Title: Limpopo Provincial Treasury


1
Limpopo Provincial Treasury
  • Presentation to the NCOP
  • 20 November 2006

2
Table of Contents
  • Conditional Grants spending as at 30 September
    2006
  • Observations on Conditional Grants
  • Capital Provincial Infrastructure Grant
    spending as at 30 September 2006
  • Observations on Capital Provincial
    Infrastructure Grant
  • Reasons for under spending

3
(No Transcript)
4
(No Transcript)
5
Observations
  • The capacity to spend has improved as department
    spent 11 more as compared to the same period of
    the previous financial year.
  • The area of concern is on the following Grants
  • Education
  • HIV/AIDS 24

6
Observations cont.
  • Health
  • NTSG 28
  • FPSG 37
  • Housing
  • IHHSD 31
  • Sport
  • MSRPP 17
  • Agriculture
  • CASP 28

7
Observations cont.
  • The following conditional grants shows a healthy
    spending trends
  • Education
  • FET 50
  • Health
  • Hospital Revitalization 57
  • Agriculture
  • Land Care Programme 50
  • The under spending clearly demonstrate that
    departments approved poor business plans or there
    is lack of capacity to implement programmes and
    projects

8
Corrective Action
  • All Conditional Grants business plans for 2007/8
    MTEF will be evaluated by treasury in
    consultation with departments to ensure that they
    are easy to implement and monitor

9
Infrastructure Expenditure Trends
10
Expenditure Sept 06
11
Expenditure Sept 06 incl. rollovers
12
Provincial Infrastructure Grant
13
Provincial Infrastructure Grant Incl.
adjustments
14
(No Transcript)
15
Observations
  • Expenditure has been slow to pick up across all
    sectors - the momentum is been slow to build up
    due to late project starting times (expenditure
    in subsequent months is affected)
  • Total expenditure at 39 (with 50 of the time
    gone) versus 28.7 for the same period last year
  • Spending on PIG is at 30 versus 23.8 for the
    same period last year
  • When rollovers and other adjustments are
    considered, picture changes for the worse
  • With total spending going down to 32 (2005/06
    24.9) and PIG to 23.1 (2005/06 23.0)

16
Observations
  • Spending on capital continues to be a challenge
  • Key hiccups identified are
  • Infrastructure planning (selection of the
    projects and business cases not done on time
    etc.)
  • Delay in the procurement processes
  • Delays to handover sites due to geo-tech
    assessment tests being performed just before
    construction as a result of poor planning
  • Departments not meeting their own cash flow by
    projections

17
Corrective action
  • Multi-year planning processes need to be
    strengthened within departments (to avoid
    procurement of projects in year of
    implementation)
  • Departments need to review their technical
    capacity requirements, i.e. staff
  • Close monitoring and imposition of heavy
    penalties on underperforming contractors

18
Corrective action cont.
  • Education
  • The department has procured the services of a
    short-term Technical Assistant to support
    infrastructure delivery in the department
  • The department has also advertised (June 06) for
    the services of an infrastructure operational
    support team (short-term). The bid was evaluated
    in October and an award will be made in due
    course.
  • Health Social Development
  • Close monitoring of implementing agents and
    contractors.
  • With hospital projects, these have been packaged
    in two lots to speed up delivery.
  • Established developers are being encouraged to
    form joint ventures with CIDB registered emerging
    contractors.

19
Corrective action cont.
  • Agriculture
  • A work scheduled was drawn up proposing for the
    service providers to do resource audit as well as
    drawing a Masterplan within 15 days on whose
    basis explicit permission would be given for
    final designs and actual physical implementation
    of projects. Again it took a long time for
    service providers to comply.
  • Due to the above problems, a decision was taken
    to break the Masterplans into implementable
    elements without compromising the quality and
    integrity of the whole project. Items such as
    soil and land surveys, enlargement and lining of
    leydams, repairing of bulk water conveyance
    systems and repair or replacement of pumps is now
    done separately.
  • The analysis of the unit costs submitted by
    Service Providers during tendering has been
    completed and one-to-one meetings have been
    arranged with Service Providers. Resolution of
    this matter will help expedite the submission of
    acceptable Bills of Quantity (BoQ) costs and
    speedy processing of invoices.

20
Corrective action cont.
  • Agriculture
  • An additional engineer from ARDC (state-owned
    entity within the department) has been drafted in
    to help with the processing of designs and
    related technical work.
  • The Bid Committee has ratified the appointment of
    the Construction Supervision Service Provider in
    yet another effort to expedite projects
    implementation

21
Corrective action cont.
  • Roads Transport
  • Proactive management of projects, e.g. shifting
    of funds to fast-moving multi-year projects that
    are already running when delays are encountered
    in new projects.
  • The projects are outsourced to the private sector
    with the Roads Agency doing project management.
    This enables the department to deliver much
    quicker, despite the legal challenges experienced
    this year which delayed project implementation,
    the department projects to spend all its budget.
  • The department has a very good project management
    capability within the Roads Agency.
  • In the prior financial year, some districts in
    the province experienced very heavy rains and
    this affected certain projects, this was also
    compounded with the fact that most of the big
    contracts were awarded in September. The
    department was still able to spend 95 of its
    budget.

22
Corrective action cont.
  • Infrastructure Delivery Improvement Programme
    (IDIP)
  • Phase II of IDIP has commenced (November 2006)
  • Two Technical Assistants (TAs) have been seconded
    to the departments of Public Works and Education
  • The TAs will help the departments streamline
    planning and delivery processes during the 12
    month Technical Assistance programme
  • This intervention is expected to have an impact
    on infrastructure expenditure and delivery in the
    medium to long-term as it seeks to address
    systemic shortcomings in departments
    infrastructure delivery mechanisms, e.g. planning
    processes, procurement planning, capacity issues,
    etc

23
Corrective action cont.
  • IDIP..
  • A TA will be deployed to the department of Health
    in the new year
  • The Department of Roads Transport enjoys
    limited support from a Technical Assistant
    stationed at National Treasury.
  • IDIP also seeks to institutionalize multi-year
    planning processes in departments to prevent
    planning, procurement and implementation being
    done in the same year - this inevitably leads
    delays. IDIP extends planning horizons of
    departments.
  • It is expected that once departments are fully
    aligned with IDIP principles (e.g. proactive
    multi-year planning), under-expenditure will be
    eliminated.

24
ENDTHANK YOU!!!
25
Conditional Grant reasons for under spending
26
Reasons for underspending provided by the
department
  • Education
  • HIV AIDS
  • Programmes and workshops are run and conducted
    only during school holidays thus hampering
    substantial progress as the same target group is
    trained on Revised National Curriculum Statement
    which is a national priority.
  • National School Nutrition Programme
  • There is always delays in submission of
    suppliers invoices and some of those submitted
    are erroneous and have to be referred back for
    rectification thus causing delays in processing
    payments.

27
Reasons for underspending provided by the
department--contd
  • Health
  • HIV and AIDS
  • Enormous exercise of verification and payment
    processes of 287 NGOs at R 12,5million per
    quarter
  • Delay in filling of vacant posts for which
    interviews were conducted. Recommended candidates
    had to serve notices at their previous
    workstations.
  • Delay in completion of fixed structures
    (Buildings/Containers) intended to increase
    working space.
  • 26 Buildings/Containers on construction. Payment
    progress certificates started in the second
    quarter.
  • Shortage of qualified medical personnel in posts
    earmarked for ARV and Step Down Facilities

28
Reasons for underspending provided by the
department--contd
  • Health
  • Forensic/Pathology Services.
  • Delay in delivery of purchased vehicles due to
    conversions required on same vehicles to suit
    mortuary specifications. These processes take
    longer than five months.
  • Phased/stepped purchases of 19 mortuary vehicles
    to the total amount of R 3,2 million for the year
    is in progress. At the end of the quarter
    purchases orders for 12 vehicles amounting of
    R2,6 million were issued.

29
Reasons for underspending provided by the
department--contd
  • Health
  • National Tertiary Services.
  • Shortage of qualified medical personnel in posts
    earmarked for Specialists at the Tertiary
    Hospital.
  • Delay in drawing of Specialists Medical
    Equipments due to lack of Specialists knowledge
    on type of equipments required for specific jobs.
    Overall amount involved is R 22 million, and list
    of equipments in question follows hereunder
  • - 2 Portable Ventilators , 2 Bispectral Index
    Systems, 4 Infusion pumps, 2 ICU Ventilators, 2
    fibre-optic and light source.
  • Delay in delivery of purchased equipments due to
    their extent of sophistication and buildings
    alterations needed on installation points. The
    statement is with regard to an amount of R7, 2
    million on orders as at the end of the quarter.
    Another amount of R 3 million worth of
    equipments could not be processed for payment at
    the Tertiary Hospital due to alterations needed
    to be made on the building.

30
Reasons for underspending provided by the
department--contd
  • Health
  • Health Professional Training and Development.
  • Delay encountered in recruitments and
    verifications for appointments of Specialists in
    Tertiary and Regional Hospitals.
  • Delay in delivery of purchased equipments due to
    their extent of sophistication and buildings
    alterations needed on installation points. This
    statement is with regard to the total amount of R
    2, 3 million committed on purchases orders placed
    by Regional/Provincial and the Tertiary
    Hospitals. Lists of break down of commitments on
    these orders include amongst others Anaesthetic
    Machines, Transport Incubators, Ventilator icu,
    Fluid warmers, x-ray machine, Craps, mobile x-ray
    units,
  • Training and development process that follows
    specific schedules with external service
    providers.
  • Sizable payments of bursaries for deserving
    students will be effected in January/February
    2007

31
Corrective measures
  • Appointment of staff done. Staff linked directly
    with the Conditional Grants to avoid delays in
    expenditure posting.
  • Suppliers are being contacted to provide invoices
    on completed work in order to allow a progressive
    payment that matches with the grants cash flow.
  • Follow ups are constantly made with Suppliers of
    Vehicles. First trench delivery is expected in
    the third quarter.
  • Specification process has been completed.
    Adjudication of Specialist Equipments Tender in
    progress. Purchases orders will be placed in the
    third quarter.
  • Department has entered into partnership with
    United Nations Volunteers in order to intensify
    staff recruitment programmes through its program,
    UNDP.

32
Reasons for underspending provided by the
department--contd
  • Local Government and Housing
  • Integrated Housing and Human Settlement
    Development
  • The under expenditure is mainly due to late
    submission of Geo-tech reports, late
    identification of development areas, internal
    project management capacity, shortage of building
    material (bricks), late submission of beneficiary
    forms by municipalities and late pronouncement of
    subsidy quantum.

33
Corrective measures
  • Engineers and contractors are closely monitored
    to ensure adherence to project implementation
    time table.
  • Creation of additional project management
    capacity, i.e. PMU establishment and hiring of
    more Project Managers.
  • The department use trilateral agreement to
    purchase building materials for the Developers
    (Bricks).

34
Reasons for underspending provided by the
department--contd
  • Agriculture
  • CASP
  • The underspending resulted from building of
    crush pens, auction pens, dipping tanks, piggery
    houses, and holding pens which require more than
    a month to be completed.

35
Corrective measures
  • Due to the above problems, a decision was taken
    to break the Masterplans into implementable
    elements without compromising the quality and
    integrity of the whole project. Items such as
    soil and land surveys, enlargement and lining of
    leydams, repairing of bulk water conveyance
    systems and repair or replacement of pumps is now
    done separately.
  • Additional Capacity
  • Internal staff members have undergone training in
    Irrigation Design as well as Project Management
    during July /September 2006.
  • An additional engineer from ARDC has been drafted
    in to help with the processing of designs and
    related technical work.
  • Repriotization plans are in place to implement
    the Biofuels project for R6, 5mill in Sekhukhune.
    Reprioritization to pressing Land reform project
    of Tea Estates in Vhembe
  • Engineering Companies have been contracted under
    the RESIS program to support other programs on
    engineering related activities.
  • Project Management system - PS Next has been
    adopted acquired in September 2006 to improve on
    the Database and Reporting.
  • A shift from micro projects to clustering,
    massification and mega projects to improve on the
    resource use and impact visibility has been
    adopted. The numbers of projects are reduced in
    line with HR capacity to implement.
  • The department has also embarked on the project
    massification approach which will also speed the
    processes in term of bulk management and spending

36
Reasons for underspending provided by the
department--cont
  • Sport
  • Mass Sport and Recreation Participation Programme
  • Underspending as a result of delay in the
    advertisement and awarding of tender for sport
    equipment.

37
Corrective measures
  • The tendering process will be finalized in
    November and purchases will be done during the
    same month. Payments thereof will be done within
    the first two weeks of December 2006.

38
Capital and Infrastructure reasons for
underspending
39
Reasons for under-spending
  • Education
  • Late project starting times.
  • Schools under trees 95 total cost R102, 3M
  • 28 projects awarded and handover was delayed due
    to the completion of Geo-Tech assessments.
  • 16 projects under construction
  • Award of 15 projects was only finalised at the
    end of July 2006.

40
Reasons for under-spendingcontd
  • Education
  • Storm Damaged Schools 239 total cost R272M
  • Adjudication of bids for 70 projects was only
    finalised during the last week of June 2006.
  • Adjudication of bids for 67 projects was
    finalised during the second week of July 2006.
  • Bids for 2 x 8 schools advertised on the 15 July
    2006 and site hand over in August 2006.
  • Bids for 40 schools were advertised in the
    bulletin of 30 June 2006. Sites were handed over
    in August 2006.

41
Reasons for under-spendingcontd
  • Education
  • New Schools 3 total cost R47M
  • Contractors took sites in July 2006. surety

42
Reasons for under-spendingcontd
  • Roads Transport
  • The department undertakes new capital projects
    through the Roads Agency Limpopo (RAL), an agency
    within the department.
  • Late in the 2005/06 financial year, the agency
    was taken to court by bidders who challenged its
    procurement policies and awards for certain
    projects. This forced the agency to refine its
    procurement policies and procedures and awards in
    line with the court decision.
  • The projects that had been advertised in March
    2006 were withdrawn/cancelled to enable the legal
    department to incorporate the new guidelines into
    the advertisements to avoid further legal
    challenges.
  • The number of projects that had to be
    re-advertised is 52 projects with a value of
    R322, 5M.

43
Reasons for under-spendingcontd
  • Health Social Development
  • Late appointment of contractors which led to
    projects starting late.
  • Clinic Upgrade Programme 20 2006 - 2007
    total cost R49, 6M
  • Bids for 10 clinic projects were advertised on 30
    June 2006 and handed over in August 2006.
  • Bids for 6 projects were advertised on the 15
    July 2006 and sites handed over in August 2006.

44
Reasons for under-spending cont.
  • Health Social Development
  • Mortuaries
  • Site handed over for Tshilidzini project on 3rd
    July 2006 cost R7, 6M.

45
Reasons for under-spending cont.
  • Agriculture
  • Revitalisation of Smallholder Irrigation Schemes
    (RESIS) total cost R170M
  • R70 mil was budgeted for bulk infrastructure
    services at various schemes. R100 mil was
    budgeted for installation of infield
    infrastructure. The plan envisaged the
    appointment of Turnkey Service Providers by 1st
    April 2006 to perform work on 57 schemes some of
    whom were work carried over from 2005.
  • Due to the experience of 2005 where-in it was
    found that Service Providers were using dubious
    prices and unacceptable mark-ups, it was decided
    to include the provision of pre-approved unit
    prices by prospective bidders during the
    tendering stage. It took a longer time for
    bidders to comply with this requirement as it
    negatively impacted on their profit margins.

46
Reasons for under-spending cont.
  • Agriculture
  • Because of the new tender process as explained,
    service providers were only officially appointed
    at the end of June 2006.
  • Tenders for poultry houses were concluded and
    cancelled due to inability of the service
    provider to deliver.
  • Some delays are caused by the hesitation from
    others to take-over work previously done by other
    service providers whose contracts were terminated
    by LDA in 2005. These service providers site such
    issues as professional liabilities for integrity
    of designs done by others, to lack of adequate
    information from previous reports, e.g. land
    surveys not being geo-referenced, etc

47
Reasons for under-spending cont.
  • Local Govt. Housing
  • Review of all service providers contracts led to
    delays in projects starting times

48
Reasons for under-spending cont.
  • Public Works
  • R 1 million for land development has not been
    spent. Tenders for the development of landscaping
    projects closed on 10th July 2006 and they are at
    adjudication stage. Expenditure is expected to
    start in October 2006.
  • An amount of R3, 5 million for the refurbishment
    of the Parliamentary village was not spent
    because the projects are at tendering stage.
    Expenditure is expected to start in October 2006.
  • Other projects linked to the construction of 11
    MECs houses amounting to R2, 369 million, were
    started in July 2006, and planning design of
    the relocation of Legislature to Polokwane is
    still continuing.
  • Construction of 11 MEC houses only started in May
    2006 with the first claim for the project
    submitted at the end of June 2006 for payment.