Title: Indoor Air
1Indoor Air Moisture Issues
2Indoor Pollutants
- Carbon monoxide (CO)
- Tobacco smoke
- Nitrogen oxides, hydrocarbon dust
- Volatile organic compounds (VOC)
- Radon
- Biological Particles (bacteria, , viruses, dust
mites, cockroaches, fungi, mold, raw sewage,
rotting wood) - Asbestos and Fiberglass
- Lead-based paints
- Water vapor
3Indoor Pollutants How will you deal with these?
- Lifestyle (pets outside, door mats, no shoes
indoors, regular cleaning) - Careful product purchase decisions (low VOC)
- Hard floor surfaces in lieu of carpeting
- Sealed combustion appliances (furnace, fireplace)
- House pressure balancing (jump ducts, transfer
grills) - Moisture management (humidity control)
- Ventilation
- Whole house
- Spot (bathrooms, kitchen, crawl spaces for radon)
- Air filtration
4Indoor Pollutants How will you deal with these?
5Indoor Pollutants How will you deal with these?
6Indoor Pollutants How will you deal with these?
7Indoor Pollutants
Efficiency at 0.3 Micron Particles
8(No Transcript)
9Moisture
- Moisture is the number one pollutant in homes
- Need to be aware of its sources
- Basic knowledge of determining moisture levels
- Solving moisture problems
10Dealing With Moisture
- Keep water out
- Roof, plumbing, grading of groundfix problems
- Understand that moisture will get in
- Ventilation is needed
- Make sure moisture can get out
- Material selection (vinyl wallpaper is a bad
choice)
BPI Analyst Certification Basic Principles of
Energy
11Moisture Movement Through Buildings
- Moisture in buildings can be tracked to one or
more of the following (in order of importance) - Liquid flow Roof leaks, plumbing leaks, ground
water - Capillary seepage Liquid water being pulled
into a material or assembly - Air movement Carrying water vapor into or out
of a building and its cavities - Vapor diffusion Vapor will move through solid
objects depending on the objects permeance and
the vapor pressure
12Controlling Moisture
- 1 inch of rain on 1,000 sq. ft. roof 623
gallons - High water table
- Foundation plants
- Leaking water spigot
13(No Transcript)
14Moisture Movement
- Vapor pressure Vapor pressure is created by
different amounts of water vapor in two different
air masses. Moves from high to low. - Relative humidity The percentage of the maximum
moisture that air can hold at a given temperature - The higher the temperature of the air, the more
moisture it can hold
BPI Analyst Certification Basic Principles of
Energy
15Relative Humidity
- Key point relative humidity (RH) changes as
temperature changes - When cooled enough, air at 50 RH, for example,
will hit 100 RH and the moisture in the air will
condense on cool surfaces - In the winter, warm indoor air is forced out of a
building - In the summer, hot humid air is pulled into an
air conditioned space. under this condition,
there is a potential for MOLD.
16Moisture Concepts
- Vapor pressure Vapor pressure is created by
different amounts of water vapor in two different
air masses. Moves from high to low.
17Materials Permeance
- The ability of a material to restrict moisture
flow is based on its perm rating - Materials with a perm rating of 1 or less are
considered a vapor retarder
18(No Transcript)
19Structural Design
- How a building fits together can give you hints
as to where there may be weaknesses - Shafts and Soffits (covered already)
- Slab/Crawlspace/Basement
- Framing
- Porches/Garages
- Bonus Rooms
- Stairs
- Split Levels
Understand how design features can cause
weaknesses vapor barrier
20Slab/crawlspace/basement
- Main concern vented crawlspace. If there is a
building component (wall, shaft) that is
connected to a vented crawlspace and vented
attic, high potential for problems.
Trend to build or retrofit to sealed crawlspaces.
21 Framing
- Balloon framing Found in older homes, may have
stud walls that are two stories high and usually
do not have top or bottom plates. This may
result in the wall being open to the
basements/crawlspaces and the attic.
22 Framing
- Platform framing, each floor serves as a platform
for the next floor. Has top and bottom plates.
23Porches/Garage
- Issue with multi-story structures Is there
insulation and an air barrier at the rim joist
that is hidden by the porch or garage?
24Bonus Rooms
25Split-Levels
26Moisture Concepts
- Diffusion vs. Air Movement
27A Primer on Air Flow
- For air to flow you need a hole and a pressure.
- No hole, no flow
- No pressure, no flow
28- If air is exhausted out of a building, outside
air must replace it - If you pull air into a building, inside air must
be forced out
29CFM50 Leakage Tests
- Provides information on how leaky the house is.
- Remember, how leaky, not how much leakage.
Amount of air movement depends on pressure! - Post air sealing test can give valuable feedback
on the success of your work. - Find where the holes are.
- Predictions on the impact of work.
30What does a CFM50 value tell you about the house?
- CFM50 is like a 20 mile per hour wind blowing on
all sides of the house. - From this value you can estimate the natural
leakage of a home (see appendix E in the BD
manual). - The CFM50 value can give you a good indication of
the total size of all the holes in a home. - A tenth (remove the last digit) of the CFM50
number is about equal to the square inches of
holes in the house. 1500 CFM50 about 150 sq.
inches of holes.
31Door Closure
- The average pressure that natural forces will put
on a house are between 1.5 Pa (low desert) to 3
Pa (high country). - Pressure created by door closure can be many
times higher than natural pressure. - The higher the pressures, the higher the
infiltration rate. - Room pressure tests will show if there is a
problem and help determine the solution.
BPI Analyst Certification Pressure Diagnostics
32Doors Closure
140º Attic
100º outside
1000 CFM supply flow
1000 CFM return flow
Return side will go negative.
Supply side will go positive
Close a door and block the flow back to the
return.
33Room Pressure
- Room WRT outside, interior door of room you are
testing closed, air handler on. - Test every room with a door and supply or return
register.
6.5
BPI Analyst Certification Pressure Diagnostics
34The following video is a time lapse infrared of a
home under negative 3 Pa pressure for 40
minutes. Note starting temperatures.
80.7
82.7
80.8
80.0
35(No Transcript)
36Temperatures after 40 minutes. 8 to 12 degree
increase in surface temperatures.
92.5
90.9
88.9
87.3
37The pressure is getting to me!
38 39 40Avoid negative pressuresin hot-humid climates
- Infiltration of warm, humid air
- Into walls
- Through chases
- Into rooms
Condensation on cool surfaces
41The Perfect House
42 Indoor Pollutants
43Sources of Home Moisture
An average family of four can generate over six
gallons of moisture per day.
Shower (excludes towels spillage)
1.0 pt / 10 minute shower Clothes
drying (vented indoors)
5.0 pt/ load Combustion (unvented space
heater) 7.6 pt/ gallon
of kerosene Cooking dinner (family of four)
1.2 pt(1.6 if gas
cooking) Floor mopping
1.5 pt/ 50
sq. ft. Respiration (family of four)
0.4 pt/ hour
Desorption of materials seasonal
6 to 17 pt/ day New
construction
10 pt/day Ground
moisture migration
Up to 100 pt/day 1.0 pint can
increase the RH by about 8 in a 1,500 sq. ft.
single floor home.
44Optimum Indoor Relative Humidity Levels.
45Sensible and Latent Heat
- Sensible heat The basic relationship between
energy and temperature - Example 1 Btu 1 increase in temperature of 1
lb of water
46Sensible and Latent Heat
- Latent heat The heat absorbed or released when
a material changes phase between a solid and a
liquid or between a liquid and a gas
47AIR CONDITIONING
- Utilizes the properties of latent heat to move
heat through a forced air distribution system - Cooling moves heat out of the house
- Removes Latent heat first
- Condenses water vapor back into liquid
48SIZING
- Over-sizing has a negative effect on energy use,
comfort, equipment life, and system costs - Oversized systems run for a short period and do
not reach steady state efficiency (think of city
vs. highway driving). Impacts both cost and
life. - Short run times mean that the air does not get
mixed, causing hot spots. - Short run times will not remove humidity,
increasing comfort problems. - Over sized equipment costs more to install.
49STEADY STATE EFFICIENCIES
- Mechanical devices take time to go from start up
to their peak, steady state efficiency. Some A/C
units will take minutes. (SEER incorporates this
start up time)
Steady State
SEER
Over sized system replaces steady state with
start-up, lowering efficiency.
Time
Start-up
50Kitchen Bath Moisture Control
- Bathrooms, kitchens and utility areas should be
vented to the outside never to attic or crawl
space. - Exhaust vents rarely discharge rated cfm
51Exhaust Vent Rules
- Size correctly
- 50 cfm bathroom venting standard (20 cfm)
- 100 cfm kitchen venting standard (25 cfm)
- 2. Exhaust to outdoor never into attic
- 3. Shortest vertical distance to outside or
direct vent through wall - Control bathroom exhaust with timer or humidistat
- Use aluminum piping without screws and taped
joints
If venting is continuous
52High humidity Poor/No Ventilation
Is the exhaust fan working properly?
Is the exhaust fan vented to the outside?
Is the fan operating long enough to remove
moisture?
53Clothes Dryer
- Dryer Rules
- Always vent to outside
- With mobiles vent beyond the skirting
- Do not vent into crawl spaces
- If possible direct vent to outside using smooth
metal piping - If elbows are needed, limit to two
54Ventilation
- Three basic types of ventilation
- Infiltration
- Natural ventilation (opening windows)
- Mechanical ventilation
- Whole house
- Spot
55Infiltration vs. Ventilation
56Mechanical Ventilation
- A fan that moves a measured amount of air into a
house (supply), out of a house (exhaust) or both
(balanced) - Ventilation systems must be selected to reduce
the potential for causing problems (mold) in the
building - Do not create positive (supply) pressures in
extremely cold climates - Do not create negative (exhaust) pressures in
hot/humid climates
57Do You Need Ventilation in an Existing Home?
- Depends
- First, does code apply? If so, follow code.
- If not (vast majority of weatherization work)
- What is in the home that needs to be vented
(pollution sources)? - How much ventilation does house already have
(fans and leakage)?
58Minimum Building Airflow(ASHRAE 62-89)
- American Society of Heating, Refrigerating and
Air Conditioning Engineers (ASHRAE) Standard
62-89 - 0.35 Natural Air Changes Per Hour (NACH)
- 15 cfm per person (15 per bedroom 15 for
Master) - which ever is highest
59ACH vs. NACH
- Air Changes per Hour (ACH) The volume of air in
a house that is exchanged each hour with air from
outside the house (ACH50 measured at 50 Pa) - ACH50 CFM50 x 60 min/hour house volume
- Example (single story, 3 bedroom home in
Phoenix) - 1,500 sq ft home x 8 ft ceilings 12,000 cu ft
- Measured leakage 1,500 cfm50
- 1,500 CFM50 x 60 12,000 cu ft 7.5 ACH50
60ACH vs. NACH
- Natural Air Changes per Hour (NACH) A
calculation of the infiltration rate of a home
under natural conditions (Home Energy,
Infiltration Just ACH50 divide by 20) - NACH ACH50 N
- Example
- 7.5 ACH50 (1 x 1.0 x 20) 0.375
N stories x shielding x climate factor
Stories 1 story 1.0, 1.5 story 0.89, 2
story 0.81 Shielding well shield 1.2,
normal 1.0, exposed 0.9 Climate factor for
Phoenix 20
61Minimum Building Airflow(BPI Calculation Method)
- 1,500 sf, 8 ft ceiling, single story, 3 bedroom
home, Phoenix - Step 1 0.35 x volume / 60
- 0.35 x 12,000 / 60 70 CFM
- Step 2 - occupants x 15 CFM/person
- occupants bedrooms 1 3 1 4
- 4 x 15CFM 60 CFM
- Step 3 choose the largest ventilation number to
calculate minimum air flow at 50 Pa - CFM50 ventilation target x N
- 70 CFM50 x 22 1,540 CFM50
- Phoenix N for single story 22, for two
story 22 x 0.81 17.8
62- Ventilation (whole house)
63- Ventilation (whole house)
64Ventilation (whole house)
Motorized Damper
65Ventilation (whole house)
- 6 supply duct to return delivers about 40 - 60
cfm of ventilation (for 3 ton 5 ton air handler)
66Health and Safety
- Health and safety should be 1 consideration when
testing and repairing homes! - Never do anything to save energy that has a
negative impact on health and safety. - All (existing and potential) health and safety
issues should be remedied prior to, or in
conjunction with, doing work.
Each individual organization needs to establish
its definition of remedied.
67REQUIRE IT!