Title: Experimental Facilities Planning


1
Experimental Facilities Planning
John Arthur LCLS Photon Systems Manager
Near term schedule XFD within the LCLS
organization XFD scope XFD priorities
2
LCLS Installation and Commissioning Time-Line
X-ray Systems
First Light in FEH
Install Undulators
LTU/Und Install
X-Rays in NEH
First Light in FEE
CD-4 (7/31/2010)
FEE/NEH Install
FEH Hutch BO
now
J
F
M
A
M
J
J
A
S
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
O
N
A
M
D
D
2008
2009 2010
Down
Down?
PPS
Operations
LTU/Und Comm.
NEH Ops Commissioning
Linac/BC2 Commissioning
Re-establish e- to SL2
FEL/FEE Commissioning
Nov. 3, 2008
3
FY2009 details
  • Now-March 2009
  • Install FEE components, FEE PPS, NEH PPS
  • March/April 2009
  • FEE/NEH safety review, PPS certification
  • May 2009
  • First light to FEE
  • May-June 2009
  • Install AMO instrument in NEH Hutch 1
  • July 2009
  • AMO instrument readiness review
  • First light to NEH (Hutch 1 only)
  • September 2009
  • First LCLS User operation with AMO instrument

4
LCLS X-ray operations plan
500-700 hrs in FY09, with 1 instrument (month of
Sept 2009) 4000 hrs in FY10, with 2-3 instruments
(Oct-Dec 2009, Mar-Sept? 2010) 5000 hrs/yr by
FY14, with 6 instruments X-ray operations
scheduled in blocks of a few months or more, with
periodic (every 2 weeks?) brief (2 days?)
interruptions for machine studies Typical
experiment will last for about 2 weeks
5
LCLS organization
LCLS Director Dale Knutson
Accelerator Systems Div John Seeman operate
accelerator for science
Experimental Facilities Div Jochen
Schneider operate instruments for science
Business Div Cindy Lowe
Engineering Physics Div David Schultz
Strategic Projects Div John Galayda
LCLS Construction
LUSI
6
ASD responsibility
Undulator Hall
XFD responsibility
Near Experimental Hall
Shield wall between Electron Dump and FEE
Far Experimental Hall
7
Experimental Facilities Division Tasks
  • Manage safe operations in LCLS experimental areas
  • Manage LCLS user program
  • Maintain and upgrade X-ray instrumentation
  • Enable good user science initiate in-house
    research

8
The LCLS X-ray Beamline
X-ray transport tunnel
Far Experimental Hall
Hutch 1 AMO Instrument
Near Experimental Hall
Front End Enclosure
9
Diagnostics and Offset Mirrors in the FEE
Solid Attenuators
Gas Attenuator
Thermal Sensor
Beam Direction
Slit
Gas Detectors
K-Mono
5 mm collimator
Direct Imager (Scintillator)
FEL Offset Mirror Systems
10
LCLS Offset Mirror Systems
800-2000 eV to Hutch 1
HOMS Hard x-ray Offset Mirror System
SOMS Soft x-ray Offset Mirror System
insertable
800-2000 eV to Hutch 2
insertable
2000-25000 eV to Hutch 3-6
11
AMO Instrument
Optimized for studying the interactions between
FEL X-ray pulses and simple samples atoms,
molecules, clusters
beam
12
Other LCLS instruments
  • SXR Soft X-ray FEL studies of condensed matter
    (dynamics of phase transitions, imaging of
    nanoparticles)
  • XPP Hard X-ray scattering studies of
    laser-excited states
  • XCS Hard X-ray coherent scattering studies of
    dynamics
  • CXI Flash imaging of nanoparticles and molecules
  • MEE Studies of materials in extreme environments
    (high temperature, pressure)

13
LCLS User Program
  • Goal safe, efficient operation promoting the
    best science
  • LCLS will be a DOE-BES User Facility
  • Access through proposal/review process
  • LCLS scientific staff frequently collaborate with
    users, also maintain independent research
    programs

14
Current XFD Priorities
  • Installation in FEE, Hutch 1
  • Begin User program
  • First proposals in, review underway
  • Seeking User program manager
  • Form Safety program
  • Working with ASD to form complementary structure
  • Seeking XFD Safety Officer
  • Augment scientific/support staff

15
Summary
  • XFD is a new department at SLAC, will run LCLS
    X-ray experimental facilities
  • XFD will be the interface between LCLS and the
    world user community
  • Will nurture creation of LCLS instruments, then
    manage them
  • Goal safe, efficient operation promoting the
    best science