Transcript and Presenter's Notes

Title: NuMI Beam line Power Supplies


1
NuMI Beam line Power Supplies
  • The supplies in the line is detailed
  • Main Ring Style..1
  • PEI/Transrex 500Kw.10
  • PEI 20Kw..10
  • PEI 240Kw..2
  • MI Correction elements...6

2
Transrex vs PEI 500Kw supplies
3
Rework
  • All of the PEI style power supplies have been
    modified and installed
  • Controls cables are installed in MI60 and MI62
    but final connection will completed after the
    data base is setup.

4
Series Regulation
  • The groups of supplies will be regulated by one
    current regulator.
  • Each supply will have an SCR Unit with a closed
    voltage loop, the same as the single supplies.
  • All the supplies act as if they are one.
  • The supplies will all receive the same voltage
    reference.
  • The P1 and A1 lines have this supply
    configuration in operations now.

5
Upgrades
  • Reused Main Ring SCR Unit.
  • Better Voltage control.
  • Maintenance techs have experience and knowledge.
  • Little or no down time due to these chassis.
  • Need new current loop added to the chassis.
  • Added a filtered voltage monitoring card to the
    chassis.
  • New Gate Firing circuits.
  • Two Quadrant operation. (Invert).
  • Remove Diodes in the Bypass and add SCRs.

6
Ramp Calculator
  • Each Load Will Use the Max P.S. Voltage.
  • Operation will have only one data point to
    adjust.
  • Same control as the P1,P2,P3 and A1 lines

7
Power Supply Controls
  • C468 Ramp Generators Current Reference.
  • Each magnet load will have one current reference.
  • Voltage reference feed forward created by P.S.
    reg.
  • L di/dt IR and Integrator

8
MI Regulation Improvements
  • The C468 cards DAC output has too much noise and
    drift.
  • We are installing a local DAC in the current
    regulation system to improve the noise.
  • The local DAC has better temperature drift
    numbers but is not in a better environment.
  • Additional improvement will be installed as
    needed.
  • Temperature regulation of the DAC.
  • Flattop correction for magnet temperature.
    (JITTER)
  • Low Beta/MI style Current regulator.
  • BmLB Learning system.

9
Series Power Supply Controls
  • The reuse of existing equipment requires a series
    connection of two or three supplies on each of
    three magnet loops.
  • The operations interface needs to be simple.
  • Look like only one supply to the operations
    crews.
  • Controlled turn on and off.
  • Access for maintenance needs to be simple.

10
Beam Loss Issues
  • The current regulation system has an absolute
    value circuit on the current error and will abort
    the beam in the MI if the supply is out of
    regulation.
  • For the more critical loads an independent window
    detector will not allow the beam to leave the MI
    if the current is not within the window at
    flattop time.
  • Two of the supplies have critical device
    controllers installed.

11
Present Status
  • All the PEI supplies are installed.
  • Five are installed at MI-60.
  • The HV101 loop has 3 supplies in series.
  • The Lam60 and V100 loops are single supplies. We
    expect to add filters later for improved
    regulation.
  • A Main Ring style supply is being installed at
    MI-62 for the V105 loop.
  • A single PEI is installed at MI-62 for the V110
    loop. A filter will also be added to this loop.
  • All the 20Kw quad loop power supplies are
    installed.

12
Present Status Continued.
  • The smaller 20Kw supplies have had simple
    modifications and installed in MI-60 and MI-62.
  • The digital status has been increased. This will
    read back to the MCR all things that trip the
    supply.
  • The MI ring uses this type of supply in the MI-8
    line and the supplies being installed in the NuMI
    line will be brought up to the same level of
    controls.

13
Pulsed Power Source
  • The MI-62 power panel and transformer has enough
    unused equipment for all the NuMI supplies being
    added as a result of the addition of the Main
    Ring supply for the V105 loop.
  • MI-60 has a new power panel installed but the
    1,500Kva pulsed duty transformer has not been
    installed.
  • All the line power and controls installations
    have been completed at both 60 and 62 with with
    the exception of the V105 supply. Civil
    construction needs to be completed before the
    transformer can be installed.
  • All load connections will require extended MI
    access.

14
Expected Completion of Supplies
  • The supplies in the MI-62 and MI-60 building
    should be completed Sept 2000. Assembly of the
    Main Ring supply cabinet has started but will not
    be able to be tested until the civil construction
    is complete.
  • All the controls can/will be tested. We have
    started the HV101 power supply controls testing.
  • The Voltage regulation system can be tested using
    a temporary load. The current regulation and
    filter testing will have to wait until the loads
    are connected.

15
NuMI Regulation Improvements
  • Any improvements to the MI beamline regulation
    system will be added to the NuMI line supplies.
  • The improved flattop regulation will be added
    after we have proven it in the MI lines.
  • Improved current feedback in terms of DCCTs will
    be added as needed for each loop.
  • The Low Beta/MI ring current regulation chassis
    will be added for even better current reference
    as needed.
  • The BmLB regulation system will be used only if
    necessary.