1L. Mansani mansani_at_nuc.ansaldo.it
Progress on EFIT Design
2EFIT Reactor Block
3EFIT SG Pump Group
EFIT Purification Unit
4Target Outside Diameter as a function of main
Target Parameters
Run Target Power MW Target HX OD mm N HX Tubes HX Tubes radial pitch mm Flow Rate kg/s Primary Coolant Temp. (in/out) C Target Coolant Temp. (in/out) C Pump Tube Speed m/s HX Tube Speed m/s HX Shell Speed m/s
1 11.2 861 1274 19 780 400/450 422/524 1 0.54 0.55
2 11.2 861 1274 19 850 400/450 424/518 1.13 0.58 0.55
3 11.2 899 1410 19 780 400/450 419/522 1 0.48 0.49
4 11.2 899 1410 19 850 400/450 421/515 1.13 0.53 0.49
5 11.2 871 1410 18 780 400/450 418/521 1 0.48 0.56
6 11.2 871 1410 18 850 400/450 420/514 1.13 0.53 0.56
7 8.4 747 902 19 700 400/450 428/514 0.93 0.68 0.58
5EFIT Windowless Target Heat Exchanger
800 MeV 20 mA Proton Beam Deposited Power in the
Target 11.2 MW
600 MeV 20 mA Proton Beam Deposited Power in the
Target 8.4 MW