AIM - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

AIM

Description:

Title: PowerPoint Presentation Last modified by: eric.helfers Created Date: 1/1/1601 12:00:00 AM Document presentation format: On-screen Show Other titles – PowerPoint PPT presentation

Number of Views:184
Avg rating:3.0/5.0
Slides: 32
Provided by: faaGov
Category:

less

Transcript and Presenter's Notes

Title: AIM


1
AIM SAA and AGIS
Net-Centric Demos
Navin Vembar Kevin Lew Joe Norton
May 26th, 2010
2
SAA Modernization
  • Net-centric TIM
  • Kevin Lew
  • AIM
  • May 26, 2010

3
Content
  • Introduction to SAAs
  • Overview of the SAA System
  • Approach
  • Lessons Learned
  • Next Steps

3/29/2016
4
Introduction to Special Activity Airspaces (SAAs)
  • Special Use Airspace (SUA)
  • Airspace in which activities must be confined or
    limitations may be imposed on aircraft, generally
    below en route airspace
  • Air Traffic Controlled Assigned Airspace (ATCAA)
  • En Route airspace analogous to SUAs
  • SAAs may depend on many other features
  • NAVAIDs, airports, runways, cities, other
    airspaces, geographic features or arbitrary points

5
Goals for the SAA Project
  • Define SUAs and ATCAAs in a consistent manner
    using an editing tool
  • Use a Service Oriented Architecture (SOA) to
    distribute that data to interested users
  • Manage the schedule and status of those airspaces
    through a SOA

3/29/2016
6
The Creator/Editor Tool
  • Allow a user to create and modify SAAs
  • SAAs defined using AIXM 5.0

3/29/2016
7
The Creator/Editor Tool
  • Carson MOA, NV
  • Boundaries. Beginning at lat. 4006'00"N., long.
    11757'33"W. to lat. 4006'00"N., long.
  • 11815'04"W. to lat. 3957'00"N., long.
    11838'04"W. to lat. 3951'00"N., long.
  • 11838'04"W. to lat. 4001'00"N., long.
    11815'04"W. thence to the point of beginning.
  • Altitudes. 500 feet AGL to but not including
    FL180.
  • Times of use. 0715-2330 daily other times by
    NOTAM.
  • Controlling agency. FAA, Oakland ARTCC.
  • Using Agency. U.S. Navy, Commander, Naval Strike
    and Air Warfare Center, NAS, Fallon, NV.
  • Generate the SUA 7400.8 legal definition from the
    AIXM definition

3/29/2016
8
The Creator/Editor Tool
  • Using Lucy and LuciadMap v9
  • This version has an extension to support for AIXM
    5.0
  • Users of the first release are NFDC

3/29/2016
9
Static Repository
  • Stores the static definitions of SAAs in AIXM 5.0
  • Notifies subscribers of new SAAs created and old
    SAAs updated
  • JMS pub/sub services
  • Provides the SAA definitions to users
  • SOAP request/response web services

3/29/2016
10
Operational Repository
  • Accepts schedule requests and airspace status
    changes
  • SOAP request/response web services
  • Distributes schedule and airspace status updates
  • JMS pub/sub services

3/29/2016
11
SAA Project Web Services
3/29/2016
12
Benefits
  • One definitive source for SUA definitions
  • Currently there are multiple digital definitions
    for SUAs and none accurately represent the
    complete SUA legal definition
  • The AIXM definition of the SUA generates the
    legal definition
  • Provide an accurate picture of SAA utilization

3/29/2016
13
SWIM Integration
  • The SAA project is an FAA System Wide Information
    Management (SWIM) implementing program.
  • SWIM implementing programs use Progress FUSE
    products for their SOA infrastructure
  • ESB (based on Apache ServiceMix)
  • Message Broker (based on Apache ActiveMQ)
  • Services Framework (based on Apache CXF)
  • Mediation Router (based on Apache Camel)
  • Able to implement AIXM 5.0 services with FUSE ESB
    4.2

3/29/2016
14
Next Steps for the SAA Project
  • Deploy the system this year
  • Add support for AIXM 5.1 for the second release
  • Have the Editor adopted earlier in the workflow
    of designing SAAs
  • Military use of the Editor to define SUAs
  • Implement the Review and Comment System for the
    back and forth dialogue and approvals of SAAs

3/29/2016
15
Next Steps for the SAA Project
  • Expand the consumers of the Operational
    Repository service
  • The Air Forces Central Scheduling Enterprise
    (CSE)
  • Airlines
  • En Route Automation Modernization (ERAM)
  • Federal NOTAM System (FNS)
  • Add other types of airspace in future releases
  • Altitude Reservations (AltRevs)
  • Temporary Flight Restrictions (TFR)
  • Use Airports GIS for Airport data used in SAAs

3/29/2016
16
AIXM Operational Perspectives
  • Airports GIS (AGIS)

2010 AIXM/WXXM Conference Joseph Norton,
CNA March 29, 2016
17
Airports GIS (AGIS)
  • Objectives
  • Create a single integrated web application for
    the collection of survey data
  • Establish guidance and standards for airport
    survey data collection
  • Promote productivity and fiscal responsibility
  • Improve existing programs data-centric support
    for and production of digital products
  • Deliver static airport information through
    enterprise services

18
A Collaborative Partnership
  • Air Traffic Organization (ATO)
  • System engineering
  • Data management, processing, and distribution
  • Office of Airports (ARP)
  • Airport data collection and standards
  • Airport design, equipment, and operational
    standards
  • Certification and inspection of air carrier
    airports
  • National Geodetic Survey
  • Inter-agency agreement to perform Independent
    Validation Verification (IVV)

19
Supporting NextGen Objectives
  • Provide SWIM-compliant digital enterprise
    aeronautical information services to support
    shared situational awareness
  • NextGen operational improvements
  • Provide secure on-demand airport and constraint
    information
  • Provide consistent and managed airport data to
    airport users during airport operations
  • Surface situation information
  • Low visibility surface operations
  • Improve runway safety awareness for pilots and
    controllers
  • Surface traffic management
  • Improved management of arrival/surface/departure
    flow operation

20
High-Level Operational Concept
Digital Products
Evaluate
Airport Survey Data AC 150/5300
AGIS
Deliver
Collect
Process
Static Airport Data
  • OE/AAA
  • SDAT
  • SAA
  • FNS
  • NFPO
  • SWIM
  • TFDM
  • ERAM
  • TMA/TBFM
  • TDDS
  • RTCA

AIM
Office of Airports
Airport Data Changes
21
Airports GIS (AGIS) System
  • Web application interface for survey data
    collection, GIS viewing, digital products, and
    airport data maintenance
  • SWIM compliant service interface based on OGC
    standards
  • Centralized database

22
Survey Data Collection
  • FAA Advisory Circulars 150/5300 Series
  • 16, Geodetic Control
  • 17, Imagery
  • 18, Survey Data Collection
  • Provide standardized data collection guidance and
    a common view of airport survey data
  • Current efforts to make data model more AIXM
    compliant
  • Current AGIS survey projects
  • 800 airport surveys
  • 37 completed surveys (13 new surveys, 24 existing
    surveys) (as of May 3, 2010)

23
Data Distribution using OGC Web Services
  • Data Layer
  • AIM database and external databases
  • Service Layer
  • Java-based GeoServer platform
  • Strictly adheres to OGC standards (e.g., WMS,
    WFS, WCS, KML)
  • Data Users
  • Data consumers/producers
  • Data stewardship
  • Custom adapters to support legacy systems

24
AIXM Web Services
  • Web Services
  • WSDL (Web Service Description Language)
  • REST (Representative State Transfer)
  • Currently, airport data is provided as AIXM 5.1
  • Approximately 800 airports National
    Geospatial-Intelligence Agency (NGA)
  • NASR data
  • Convert 3D to 2.5D
  • Simplified XLink internally refer to gmlid
  • In the future, airport data will be provided
    through WFS (WFS 2.0)
  • Survey data will be integrated with NGA baseline
    data

25
Support Tactical Airport Operations
  • Provide static airport configuration information
    to support operations in the Terminal and En
    Route environments
  • Airport/runway configurations
  • Taxiway routing
  • Airport base data for moving map displays
  • Airport Mapping Database (AMDB)

26
Integration with Industry
  • AMDB requirements
  • RTCA data link applications (DO-272)
    performance and operations
  • D-(Aerodrome) NOTAMs
  • D-Taxi
  • D-Traffic
  • D-Lighting
  • Aeronautical Radio, Incorporated (ARINC)
  • Airlines Electronic Engineering Committee (AEEC)

27
Integration with Federal NOTAM System (FNS)
Closure of TWY A between RWY 13/31 and Approach
RWY End 22 at ACY
28
Integration with Special Activity Airspace (SAA)
Design of an SAA around a VORTAC near GRB
29
Status Next Steps
  • Prototype OGC and AIXM web services
  • Demonstrate enterprise airport data services (End
    June 2010)
  • Deliver digital airport information to support
    situational awareness airport configuration
    (End September 2011)
  • Airport survey data collection
  • Support improvement of data standards, workflow,
    and automatic validation
  • Phase I (FY2009) Southwest Region 6 airports
    and ATL
  • Phase II (FY2010) Remaining Regions 30
    airports
  • Phase III (FY201025) Incremental projects
  • Electronic Airport Layout Plans (eALP)
  • Beta (CY1011) and Release (CY12)

30
Contact Information
  • Joseph Norton
  • Research Analyst
  • CNA Analysis Solutions
  • Aeronautical Information Management (AIM)
  • (202) 580-7497
  • Joseph.CTR.Norton_at_faa.gov
  • Airports GIS
  • Web Application http//airports-gis.faa.gov
  • Web Services https//agisdemo.faa.gov/airportsgi
    s/services

31
Summary
  • AGIS is a single access point for the collection
    of airport survey data continually working to
    improve workflow and data standards
  • AGIS uses a data-centric approach to support the
    aeronautical community
  • Support distribution of airport data using a
    standardized format ICAO and international
    standards AIXM and OGC web services
  • Provide static airport data to support dynamic
    operational environment of NextGen airport
    configuration, airport status, taxiway routing
  • Integrate with other FAA and AIM systems, and
    industry
Write a Comment
User Comments (0)
About PowerShow.com