INDOT%20Height%20Modernization%20Project - PowerPoint PPT Presentation

About This Presentation
Title:

INDOT%20Height%20Modernization%20Project

Description:

INDOT Height Modernization Project Ryan C. Swingley, PLS Andrew D. Baxter, PLS What is Ht. Mod.? A National Oceanic and Atmospheric Administration Program Uses GPS ... – PowerPoint PPT presentation

Number of Views:81
Avg rating:3.0/5.0
Slides: 16
Provided by: JDu67
Learn more at: https://www.igic.org
Category:

less

Transcript and Presenter's Notes

Title: INDOT%20Height%20Modernization%20Project


1
INDOT Height Modernization Project
  • Ryan C. Swingley, PLS
  • Andrew D. Baxter, PLS

2
What is Ht. Mod.?
  • A National Oceanic and Atmospheric Administration
    Program
  • Uses GPS and other new technologies to improve
    elevation accuracy
  • Program Objectives
  • Improve Transportation by reducing design and
    construction costs
  • Accurate determination of floodplains
  • Study runoff amounts and effects
  • Improve agricultural yields
  • Manage coastal resources

3
Why is Ht. Mod. Needed?
  • 11575 National Spatial Reference System (NSRS)
    monuments
  • 10941 set between 1874 to 1979
  • Only 2514 monuments have been reported as
    recovered since 2000
  • These monuments are the foundation for all
    Geospatial Infrastructure, GIS, construction and
    development

4
Why is Ht. Mod. Needed?
  • National Geographic Vertical Datum of 1929
  • North American Vertical Datum of1988
  • INDOT mixed datums, sometimes unknown
  • These different datums cause potential harm to
    the public
  • Ht. Mod will create a densified and unified datum
    for the scientific, geospatial, construction and
    agricultural communities
  • NGS will implement a new vertical datum in 2021

5
Why is Ht. Mod. Needed?
  • Regions of Changing Height

6
Why is Ht. Mod. Needed?
  • New NGS datum will based solely on airborne
    gravitation measurements
  • Ht. Mod. will facilitate the current datum to be
    updated for 2021
  • Bring previous work (survey, construction, GIS)
    to be more accurately updated to 2021 datum

7
Indiana Ht. Mod. History
  • IGIC/ISPLS joint committee since 2006
  • Held a Ht. Mod. Forum in 2008
  • Implementation of the InCORS in 2009
  • Submitted an Indiana Ht. Mod. Plan to NOAA/NGS in
    2009
  • Joined the Great Lakes Region Ht. Mod. Consortium
    in 2010
  • INDOT Benchmark Inventory (2010)
  • Hamilton County Ht. Mod. Pilot Project in 2011
  • SPR Funds requested and granted in 2012

8
InCORS
  • 45 GNSS CORS

CORS eliminated 2 days of GPS obs.
9
InCORS
  • Registered Users           
  • Survey 664
  • Construction  121
  • GIS  81
  • AG 607
  • RTN Usage
  • 2012 average per day 134
  • 2013 seeing increase of 26 more users per day
  • 676 different companies using network

10
State-wide Ht. Mod. Project
  • Phase I
  • - Planning Phase
  • Recover existing 1st and 2nd order Benchmarks
  • 20 km spacing
  • GPS and bluebook using NGS TM 58 and 59

11
State-wide Ht. Mod. Project
  • Current Geoid 12a
  • Consists of 137 BM
  • Current number of BM
  • created several gaps
  • in 20 KM spacing

12
State-wide Ht. Mod. Project
13
State-wide Ht. Mod. Project
  • Phase I

District New Stations of Tie Points
LaPorte 15 60
Fort Wayne 10 40
Crawfordsville 10 40
Greenfield 10 40
Vincennes 25 100
Seymour 20 80
SUB-TOTAL 90 360
14
What is next?
  • Request more SPR Funds for Expansion
  • New INDOT standards for leveling benchmark
  • Expansion of network to more localized areas and
    project specific control
  • More Accurate elevations on existing CORS
  • 2 cm Geoid
  • Head start on 2021 vertical datum change

15
Questions?
  • Ryan C. Swingley, PLS
  • Seiler Instruments
  • rswingley_at_seilerinst.com
  • Dee Baxter, PLS
  • INDOT
  • abaxter_at_indot.in.gov
Write a Comment
User Comments (0)
About PowerShow.com