ATF to-do list - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

ATF to-do list

Description:

Board synchronisation: option 1. Use FONT5 + FONT5A boards. Run Doug s ATF 2-board DAQ. Observations: Empirically approximately synchronous. Readbacks not available ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 7
Provided by: linea3
Category:
Tags: atf | list

less

Transcript and Presenter's Notes

Title: ATF to-do list


1
ATF to-do list
  • N. Blaskovic, T. Bromwich G. Christian

N. Blaskovic
2
Contents
  • On-shift to-do list
  • Multi-board data synchronisation
  • Hardware and cable wish list

N. Blaskovic
3
To-do list
  • Introduce delay cables after cavity to see if
    static erratic feature changes
  • Diagnose IP BPM phase sensitivity
  • Vary incoming LO phase
  • Synchronously digitise bunch phase measured at
    stripline BPMs
  • Once available, do IPC beamline tests

N. Blaskovic
4
Board synchronisation option 1
  • Use FONT5 FONT5A boards
  • Run Dougs ATF 2-board DAQ
  • Observations
  • Empirically approximately synchronous
  • Readbacks not available for FONT5A board
  • SIS digitiser and ATF GUI not used

N. Blaskovic
5
Board synchronisation option 2
  • Use FONT5A board SIS digitiser
  • Run standalone DAQ for FONT5A board
  • Issue synchronisation signal upstream
  • Observations
  • Integrates SIS digitiser operation
  • Board synchronisation ensured
  • Requires synchronisation signal to be sent to the
    IP and readback issued to Epics (Doug?)
  • Requires ATF to save FONT Epics data

N. Blaskovic
6
Wish list
  • 2 ZPULs (to replace broken ones)
  • Mechanical LO phase shifter (slide 3)
  • BNC-BNC cables
  • 3 meter long
  • SMA-SMA cables
  • 3 meter long
  • Long cables to delay cavity signals (slide 3)
  • SMA-BNC connectors

N. Blaskovic
Write a Comment
User Comments (0)
About PowerShow.com