Title: Run II Upgrades Status February 2006


1
Run II Upgrades Status February 2006
2
Outline
  • Technical Progress Mike Martens
  • AP2, DB Studies
  • Daves talk (Congrats on the stacking record!)
  • Recycler Record Stash of 436E20 (2/14/06)
  • Run II Upgrade Status
  • Run II Upgrade Shutdown Work
  • Technical Progress
  • Project De-scoping
  • Status for January 06 Jeff Sims

3
Run II Upgrade Project Status
  • Shift in emphasis for Run II Upgrade Project
  • Started almost 3 years ago!
  • Project is 85 complete
  • Jeff Sims is now the Run II Project Manager
  • Most projects completed or nearing completion
  • Some remaining projects maybe not needed will be
    de-scoped
  • Stacktail Cooling Upgrades
  • Debuncher Vertical Band 4 Aperture improvements
  • Pbar Target Sweeping
  • Hope to close the project books by end of FY 06
  • but work on Run II continues
  • Some of the work naturally continues within
    machine depts
  • De-scoped projects can return if needed

4
Run II Upgrade Shutdown Work
  • Tevatron Separators
  • Replace 3 separators at A49 ? Allow for higher
    voltage
  • Install two new separators ? Allow for larger
    helix
  • Install TEL-2 at A0
  • Tevatron Alignment
  • Re-shim the remaining dipoles
  • Unroll quad (with 10 mrad roll) at D17
  • Tev Chromatic Compensation
  • Rewire Sextupole circuits
  • Corrects the chromatic beta function error
  • Necessary to run near ½ integer
  • Rapid Transfers
  • Install Hall probes
  • Repair some beamline BPMS with noisy channels
  • Install New Pbar Target
  • Main Injector BPMs
  • MI and Tev BLM installation

5
Technical Progress
  • Li Lens
  • One each of PT-1 and PT-2 lenses will be filled
    and the PT-2 will be tested on the test stand.
    PT-2 should be ready for beam in June.
  • Rapid Transfers
  • Many elements of the upgrade are in place
    (ramping power supplies, BPMs) providing benefits
    to operations in various modes
  • Transfers without reverse proton tune-up tried
    many times last week with good results

6
Technical Progress (Contd.)
  • MI BPM upgrade
  • Most of the hardware designed, ordered or
    delivered
  • First house installed in MI40 now commissioning
  • Full upgrade during and immediately after
    shutdown
  • BLM upgrades
  • Prototype system running at MI60 for 3 months,
    with PC instead of local control card. Control
    card software under test
  • Production to be completed by 4/15, a month of
    testing followed by installation

7
Technical Progress (Contd.)
  • OTR detectors
  • Installed in December
  • See first images

Transverse beam profile measurement from the
OTR One pass of beam at injection Is tilt from
optics? OTR alignment? Some noise introduced by
poor termination in tunnel
8
Technical Progress (Contd.)
  • IPM detectors
  • Some problem with vacuum at full B and E-field
  • See (very preliminary) first images

Transverse beam profile from the
IPM Turn-by-Turn profiles
9
Project De-scoping
  • Stacktail Cooling
  • Design work has been completed
  • Not needed unless significant gain in stack rate
  • Will Mothball project
  • Will decide in Summer 06 if needed.
  • Debuncher Vertical Band 4 Aperture
  • Design is completed
  • Not a significant gain in aperture
  • Eliminates lots of cryo, vacuum, and mechanical
    work during an already packed shutdown
  • Pbar Target Sweeping
  • Design and Hardware completed
  • Will focus on target improvements
  • If needed, the remaining work is mostly
    commissioning

10
Status
11
Initial PM Efforts
  • Working with Mike and Subproject Managers to
    understand the remaining Run II scope.
  • Deactivating 220 /- cost accounts
  • 60/- cost account remain active. We have
    obtained estimates on all remaining work.
  • Descoping Stacktail and Band 4 Cooling Tank
    Upgrade
  • Planning for Run II Closeout
  • All but three subprojects will be 100 complete
    by the end of FY06. The remainder are studies
    and commissioning related tasks and do not
    benefit from formal project management approach.
  • Any remaining Run II FY07 effort (MS or SWF)
    will be included in the appropriate AD department
    budgets for FY07
  • Compiling Responses to 2005 DOE review
    Recommendations.

12
Remaining Run II Work (1 of 3)
  • PBar and Target Sweeping - 1.1.2
  • Upgrades to Pbar Target 1.1.2.3
  • MI Upgrades 1.1.3
  • MI BPM System 1.1.3.2
  • MI-8 BPM Upgrades - 1.1.3.4
  • Rapid Response Team 1.1.6
  • Lithium Lens 1 and 2 1.2.1
  • AP2 and Debuncher Acceptance 1.2.2
  • AP2 Debuncher Survey and Alignment-1.2.2.2
  • Develop New Instrumentation 1.2.2.3 (goes into
    FY07)
  • Redesign/modify/rebuild/relocate elements
    -1.2.2.5 (may extend into FY07 if there are
    aperture restrictions)
  • Orbit Control 1.2.2.6
  • Develop model of AP2 Debuncher lattice-1.2.2.8
  • AP2 Debuncher Acceptance Beam Studies-1.2.2.9

13
Run II Remaining Work (2 of 3)
  • Rapid transfers 1.3.6
  • RT Software 1.3.6.3
  • Rapid Transfer Oscillation Feedback Control -
    1.3.6.4
  • Diagnostics 1.3.6.5
  • Additional Recycler Upgrades-1.3.7
  • Upgrade Transverse Dampers for Broadband-1.3.7.2
  • Additional E-Cool Upgrades -1.3.8
  • TEV Beam Studies Simulation -1.4.1
  • TEV Studies and Simulation Work-1.4.1.1 (extends
    into FY07)
  • TEV Active Beam-Beam Compensation-1.4.2
  • Tevatron Electron Lens- 1.4.2.1 (Tel2 extends
    into FY07)
  • Increased Helix Separation -1.4.3
  • New Helical Orbits 1.4.3.1
  • Separator Conditioning Testing-1.4.3.3
  • Install Spare Separators To Smooth Helix -1.4.3.4

14
Remaining Run II Work (3 of 3)
  • Chromatic Compensation- 1.4.4 New Scope
  • Tevatron Alignment 1.4.7
  • Tevatron On-line Level System 1.4.7.3
  • Smart Bolts 1.4.7.5 TD Only
  • Orbump Magnets 2.1.2 TD Only
  • Infrastructure Vulnerability 2.1.11 Recent
    220k req for spare 345kv Switchgear
  • BLM System Upgrade 2.2.4

15
Remaining Milestones
Scheduled for 2/21/06
Actually 2/27/06
Will have to bump out to early June
16
MS Spending through Jan. 06
17
Effort for Jan. 2006
18
Whats Next?
  • Schedule Review
  • Compare recent estimates to RLS
  • Prepare necessary CRs for descoping (Stacktail,
    Band 4 Cooling Tank Upgrade and FY07 transition
    to AD Departments)

19
Contingency
  • Contingency Needs
  • We understand there is 1.5 Mill remaining in the
    Directorate held contingency fund for Run II.
  • We do not plan to add new scope at this time.
  • Contingency may be needed for any subproject
    overruns in the next 6 months or so.
  • One Remaining Vulnerability is the 40 MW 345kv to
    13.8kv transformers at KRS/MSS. RLS has 0.
    Rough estimate is 1.1 million.