Infiltration and Ventilation - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Infiltration and Ventilation

Description:

Infiltration and Ventilation Heat Loss Due to Infiltration Infiltration Btu H = (.018) x (ACH) x V x (Ti To) ACH = air exchanges per hour V = volume Ti ... – PowerPoint PPT presentation

Number of Views:294
Avg rating:3.0/5.0
Slides: 11
Provided by: mki62
Category:

less

Transcript and Presenter's Notes

Title: Infiltration and Ventilation


1
Infiltration and Ventilation
2
Heat Loss Due to Infiltration
  • Infiltration
  • Btu H (.018) x (ACH) x V x (Ti To)
  • ACH air exchanges per hour
  • V volume
  • Ti inside temperature
  • To outside temperature

3
Heat Loss Due to Infiltration
  • OR

4
Heat Loss Due to Infiltration
  • Infiltration
  • Using equation 2-11 page 34 and applied to
    Problem 2-1 page 41
  • Btu H 1.1 x CFM x (Ti To)
  • CFM (ACH x volume) / 60 min per hour

5
Heat Loss Due to Infiltration
  • Infiltration
  • Please Note
  • For tight construction use 0.5 for ACH.
  • For medium construction use .85 for ACH.
  • For loose construction use 1.3 for ACH.
  • For really bad construction use 2.0 for ACH
  • For the summer months (cooling) use 70 of the
    winter values.

6
Heat Gains Due to Infiltration
  • Latent Load
  • BtuH 4500 x (air exchanges x (volume) /60) x
  • (W Final W Initial)
  • (W Final W Initial) Difference Ratio Pounds
    of Moisture per dry air

7
Heat Loss Due to Ventilation
  • Ventilation
  • Btu H 1.1 x (Ra x square feet of building )
  • (number of people in the building x Rp )
  • x
  • (Ti To)

8
Heat Loss Due to Ventilation
  • Ventilation
  • Ra Area Outdoor Air Rate
  • Rp People Outdoor Air Rate
  • Example Pharmacy
  • Ra .18
  • Rp 5

9
Heat Loss Due to Ventilation
  • Ventilation
  • Btu H 1.1 x (.18 x 3,632) (30 x 5) x 76o
  • 67,214

10
Infiltration and Ventilation
  • I hope this clears the problem up!
  • Let us move on.
Write a Comment
User Comments (0)
About PowerShow.com