the
usage of bio-diesel by cultivation of jatropha
plants and its application on Railways
locomotives.
47THANK YOU
48Plantation of Jatropha Curcas Kharagpur
Division-(S.E. Railway)
- 4.21 lakh saplings planted on Kharagpur division
during 2004-05. Biggest plantation of its type on
Railway land. - 7 lakh saplings planted during current year.
- 3 lakhs more saplings planned for the current
year. - Another one million planned in the next two
years. - Liaison with Forest department neighboring
State Govts.undertaking massive plantation
maintained. - Chattisgarh has, eg. planned plantation of 80
million Jatropha Curcas saplings next year.
49Jatropha Plantation at KGP
50Plantation of Jatropha Curcas Kharagpur
Division-(S.E. Railway)
- 4.21 lakh saplings planted on Kharagpur division
during 2004-05. Biggest plantation of its type on
Railway land. - 7 lakh saplings planted during current year.
- 3 lakhs more saplings planned for the current
year. - Another one million planned in the next two
years. - Liaison with Forest department neighboring
State Govts.undertaking massive plantation
maintained. - Chattisgarh has, eg. planned plantation of 80
million Jatropha Curcas saplings next year.
51Jatropha Plantation at KGP
52Transesterification Plant at Kharagpur
Proposed Plant at Kharagpur
- Short term - Experimental trans-esterification
plant of 2000 L / day capacity. - Medium term - 20KL / day capacity plant.