Summary of atf 2 wkshp - PowerPoint PPT Presentation

1 / 4
About This Presentation
Title:

Summary of atf 2 wkshp

Description:

... two fundamental monitors: IP BPM and IP BSM and other hardware & instrumentation. Study possibility to reuse existing hardware ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 5
Provided by: ser96
Category:
Tags: atf | summary | wkshp

less

Transcript and Presenter's Notes

Title: Summary of atf 2 wkshp


1
PAC05 abstract. The collaboration and the author
lists are open.
2
Two versions of optics. Possible layouts.
3
Schedule of the ATF2 Workshop, January 5, 2005
Welcome Accelerator facilities for ILC in TDR
era T.Raubenheimer Recent activities of
ILC-Asia working groups and schedule of ATF2 in
terms of ILC CDR, TDR and construction
K.Yokoya Overview of the ATF2 project at KEK
T. Tauchi Experience from FFTB
P.Tenenbaum FF optics design for ATF2 S.
Kuroda FF optics design for ILC ATF2
A.Seryi ATF2 optics, tolerances, tuning,
scaling to 1 TeV D.Angal-Kalinin FF optics
tracking cross-check M.Pivi ATF2 photon
collider laser facility J.Gronberg Performance
of the ATF extraction line K. Kubo Vertical
dispersion and coupling correction in extraction
line M.Woodley Kicker for ILC-like train
M.Ross BINP kicker design proposal
B.Grishanov, F.Podgorny (presented by A.Seryi) IP
nano-BPM for ATF IP, laserwire, and IP beam size
monitor Y. Honda Energy spectrometer cavity
BPMs S.Smith High resolution cavity BPM
design Z. Li Laser wire for ATF2 ILC, and
IP size monitor G.Blair IP beam size monitor
A.Brachmann Intra-train feedback, possible
active stabilization, alignment P.Burrows
Ground motion at the ATF and ATF2
T.Tauchi Discussion on quantification of ILC
risk reduction due to ATF2 and further
work Summary of ATF2 Workshop
4
Summary of ATF2 workshop
  • ATF2 is an important project for ILC
  • Continue ATF2 project development
  • Adopt ILC-like optics
  • Study BC smaller betaY variable L collim.
  • Improve extraction line, install sextupoles,
    continue study to decrease extracted beam
    emittance
  • Study consistency of all systems with goals A and
    B (e.g. fast ion inst)
  • Continue RD on two fundamental monitors IP BPM
    and IP BSM and other hardware instrumentation
  • Study possibility to reuse existing hardware
  • Plan possible contributions from collaborating
    labs and institutes

http//www-conf.slac.stanford.edu/mdi/ATF2.htm
Write a Comment
User Comments (0)
About PowerShow.com